Using M - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Using M

Description:

Using M – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 16
Provided by: WB1673
Category:
Tags: aamc | using

less

Transcript and Presenter's Notes

Title: Using M


1
Using ME to Improve Development Strategy
  • Lessons from Madagascar

2
The Madagascar Action Plan-MAP
  • A Well-structured, concise and
  • extremely well-advertised document.
  • http//www.un.org/esa/coordination/Alliance/MADAGA
    SCAR20ACTION20PLAN.htm

3
MAP Document
  • Eight Commitments (Not as broad as pillars)
  • Each Commitment presents 5 aspects
  • Current Situation (mini-Diagnostic)
  • Objectives
  • Strategies
  • Priority Projects and Activities
  • Indicators

4
MAP Example
5
From MAP to Results Framework
  • Structure for the Results Matrix
  • Objective
  • Expected Result
  • Indicator
  • Baseline
  • Year by Year Targets for the PRS or national
    development plan
  • Vehicle for producing the data (survey, annual
    report, etc.)
  • Accountability-Agency/Ministry responsible

6
Issues for Results Framework
  • Selection of SMART monitoring indicators
  • Reducing the need for survey-based data
  • Integrating the Results Framework into
    implementation

7
S-M-A-R-T-Quick Review
  • S-pecific
  • M-easurable (or Monitorable)
  • A-chievable (and/or A-ttributable)
  • R-elevant (and/or R-ealistic)
  • T-ime-Bound

8
SMART Indicators-Examples
  • If the PDO is To improve the food safety and
    quality of key meat products from smallholders in
    selected provinces
  • What would the indicator be?
  • Increase in the quality of meat products ?
  • Increase in the share of meat products that meet
    adequate quality standards ? (Measurable)
  • Increase in the share of meat products that meet
    adequate quality standards in selected provincial
    cities ? (Specific)
  • What about
  • Decrease in the number of safety breaches in
    targeted production chains in selected provinces
    ?
  • Decrease in the number (and severity) of safety
    breaches observed by veterinary services
    (slaughterhouses) in targeted production chains
    in selected provinces ? (Measurable and specific)

9
SMART Indicators-Examples
  • If the PDO is Improved national road network and
    road user satisfaction through technical,
    organizational effectiveness and service
    delivery
  • What would the indicator be?
  • Road user satisfaction increased
  • Road user satisfaction increased by at least 20
    percent by 2011 (time-bound)
  • Road user satisfaction with the overall
    performance of the Southwest province highway
    increased by at least 20 percent among key
    stakeholders by 2011 (specific, relevant ?)

10
Strategic Dimensions for ME
  • Sequencing and Timing of Activities
  • Strategic links within and between economic
    sectors
  • Prioritizing Activities
  • Budget constraint
  • What comes first, the strategy or the indicators?

11
Green Revolution Linkages
12
Tourism Linkages
13
Matching Indicators-1
  • Immediate Agricultural Goal
  • Annual rice production in tons
  • Rice yields per hectare in Regions 1, 2, 3
  • Diversification of Agriculture
  • Annual non-rice production in tons (e.g.,
    tomatoes, spinach, citrus, soybeans, milk)
  • HH consumption of non-rice farm products

14
Matching Indicators-2
  • Health Benefits of Improved Diet
  • Incidence of malnutrition in children under 5
  • Revenue Benefits from Sale of Agricultural
    Surplus
  • Producer surplus of non-rice products (Ar/HH)
  • Increase in farm revenue in Ar (avg. per HH and
    regional total)
  • Environmental Benefits from the Transformation to
    Modern, Stationary Agriculture
  • Increase in area in hectares under cultivation
    using GR inputs.
  • Decrease in area in hectares under Tavi
    cultivation
  • Reduction in the rate of deforestation (ha/year)
  • Budget allocation for the maintenance of
    protected areas (Ar/ha)

15
Good Practice
  • Begin with the initial national development plan
    with its diagnostics and relevant objectives and
    activities.
  • Progress to Results Framework with SMART
    indicators.
  • Integrate RF into implementation planning
  • Incorporate strategic elements such as
    inter-sector linkages and reinforce indicator
    selection.
Write a Comment
User Comments (0)
About PowerShow.com