SEA TAC example
  • 2 types of customers, coach arrival rate exp
    m1min 1st class arrival rate uniform 4-5min.
    1 Q for each class of customer, 1 server for 1st
    class uniform 5-8 mins, 4 servers for coach, 1_at_
    normal m15 sd5, 3_at_ uniform 5-10 min. How long
    each type of customer in line

2
Chapt 7 (portions)
  • Read/ Write Nodes (pgs 222-228)
  • Assembly Modeling (pgs 239-262)
  • Accumulate Node
  • Batch/ Unbatch Node
  • Control Statements

3
Interface Assembly
  • Build on Basic concepts from chapters 5 6
  • Able to integrate/ interface software with other
    programs
  • Provided by reading inputs from files,
    spreadsheets, databases
  • Then outputted to files, spreadsheets..
  • Able to model the assembly of entities into a
    single entity ie CPM, collect up to a certain
    then release entities
  • Also retrieve entities that were combined, ie
    separate parts after they were batched together
    for a specific process

4
Read Node
  • Used to read one or more values from an external
    file
  • Table 2.9 Users Guide

Node readin Read from spreadsheet three columns
of data 3 branches
5
Write Node
  • Used to write values to an external file ie .xls

Called sentoxls put in file called
airportque.xls send TNOW ATRIB(2) real values 3
decimal pt 1 following
6
Write Example
  • Single server to obtain table with 4 columns,
    entity , arrival time, wait time, system time

7
Assembly Modeling
  • Wait until four units of a order arrive before
    boxing and shipping
  • Start an operation that needs one bolt, one
    washer, one nut, spud wrench
  • Start activity pour foundation once activities
    of unslab elect, underslab, plumb, gravel
    compact are completed
  • Accumulate
  • Batch
  • Unbatch

8
Accumulate Node
  • Collect entities until a certain number are
    reached
  • When achieved the node is released

Save atrib of entity of
SR til subsequent release
of branches
FR til 1st release
9
  • Pert example

10
  • Pert example

11
Batch Node
  • Collect entities until a certain number are is
    reached
  • Then release a single entity that represents the
    batch
  • Typically used for modeling pallets and loads of
    cars/ trucks that accumulate before moving

Collecting values on ATRB..then released
Batch from when
Sorted on /default 1
12
UnBatch Node
  • Put entities of a batch back into the network or
    split an entity into multiple units
  • Individual entities of the batch are restored

13
  • Batch Unbatch example

14
  • Batch Unbatch example

15
Chapt 7 examples
  • Read example
  • 7-1 read the following into a model, valuse of
    ATRIB0, ATRIB1 and LTRIB1 from file
    ATTRIBUTES.DAT for 1000 entities

16
Chapt 7 examples
  • Write example
  • 7-2 (b) write out the values of current simulated
    time, the first real attribute, and the first
    integer attribute of the current entity to the
    file TRACE.DAT

17
Chapt 7 examples
  • 7-9 Use ACCUMULATE toa) all preceding activities
    must be completed before a successor can be
    started, b) any one activity must be
    completed before a follow one activity can be
    completed, c) 3 out of 5 activities must be
    completed before an activity can be completed
  • a)

3 predecessors
18
Chapt 7 examples
  • 7-9 Use ACCUMULATE to b) any one activity must
    be completed before a follow one activity can be
    completed, c) 3 out of 5 activities must be
    completed before an activity can be completed
  • b)

1 predecessors
Or use
19
Chapt 7 examples
  • 7-9 Use ACCUMULATE toc) 3 out of 5 activities
    must be completed before an activity can be
    completed
  • c)

1 predecessors
20
PERT Example
  • Collect entities until a certain number are is
    reached
  • When achieved the node is released
  • Concrete slab after excavation

21
PERT Example
  • Concrete slab after excavation

22
Control Statements
  • Class assignment
  • simulate model shown in figure 7-1 of book
  • show out put on xls chart
  • due 11/26

23
Where are we going
  • Skip Chapt 8, will do Chapt 9 11/19
  • Chapt 10 11/26
  • No class 12/3
  • Projects due 12/10