Title: Corporate Presentation
1- Corporate Presentation
- November 2007
www.snowfield.com
2Corporate Information
- Incorporated 1987, British Columbia
- Extra - jurisdictional registration NWT, 2002
- Officers and Directors
- Robert T. Paterson, President, CEO and
Director - Marvin A. Mitchell, Director
- John J. Nagy, CFO and Director
- W. Gennen McDowall, Director
- Ticho Project Independent Geological
Consultants - - Aurora Geosciences Ltd
- Ticho Project Environmental Consultants
- - EBA Engineering Consultants Ltd
3Corporate Profile
- Recent Share Price 0.22
- 52 Week High/Low 0.44/ 0.115
- Shares Outstanding 77,880,869
- Long Term Debt none
4Chart TSX.VSNO November 15, 2007
5Corporate Objectives
- Advance the Ticho Diamond Project to a stage
where Snowfield becomes a take-over target. - Carry out operations in a professional,
environmentally and socially responsible manner. - Establish and maintain working relationships
with local communities.
6Ticho Diamond Project
How is Snowfield progressing with its search for
diamonds?
Acquisition of property in prospective
area Completion of regulatory process for
permits Geochemical and Geophysical
surveys Discovery of kimberlite body Kimberlite
proven to contain diamonds Extraction of bulk
sample - Completed Sept. 2007 Drill programs
to prove up further kimberlites
7Ticho Diamond Project
- Mud Lake area 5548.12 Ha
- Hurcomb area 1045.10 Ha
- Gten 16 418.04 Ha
- Red Claim Blocks 7181.58 Ha
- Fate Claim 1003.30 Ha
-
- Total Area - 15196.14 Ha
8Ticho Diamond Project
9Ticho Diamond Project
10Ticho Diamond Project
11Ticho Diamond Project
Allows for all-season exploration programs
12Ticho Diamond Project
52 kilometre ice-road normally useable January
into May
13Ticho Diamond Project
Property can also be accessed by air and water
14Ticho Diamond Project
Mud-Lake Aerial Photograph
15Ticho Diamond Project
Snowfields Work To Date
- Two Airborne surveys 2002
- Two Drilling programs (18 holes) during 2003
- Discovery of Mud Lake kimberlite Feb, 2003
- Permitting 2003 thru 2005
- Ground Geophysical Surveys April, 2003
- Till sampling summer 2003
- Line cutting summer 2003 2004
- Delineation Drilling 2004 - 2006
- Caustic fusion 2005 2006
- 500-ton kimberlite bulk-sample - Winter 2007
- Exploration drilling ongoing
16Ticho Diamond Project
Mud Lake - Technical Report Summary
- Exploration in the Drybones area has resulted in
the - discovery of the Mud Lake kimberlite.
- The kimberlite is up to 10 meters thick in a
single layer. - Mudlake contains three, and possibly more, sill
layers. - The kimberlite may come to the surface to the
north - and east of the current drill area.
- It is of hypabyssal origin, contains mantle
derived - pyropes and chromites and is diamondiferous.
-
17Ticho Diamond Project
Airborne Geophysical Surveys
18Ticho Diamond Project
Mud Lake Helicopter EM Survey
?
?
Possible outline of Kimberlite Outcrop Below
glacial till
Geophysical Anomalies
19Ticho Diamond Project
Winter Drilling Program - 2006
20Ticho Diamond Project
Kimberlite Intersection Borehole Snow 8 Mud Lake
21Ticho Diamond Project
Kimberlite Drill Core
22Ticho Diamond Project
Mud Lake Drill Core - Chemistry
23Ticho Diamond Project
Drybones Satellite Pipe DB II
24Ticho Diamond Project
Mud lake kimberlite is delineanated over approx
30.5 acres, and is open in 3 directions
25Ticho Diamond Project
26Ticho Diamond Project
Bulk Sampling Program Mud Lake Kimberlite Fall
2007
Sample Size 500 tonnes, (200 cubic
metres). Sample will be transported to Grand
Prairie, Alberta, for Dense Media Separation by
De Beers Canada in November 2007. The
saving to Snowfield will be approx. 1,000,000.
Snowfield bears no obligation to De Beers
with regard to the future of the Ticho Diamond
Project.
27Ticho Diamond Project
Bulk Sample Site Location
28Ticho Diamond Project
Drilling blast holes
29Ticho Diamond Project
Final blast of Mudlake bulk sample program
30Ticho Diamond Project
Removing post-blast debris
31(No Transcript)
32(No Transcript)
33(No Transcript)
34(No Transcript)
35(No Transcript)
36Bulk sample result expected Winter/Spring 2007/8
37(No Transcript)
38Ticho Diamond Project
Bulk Sample Process
39Ticho Diamond Project
Bulk Sample Process
40Ticho Diamond Project
Diamond Mines in Canada
41Ticho Diamond Project
Diamond Mines in Canada
42Ticho Diamond Project
2007 Winter drilling program target area
43- End of Presentation
- Thank you for your interest.