Title: The Thirty Meter Telescope Project: China Delegation Meeting
1The Thirty Meter Telescope Project China
Delegation Meeting
- Gary H Sanders, TMT
- June 4, 2009
2Goals for this meeting(For discussion)
- To establish a current list of technical
capabilities exercised in China for astronomy
telescopes and instrumentation that may be of
interest to joint work in TMT - To define a matrix of possible areas for Chinese
participation in TMT design and construction,
taking into account current partner interests and
new opportunities - To define areas of participation in TMT by China
that are new opportunities - To define action items for further exploration of
Chinese-TMT opportunities - To define the goals and possible itinerary for a
technical visit by TMT to China
3Agenda(for discussion)
- June 4th 9am-noon TMT HQ
- Session Introduction to LAMOST and TMT
- (1) LAMOST project (Zhu) 40 minutes
- (2) Introduction to NIAOT (Zhu) 30minutes
- Break 20 minutes(3) Overview of TMT project
(Sanders) 40 minutes - (4) Discussions, Chinese technology interests and
capabilities for TMT (All) (40minutes) - 12 -- 1pm Lunch at TMT HQ
- 130pm - 5pm
- Session Introduction to opportunities in TMT for
new partners - (1) Telescope details (Larry Stepp)
(30minutes) - Discussion --- 30 minutes
- (2) Adaptive Optics (Brent Ellerbroek)
(30minutes) - Discussion --- 30 minutesBreak 20minutes(3)
Instruments (Crampton) (30minutes) - Discussion 30 minutes
- 600pm Dinner at Athenaeum
- June 5th 9am -- 12 noon TMT HQ
- Session Continues Introduction to TMT and to
opportunities in TMT for new partners - (1) Options for Chinese participation
--- Matrix of possibilities
(Sanders) 45-60 minutes ---
Discussion on specific areas where China could
contribute to TMT, export restrictions and formal
issues, project governance and management,
implementation plan - Break 20 minutes
4(No Transcript)
5(No Transcript)
6(No Transcript)
727.6 R
827.6 R
9(No Transcript)
10Light collection increases as D2
11A Vision with TMT Distant GalaxiesTMT with
Adaptive Optics
Credit M. Bolte
12TMT Aperture Advantagewith Adaptive Optics
- Seeing-limited observations and observations of
resolved sources - Background-limited AO observations of unresolved
sources - High-contrast AO observations of unresolved
sources
13Galactic Center Astrometry (Keck)
14TMT Formation and Status
15TMT Formation
- TMT responded to the 2001 US National Academy of
Sciences Decadal Survey recommendation that a
public-private partnership is the best way to
build and operate a US-led 30-m telescope, the
1st priority large ground-based project - In 2003, the TMT partners unified teams from
three precursor ELT studies - This was a major step in joining private public
sectors in optical astronomy
16Three Precursor StudiesCELT, VLOT, GSMT
17- 30m filled aperture, highly segmented
- Three mirror telescope
- f/1 primary
- Field of view 20 arcmin
- Elevation axis in front of the primary
- Wavelength 0.31 28 µm
- Operational 1 thru 65
- Seeing-limited mode
- Adaptive optics mode
18Design Development Phase (DDP)
- April 2004 to March 2009 (completed)
- 80 million invested in design and development
- 50M provided from Gordon Betty Moore
Foundation (Caltech/UC) - 17.5M provided from Canada
- 10.0M funding provided by the US National
Science Foundation through AURA - 80 full-time equivalent staff working on TMT
- Site testing is complete
- Most systems now in Preliminary Design
- Critical components now fabricated and in test
- Team and design approaching construction readiness
19Transition to Construction
- Transition to Construction
- This phase started April 2009
- Goals
- select site
- complete construction project readiness
- form the construction project partnership
- On site construction to start as early as October
2010 - 300 million construction fund pledge already
made by Moore Foundation, Caltech and UC - First 30 million has just been sent to us
- This is a very good start !
