APPLYING PPP TO URBAN ROADS PORTSMOUTH PFI Fran - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

APPLYING PPP TO URBAN ROADS PORTSMOUTH PFI Fran

Description:

In order to ensure the availability of the network. Portsmouth PFI ... The indexation is based on a composite index combining both CPI and a ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 8
Provided by: VAL69
Category:

less

Transcript and Presenter's Notes

Title: APPLYING PPP TO URBAN ROADS PORTSMOUTH PFI Fran


1
APPLYING PPP TOURBAN ROADSPORTSMOUTH
PFIFrançois BIDARD
2
Portsmouth PFI
Portsmouth Highway Management Contract
A first in the UK, a country that has pioneered
PPP schemes applying the PFI concept to the
whole road system of a city
  • 480 km of streets and roads
  • 19 000 street lighting units
  • 84 structures
  • including street cleansing, winter maintenance
    and emergencies fence to fence.

3
Portsmouth PFI
The contract Some figures
An exceptional size about 400 M (650 M)
including works for
  • initial rehabilitation (5 years)
  • operations and maintenance (25 years)
  • renewals (after the first five years)
  • TOTAL 368 M

4
Portsmouth PFI
  • During the first 5 years the network must be
    brought to a certain standard
  • Road Pavement
  • Footways
  • Street Lighting
  • Bridges and Structures

This standard must be met each year during the
contract period (20 years)
5
Portsmouth PFI
  • During 25 years from day one the network must be
    managed according to specifications and minimum
    service standard
  • Routine Maintenance
  • Street Cleansing
  • Street Lighting
  • Bridges and Structures
  • Winter Maintenance

In order to ensure the availability of the network
6
Portsmouth PFI
  • Availability Payment characteristics
  • A monthly fixed fee, indexed, and subject to
    deductions in case of failure to satisfy the
    specifications
  • During the first five years, this payment steps
    up as long as the network conditions improve
  • The payment is subject to deductions for failure
    to meet minimum service standard
  • The indexation is based on a composite index
    combining both CPI and a construction related
    index

7
Portsmouth PFI
  • The deduction/penalty regime is quite
    sophisticated
  • Ensure the standard related to the network
    condition is met
  • Ensure the level of services is met
  • Ensure that contract is well monitored
  • The contract is based on self controlling the
    performances