CIVA status and on comet science - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

CIVA status and on comet science

Description:

Full 360 stereoscopic panorama. Microscopic analysis (VIS NIR) of each sample ... Few additional stereoscopic panorama: to monitor activity ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 32
Provided by: hsche4
Category:

less

Transcript and Presenter's Notes

Title: CIVA status and on comet science


1
CIVA status and on comet science
3rd post-launch Philae Science Team, Budapest,
18/12/2007
2
CIVA status and on comet science
3rd post-launch Philae Science Team, Budapest,
18/12/2007
3
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.

4
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.
  • Demonstrated by MSB CIVA-P images

5
CIVA P1 image during MSB
6
CIVA-P CAM 1 015321 LOBT
7
(No Transcript)
8
Cratères
with a pretty good image quality resolution,
focus
9
Cratères
with a pretty good image quality resolution,
focus
10
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.
  • Demonstrated by MSB CIVA-P images
  • Demonstrated by imaging ovens

11
empty oven ( 7)
12
empty oven ( 9)
13
calibration oven
14
empty oven ( 7)
15
empty oven ( 7)
empty oven ( 7)
10 µm spot
16
empty oven ( 7)
empty oven ( 7)
10 µm spot
17
empty oven ( 7)
empty oven ( 7)
10 µm spot
18
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.
  • Demonstrated by MSB CIVA-P images
  • Demonstrated by imaging ovens
  • 1st ESB MSB provide an accurate photometric
    calibration

19
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.
  • Demonstrated by MSB CIVA-P images
  • Demonstrated by imaging ovens
  • 1st ESB MSB provide an accurate photometric
    calibration
  • ? see concern 1, though

20
Civa status
  • Overall good health
  • For what could be tested (all but the IR
    detectors), all systems work nominally the 7
    CIVA-P cameras, CIVA-M/V in three colours.
  • Demonstrated by MSB CIVA-P images
  • Demonstrated by imaging ovens
  • 1st ESB MSB provide an accurate photometric
    calibration
  • SONC processing is perfect

21
CIVA status and on comet science
3rd post-launch Philae Science Team, Budapest,
18/12/2007
22
Civa on comet operations
  • CIVA concerns for on comet operations

23
Civa on comet operations
  • CIVA concerns for on comet operations
  • Concern 1 lower (than 32 ms) integration times
    required to avoid saturation of ultrabright spots
    ? S/W upload

24
Civa on comet operations
  • CIVA concerns for on comet operations
  • Concern 1 lower (than 32 ms) integration times
    required to avoid saturation of ultrabright spots
    ? S/W upload
  • The upload failures (PC6) likely due to a CDMS
    related problem, corrected in the new S/W version
    (TBC) ? PC8

25
Civa on comet operations
  • CIVA concerns for on comet operations
  • Concern 1 lower (than 32 ms) integration times
    required to avoid saturation of ultrabright spots
    ? S/W upload in PC8
  • Concern 2 data storage/uplink

26
Civa on comet operations
  • CIVA concerns for on comet operations
  • Concern 1 lower (than 32 ms) integration times
    required to avoid saturation of ultrabright spots
    ? S/W upload in PC8
  • Concern 2 data storage/uplink ? use of CDMS
    MM

27
Civa on comet operations
  • CIVA concerns for on comet operations
  • Concern 1 lower (than 32 ms) integration times
    required to avoid saturation of ultrabright spots
    ? S/W upload in PC8
  • Concern 2 data storage/uplink ? use of CDMS
    MM
  • ? no erase prior to validation

28
Civa on comet operations
  • Primary science (first sequence)
  • Full 360 stereoscopic panorama
  • Microscopic analysis (VIS NIR) of each sample

29
Civa on comet operations
  • Primary science (first sequence)
  • Full 360 stereoscopic panorama
  • Microscopic analysis (VIS NIR) of each sample
  • Long term science
  • Few additional stereoscopic panorama to monitor
    activity
  • Microscopic analysis (VIS NIR) of each new
    sample

30
Civa on comet operations
  • Issue 1. energy
  • Not a severe issue
  • Issue 2. thermal
  • Not a severe issue
  • Issue 3. data volume
  • The most severe issue

31
Civa on comet operations
  • Conclusion
  • If landed tomorrow, CIVA would be ready to
    operate at full performances, with reduced
    contrast for bright surface spots.
Write a Comment
User Comments (0)
About PowerShow.com