- Construction Phase planned 2010 - 2018
20Design Status
21Observatory Layout Telescope
LGSF launch telescope
M2 support tripod
M2 structural hexapod
Tensional members
LGSF beam transfer
M2 hexagonal ring
M2 support columns
Elevation journal
Nasmyth platform
Azimuth cradle
Laser room
M1 cell
Azimuth truss
22Secondary Mirror (M2) Design Studiesby NOAO,
CSA, Quartus, SAGEM
23Tertiary Mirror (M3) Design Studiesby NOAO,
GDST, IMTEC
24Nasmyth Configuration First Decade Instrument
Suite
25Segment Size
26Primary Mirror Segments
- TMT segmented mirror is an evolution of the Keck
mirror - TMT is now working with industrial partners to
fabricate first full size TMT segments - 36 segments, 1.8m, in each Keck telescope
- 84 segments fabricated
- Keck segment company is now working on TMT
segments - TMT needs 574 segments, 1.45m
- Polishing and segment module fabrication must be
mass produced to cost and quality
27Keck segment and support assembly
28The TMT Primary Mirror System
29The TMT Primary Mirror System
Prototypes of all M1 System components will be
built and tested by the end of the year
30Segment Support AssemblyPrototype Testing
31Primary Mirror Control SystemPhase 1 Test Bed
Phase 1 Test Bed transfer function measurements
31
32Primary Mirror Control System (M1CS)
33M1CS Actuator Prototypes
1st generation soft actuator (P1) Marjan Research
Piezo pump hydraulic actuator TPG
2nd generation soft actuator (P1) Marjan
Research
PZT/Motor hard actuator JPL
33
34M1CS Sensor Prototypes
Inductive Sensors (Fogale)
Capacitive Sensor (LBNL)
Sensor built on flexible substrate
Flexible substrate sensor under test
TMT P1
Electroplated Sensor
34
35Full Size Primary MirrorSegment Polishing
Underway
36Full Size Primary MirrorSegment Polishing
Underway
- Development completed or in progress in firms in
US, Europe, Japan - Tinsley California
- ITT New York
- Zygo Connecticut
- SAGEM Paris (E-ELT)
- NanoOptonics Gifu
- Mitsubishi Hyogo
- Cranfield consortium UK (E-ELT)
37Active Control Summary
- Item Keck TMT
- segment size 1.8m 1.45m
- segments 36 492
- edge sensors 168 2772
- actuators 108 1476
38Progress on the TMT Telescope
- Primary mirror segments now being fabricated and
tested - Segment support systems, actuators, edge sensors
fabricated and under test - Secondary and tertiary mirror systems designed in
parallel in multiple independent firms - Telescope mount and structure is in Preliminary
Design phase - Structural and dynamic models demonstrate
requirements are satisfied
39Keck Laser Guide Star Facility
4073 x 73 (4200) Actuator TMT AO Deformable Mirror
41Deformable Mirror and Tip/Tilt Stage
- 20 Hz Tip/tilt stage prototype demonstration
substantially exceeded our requirements
ü
Eliminates extra tip-tilt mirror !
42Wavefront Correctors Prototyping Results
Prototype Tip/Tilt Stage
Simulated DM Wiring included in bandwidth
demonstration
Subscale DM with 9x9 actuators and 5 mm spacing
20 Hz Reqt
-3dB TTS bandwidth of 107 Hz at -35C
Low hysteresis of only 5-6 from -40 to 20 C
43TMT AO Early Light Architecture
- Narrow Field IR AO System (NFIRAOS)
- MCAO LGS AO System
- Mounted on Nasmyth Platform
- Feeds 3 science instruments
- Laser Guide Star Facility (LGSF)
- Laser enclosure located within telescope azimuth
structure - Conventional optics for beam transport
- Laser launch telescope behind M2
NFIRAOS - 190nm RMS WFS - 60x60 order system - 2
DMs, 6 LGS, 3 TTF WFS - 800Hz
44Progress on TMT Adaptive Optics
- Preliminary Design Review successfully passed in
November 2008, validating design and performance - Critical deformable mirror prototype passed
actuation tests at low temperature - Tip-tilt stage exceeded performance requirements
in testing eliminating need for additional mirror
in TMT - Guidestar laser design based upon lasers now
being delivered to Keck and Gemini - Critical Real Time Controller computer design has
passed design reviews
45TMT Science Instruments
46TMT Early Light Instrument Suite
47Feasibility studies 2005-6 (concepts,
requirements, performance,)
IRIS
MIRES
HROS-UCSC
HROS-CASA
PFI
IRMOS-UF
WFOS-HIA
IRMOS-CIT
48IRIS Infrared Imaging Spectrograph
