Final Year Projects (05/06) - PowerPoint PPT Presentation

About This Presentation
Title:

Final Year Projects (05/06)

Description:

Latest News Broadcast. Collecting the number of passenger. Route efficiency analysis ... access point (AP) List of MAC address in bus. Usage. Retrieve arrival ... – PowerPoint PPT presentation

Number of Views:100
Avg rating:3.0/5.0
Slides: 15
Provided by: Eri789
Category:
Tags: final | projects | year

less

Transcript and Presenter's Notes

Title: Final Year Projects (05/06)


1
  • Final Year Projects (05/06)
  • Windows Embedded Student ChallengE (WESC) 2006

Green Bus
Lok Cheong Kin (Edword) CHAN Shu Wing
(Cloud) KONG Chi Kin (Eric) Supervised by
MUPPALA, Jogesh K.
2
Presentation Outline
  • Introduction
  • Project Goals
  • System Architecture
  • Hardware
  • Project Implementation
  • Demo Scenario
  • Conclusions
  • Question and Answer

3
Introduction
Background
  • People prefer private vehicles
  • Over-use of lighting and air-conditioning
    facilities in public transportation vehicles

Problems
  • Traffic congestion
  • Air pollution
  • Waste of energy

4
Project Goal
Real Time Information Service
  • Bus Arrival Time
  • Latest News Broadcast

Fleet management
  • Collecting the number of passenger
  • Route efficiency analysis

Fleet management
  • Tracking the location of the bus
  • Capturing the snapshot on the bus

Energy Saving
  • Facilities controlling

5
System Architecture
Internet
Web Service
Database
6
Hardware
Hardware Structure
7
Hardware
Embedded System (eBoxII)
  • Vortex86 200MHz CPU
  • 128 MB SDRAM onboard
  • Parallel, Serial, USB Port
  • 10/100 Mbps LAN
  • AC97 CODEC Audio

8
Project Implementation (Key Functions)
  • Location Tracking
  • Keep scanning the available access point (AP)
  • List of MAC address in bus
  • Usage
  • Retrieve arrival time of bus
  • keep records for data analysis

9
Project Implementation (Key Functions)
  • Passengers Counting
  • Implemented with 8051 microcontroller, infrared
    emitter and sensor
  • Entrance and Exit
  • SerialPort class in .NET CF 2.0

10
Project Implementation (Key Functions)
  • Centralized Server
  • Administration Tools (web based)
  • Information Management
  • Bus Tracking Interface
  • Data Processing and analysis
  • Route and time Analysis

11
Demo Scenario
12
Project Result
  • Outcome
  • Monitor bus location
  • Count the number of passengers
  • Show the snap-short picture
  • Analysis collected data
  • Further work
  • Show video in the bus and at station
  • Facilities control in the bus

13
Conclusion
  • Reliable and predictable public transportation
    infrastructure
  • Environmentally friendly public transportation
    system
  • Energy saving

14
Question and Answer
Write a Comment
User Comments (0)
About PowerShow.com