Corporate Presentation - PowerPoint PPT Presentation

1 / 43
About This Presentation
Title:

Corporate Presentation

Description:

Corporate Presentation – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 44
Provided by: McDo8
Category:

less

Transcript and Presenter's Notes

Title: Corporate Presentation


1
  • Corporate Presentation
  • November 2007

www.snowfield.com
2
Corporate Information
  • Incorporated 1987, British Columbia
  • Extra - jurisdictional registration NWT, 2002
  • Officers and Directors
  • Robert T. Paterson, President, CEO and
    Director
  • Marvin A. Mitchell, Director
  • John J. Nagy, CFO and Director
  • W. Gennen McDowall, Director
  • Ticho Project Independent Geological
    Consultants
  • - Aurora Geosciences Ltd
  • Ticho Project Environmental Consultants
  • - EBA Engineering Consultants Ltd

3
Corporate Profile
  • Recent Share Price 0.22
  • 52 Week High/Low 0.44/ 0.115
  • Shares Outstanding 77,880,869
  • Long Term Debt none

4
Chart TSX.VSNO November 15, 2007
5
Corporate Objectives
  • Advance the Ticho Diamond Project to a stage
    where Snowfield becomes a take-over target.
  • Carry out operations in a professional,
    environmentally and socially responsible manner.
  • Establish and maintain working relationships
    with local communities.

6
Ticho Diamond Project
How is Snowfield progressing with its search for
diamonds?
Acquisition of property in prospective
area Completion of regulatory process for
permits Geochemical and Geophysical
surveys Discovery of kimberlite body Kimberlite
proven to contain diamonds Extraction of bulk
sample - Completed Sept. 2007 Drill programs
to prove up further kimberlites
7
Ticho Diamond Project
  • Mud Lake area 5548.12 Ha
  • Hurcomb area 1045.10 Ha
  • Gten 16 418.04 Ha
  • Red Claim Blocks 7181.58 Ha
  • Fate Claim 1003.30 Ha
  • Total Area - 15196.14 Ha

8
Ticho Diamond Project
9
Ticho Diamond Project
10
Ticho Diamond Project
11
Ticho Diamond Project
Allows for all-season exploration programs
12
Ticho Diamond Project
52 kilometre ice-road normally useable January
into May
13
Ticho Diamond Project
Property can also be accessed by air and water
14
Ticho Diamond Project
Mud-Lake Aerial Photograph
15
Ticho Diamond Project
Snowfields Work To Date
  • Two Airborne surveys 2002
  • Two Drilling programs (18 holes) during 2003
  • Discovery of Mud Lake kimberlite Feb, 2003
  • Permitting 2003 thru 2005
  • Ground Geophysical Surveys April, 2003
  • Till sampling summer 2003
  • Line cutting summer 2003 2004
  • Delineation Drilling 2004 - 2006
  • Caustic fusion 2005 2006
  • 500-ton kimberlite bulk-sample - Winter 2007
  • Exploration drilling ongoing

16
Ticho Diamond Project
Mud Lake - Technical Report Summary
  • Exploration in the Drybones area has resulted in
    the
  • discovery of the Mud Lake kimberlite.
  • The kimberlite is up to 10 meters thick in a
    single layer.
  • Mudlake contains three, and possibly more, sill
    layers.
  • The kimberlite may come to the surface to the
    north
  • and east of the current drill area.
  • It is of hypabyssal origin, contains mantle
    derived
  • pyropes and chromites and is diamondiferous.

17
Ticho Diamond Project
Airborne Geophysical Surveys
18
Ticho Diamond Project
Mud Lake Helicopter EM Survey
?
?
Possible outline of Kimberlite Outcrop Below
glacial till
Geophysical Anomalies
19
Ticho Diamond Project
Winter Drilling Program - 2006

20
Ticho Diamond Project
Kimberlite Intersection Borehole Snow 8 Mud Lake
21
Ticho Diamond Project
Kimberlite Drill Core
22
Ticho Diamond Project
Mud Lake Drill Core - Chemistry
23
Ticho Diamond Project
Drybones Satellite Pipe DB II
24
Ticho Diamond Project
Mud lake kimberlite is delineanated over approx
30.5 acres, and is open in 3 directions
25
Ticho Diamond Project
26
Ticho Diamond Project
Bulk Sampling Program Mud Lake Kimberlite Fall
2007
Sample Size 500 tonnes, (200 cubic
metres). Sample will be transported to Grand
Prairie, Alberta, for Dense Media Separation by
De Beers Canada in November 2007. The
saving to Snowfield will be approx. 1,000,000.
Snowfield bears no obligation to De Beers
with regard to the future of the Ticho Diamond
Project.
27
Ticho Diamond Project
Bulk Sample Site Location
28
Ticho Diamond Project
Drilling blast holes
29
Ticho Diamond Project
Final blast of Mudlake bulk sample program
30
Ticho Diamond Project
Removing post-blast debris
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
Bulk sample result expected Winter/Spring 2007/8
37
(No Transcript)
38
Ticho Diamond Project
Bulk Sample Process
39
Ticho Diamond Project
Bulk Sample Process
40
Ticho Diamond Project
Diamond Mines in Canada
41
Ticho Diamond Project
Diamond Mines in Canada
42
Ticho Diamond Project
2007 Winter drilling program target area
43
  • End of Presentation
  • Thank you for your interest.

www.snowfield.com
TSX.VSNO
Write a Comment
User Comments (0)
About PowerShow.com