Integral Field Spectrograph and Imager working at
the diffraction limit, 0.8 - 2.5mu
- Imager (Japan)
- 4K detector, 15 sq field, 4mas pixels
- Astrometric capability
- Lenslet IFS (UCLA)
- Finest scales
- Best wavefront error
- Image Slicer (Caltech)
- Coarser scales, larger fields
- Best sensitivity
- NGS wavefront sensors (HIA, Caltech)
2
IFU apertures
Imager
NGS guide probes (3)
49IRIS Diffraction Limited Imager, Slicer and
Lenslet Integral Field Spectrograph
NFIRAOS MCAO system (Enclosure at -30C)
- Imager 17x17, 4 mas pixels
- Precision photometry
- 30microarcsec relative astrometry
- Lenslet Integral field Spectrograph
- 128 x 128 lenses
- Bandpass 5/exposure
- Finest scales (4, 9 mas), best wfe
- Slicer IFS
- 45 slices, field up to 2x4
- 25, 50 mas scales
- Best sensitivity
- IFSs share camera and detector
Imager
Lenslet and slicer foreoptics
Common camera and detector
50WFOS Wide Field Optical Spectrograph
- WFOS the only seeing limited instrument at first
light - Needs to encompass more single object, broad
wavelength discovery and follow-up science (as
well as survey science) - Should be relatively simple, easy to commission
- MOBIE Echelette design currently being studied
by UCSC - Full wavelength coverage even at highest
resolution - Simple, single barrel design with R1300 and
R7500 and fixed dichroic beamsplitter at 550nm
51Multi-Object Broadband Imaging Echellette (MOBIE)
52A Cross-Section of IRMS
- Pupil Mechanism (Lyot Stop)
- Grating/Mirror Exchange Turret
- Keck I Cassegrain Envelope
- Cryogenic Slit Mask Unit (CSU)
- Figure 21 Section view of MOSFIRE
53MOSFIRE in Caltech Lab
TMT prototype MOSFIRE integration and test
proceeding well
54Progress on TMT Science Instruments
- TMT Science Advisory Committee has advised
project to include 8 instrument types for first
TMT decade - Broad community-based feasibility studies
completed in 2006 - Conceptual design studies now underway for 2
early light instruments IRIS and WFOS - Third early light instrument is a copy of Keck
MOSFIRE now being fabricated - Additional first decade instrument studies
planned in future as partnership forms - New partners may participate in early light
instruments as well as next round of instruments
55Armazones Facility Design
56Mauna Kea Facility Design
57TMT Calotte Enclosure and Facility
TMT.PMO.PRE.08.012.REL01
57
58TMT Calotte Enclosure
59Aero-Thermal Effects Modeled
Dome seeing
Wind through opening
M2 buffeting
M1 seeing
M1 buffeting
Wind through vents
60Z65o-A180o
Wind speed contours with 100 vents open (flow
along x, Uo 5 m/s)
61From Construction Sequence Fixed Enclosure
Structural Steel
62From Construction SequenceEnclosure Aperture
Ring
- Aperture ring girder (4T x 10m sections) is
assembled on top of the falsework tower
63Progress on TMT Facilities
- Summit facilities under design for construction
start as early as October 2010 - Calotte enclosure is in Preliminary Design
- Computational fluid dynamics simulations and wind
tunnel tests validate ventilation and wind
protection requirements - Construction and erection sequence planned in
detail for summit facilities, calotte enclosure
and telescope structure
64Site Testing
65Global Satellite Studies (Erasmus)Visible
Through Infrared Coverage
Introduction
Sample satellite images sectors of the study area
(18oN to 40oN and 96oW to 124oW) on March 20,
1998 at 0845UT Visible Infrared
window Water vaporchannel (0.55µm)
channel (10.7µm) channel (6.7µm)
66Chile Site Locations
Tolar
La Silla Las Campanas AURA
ALMA
Santiago
Tolonchar
Armazones
Paranal
67Armazones 3064m
T3
T2
684210m
T3
T2
69Turbulence Profiles - Tolar
- Cn2 profile
- sorted by
- seeing
70Progress in Selecting 5 ? 2 ? 1 Site
- All 5 TMT test sites have proven to be
outstanding and would make fine sites for TMT - There are differences in their attributes
- Mauna Kea (northern hemisphere) and Cerro
Armazones (southern hemisphere) have been
selected for further study and for regulatory,
economic, legal and pragmatic consideration - TMT Observatory Corporation has been recognized
as an international organization by the
government of Chile and our Chilean Environmental
