Well Control in the 21st Century - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Well Control in the 21st Century

Description:

Red Adair, Boots Hansen, Coots Matthews. Well Control Contractors are publicly owned ... CWC 350 jobs in 2006. Well Control Services. Emergency Response ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 12
Provided by: toddre
Category:
Tags: 21st | century | control | coots | well

less

Transcript and Presenter's Notes

Title: Well Control in the 21st Century


1
Well Control in the 21st Century
2
History
  • Myron Kinley
  • Firefighting only at first
  • Capping came later
  • Relief well in Venezuela
  • Red Adair, Boots Hansen, Coots Matthews
  • Well Control Contractors are publicly owned

3
Well Control Services
  • 40 of jobs are blowouts
  • 60 of jobs are well control
  • Special services
  • Hot tap
  • Valve drill
  • Freeze
  • CWC 350 jobs in 2006

4
Well Control Engineering
  • Emergency Response Plans
  • Rig Inspections
  • Drilling Plan Reviews
  • Kick Simulations
  • Dynamic Kill
  • Relief Wells

5
Modern Day Well Control
  • Blowouts
  • 60 Drilling
  • 30 Workover
  • 10 Production
  • Fire is small percentage
  • Capping
  • Killing

6
Modern Day Well Control
  • Team formation is critical
  • Large number of personnel needed
  • Equipment needs can be extensive
  • Logistics

7
Case History
  • UGBO
  • Rig shut in on kick
  • 5 wells blowing out.
  • Fire at 5 acre broach near abandoned well.
  • Remove rig, remove BOP, cap and divert.
  • RU snubbing unit, snub in casing.
  • Dynamic kill.

8
Case History
  • Well blowing out washed out flowline.
  • Exit point 10' from well.
  • Power swivel stuck in rod basket.
  • 3 days with no action
  • Closed casing valve to control the blowout as per
    original recommendation.

9
Case History
  • Gas lift well on pad.
  • 30' conductor casing.
  • Operator attempted to control well.
  • Well caught fire.
  • CWC called.
  • RU pump line to kelly.
  • Killed well.

10
Modern Day Well Control
  • Pre-event planning
  • Well kills
  • Momentum kill
  • Dynamic kill
  • Special fluids
  • Blowout recovery
  • Brute force element will remain.
  • Kill well with pipe on bottom is a constant.

11
  • Questions?
Write a Comment
User Comments (0)
About PowerShow.com