Impact Statement has been approved by Chilean
authorities - The Environmental Impact Statement process is now
underway in Hawaii - TMT Board site decision milestone is July 2009
71The Project
72Deliverable Oriented WBS to Level 3
73Deliverable Oriented Project Organization
74Current TMT Effort
- Pasadena Project Office 40 FTE
- AURA/ACURA/HIA/JPL/Caltech/UC 145 heads - 80
FTE - Individual technical consultants 26 heads
- Significant industry or laboratory contracts 32
- Current open Work Packages (overlaps contract
count) - ACURA 24
- AURA 17
- UC 13
- Caltech/JPL 12
- TOTAL - 66
75TMT Construction Cost and Schedule
- Rigorously estimated with more than 840 estimate
pages - Schedule contains more than 4500 tasks
- Scope is complete observatory with facility AO
and three early light instruments (IRIS, WFOS,
IRMS) - Budgeted Cost for TMT 759.7 million (2009US)
- Contingency 227.2 million at 29.9
- Total 986.8 million (2009US)
- This estimate is for the reference Armazones case
76Schedule forDesign Development Phase (DDP)
- Start of DDP Apr 2004
- Selection of reference design Oct 2004
- Conceptual design review May 2006
- Cost review Sep 2006
- Construction Proposal review Jun 2007
- Site testing report Jun 2007
- Construction funding requests Oct 2007
- Design and site review Sep 2008
- End of DDP Mar 2009
77Technically-Paced Reference Schedule for
Construction
- Start of transition phase April 2009
- Site selection July 2009
- On site construction - Chile Oct 2010
- On site construction - Hawaii Oct 2011
- First light, all segments phased Oct 2018
- Begin science with 1st instrument Dec 2018
78Strong Funding Start
78
79Summary
- TMT Design Development Phase is completed
- A detailed design has been achieved
- Critical components across many systems have been
fabricated and are under test - A strong core project team is in place
- Canada, Caltech, UC are partners in TMT
- Japan has signed agreement and is participating
in TMT - First construction funding has been raised
- During the current phase we will
- Complete readiness for construction
- Form the construction partnership
- Many opportunities exist for new partners in TMT
80www.tmt.org/foundation-docs/index.html
TMT Foundation Documents
- Science Requirements Document
- Detailed Science Case 2007
- Observatory Requirements Document
- Observatory Architecture Document
- Operations Concept Document
- TMT Construction Proposal
- Currently in use for funding proposals
81Acknowledgments
- The TMT Project gratefully acknowledges the
support of the TMT partner institutions. They are
the Association of Canadian Universities for
Research in Astronomy (ACURA), the California
Institute of Technology and the University of
California. This work was supported as well by
the Gordon and Betty Moore Foundation, the Canada
Foundation for Innovation, the Ontario Ministry
of Research and Innovation, the National Research
Council of Canada, the Natural Sciences and
Engineering Research Council of Canada, the
British Columbia Knowledge Development Fund, the
Association of Universities for Research in
Astronomy (AURA) and the U.S. National Science
Foundation.
82(No Transcript)
83Slides from second day
84Stages to Partnership in TMT
- The first stage is Observer Status at the TMT
board and the TMT Science Advisory Committee
(SAC) that would provide increased familiarity
with the project and would be initiated by an
exchange of letters. - Participant Status would be subsequently
established with a Memorandum Of Understanding
(MOU) indicating an intention to find and
contribute funds to the project. This stage
would include voting status on the SAC, detailed
technical interaction with the project, and
regular meetings with the TMT Strategy Group. - NAOJ is a participant
- Full Partnership Status would be based on an
agreement on the level of participation and would
result in ownership that is exercised through
membership on the board of directors of the TMT
Observatory Corporation with full voting rights
on all decisions taken by the board. - Caltech, University of California and ACURA
(Canada) are partners.
85Export Restrictions
- The USA has legal restrictions on the export of
certain information, technologies and equipment - These apply to China
- Some of these restrictions will apply to TMT
technology - These restrictions should not prevent most joint
activities involving TMT and China - International science projects regularly deal
with these restrictions - We will respect these restrictions in forming any
joint work - We will apply for export licenses when possible
86Example Opportunities in TMTfor New Partners
- Technical Systems
- Secondary Mirror System including optics,
structures, controls - Tertiary Mirror System including optics,
structures, controls - Primary Mirror System components including
optics, structures, controls - Laser Guide Star Facility (LGSF)
- Observatory Software and data systems
- Infrastructure
- Buildings, power plants, HVAC systems
- Steel, concrete, rebar, commodities, cranes
- Heavy construction
- Science Instruments collaborate in Early Light
Instruments and AO systems - Design, simulation, fabrication, supply
components - Scientific analysis and simulation
87Mirror polishing(segments, secondary, tertiary)
- Primary mirror segments (possible roles for
China) - Generation of aspheric surface
- Polishing
- Cutting to hexagonal shape
- Final finishing after hex cut
- Manufacturing segment support assemblies
- Joining segment with support assembly
- Optical testing
- Cleaning systems
- Coating systems
- Secondary mirror subsystem (entire or partial
system) - Tertiary mirror subsystem (entire or partial
system)
88The TMT Primary Mirror System
89Full Size Primary MirrorSegment Polishing
Underway
90Secondary Mirror (M2) Design Studiesby NOAO,
CSA, Quartus, SAGEM
91Tertiary Mirror (M3) Design Studiesby NOAO,
GDST, IMTEC
92Material for segments(Chinese VO2 glass)
- Candidate round blanks needed for test
- Japan interested in providing Ohara Clearceram
and in polishing all segments
93Full Size Primary MirrorSegment Polishing
Underway
94Active support and control for segments
- Segment support assembly system is designed and
prototypes are being tested - Chinese review of design and study of
manufacturing, integration and test in China is a
good opportunity - Actuators and edge sensors may be part of this
work
95Instruments (spectrograph)
- Science teams on ALL instruments
- Postdocs, graduate students at UCLA, UCSC, other
UC campuses, Caltech or HIA - WFOS-MOBIE
- optics mountings for ADC, cameras,
collimator(reflective), prisms - IRMS
- fabricating and integrating components of MOSFIRE
clone ( http//www.astro.ucla.
edu/irlab/mosfire/) with oversight and
collaboration of UCLA and Caltech - SUPERB opportunity to gain experience in
cryogenic instruments. - Future instruments
- leader or major partner in HROS or a new
fibre-fed multi-object moderate resolution
spectrograph - Partner in any of the other first decade suite
instruments IRMOS, NIRES, PFI (coronagraph?),
MIRES, IRMOS, WIRC
96Laser launch telescope, AO relay
- Conceptual design for Laser Guide Star Facility
(LGSF) exists for version with beam transport in
air - Laser likely to come from USA or Europe
- Opportunity to complete entire design of LGSF,
fabricate, assemble, integrate and test LGSF is
an excellent open opportunity - If China were involved in Secondary Mirror
subsystem, laser launch telescope would benefit
from coordinated work in China
97LGSF Design Approach
- Design consists of 3 systems
- Laser System within telescope azimuth structure
- BTO/LLT System, to transport beams to the
telescope top end and project them from the LLT. - Laser Safety System for protection of people,
observatory hardware, aircraft and neighboring
telescopes. - Design based upon existing LGSF systems (i.e.
Gemini North and Gemini South).
98LGSF Optical Schematic
99LGSF Top End Conceptual Design
- Diagnostic optical bench monitors beam alignment,
power, and quality - Asterism generator maps 3x3 pattern of beams into
desired asterism - Rotating K mirror maintains fixed asterism at the
LGS wavefront sensor focal plane - Laser launch telescope projects beams onto sky
- 0.5m aperture
- Off axis reflective design
- Pivot mount for telescope top end flexure
compensation - Convex secondary could be upgraded to DM for Up
link AO - 11 mirrors per beam (4 actuated)
100Enclosure
- DSL (Canada) has firm commitment to deliver the
rotating enclosure - Fixed base enclosure is a substantial project
that could be done by China - Current design by M3 Engineering, Tucson, Arizona
- All fixed summit facilities could be constructed
by China
101From Construction Sequence Fixed Enclosure
Structural Steel
102Armazones Facility Design
103Mauna Kea Facility Design
104Chinese engineers join otherparts of the work
- This is welcome in most areas of TMT
- Graduate student, postdoctoral fellows, and more
senior engineers and scientists may join other
parts of the work - Working in China
- Visiting TMT, Caltech, University of California,
Canada institutions - Such work done as visitors in USA and Canada may
be a very good way to learn details, begin to
contribute to work, guide the development of the
Chinese role in TMT, build personal and
institutional partnership
105Summary
- TMT Design Development Phase is completed
- A detailed design has been achieved
- Critical components across many systems have been
fabricated and are under test - A strong core project team is in place
- Canada, Caltech, UC are partners in TMT
- Japan has signed agreement and is participating
in TMT - First construction funding has been raised
- During the current phase we will
- Complete readiness for construction
- Form the construction partnership
- Many opportunities exist for new partners in TMT