SCHODACK CSD - PowerPoint PPT Presentation

1 / 30
About This Presentation
Title:

SCHODACK CSD

Description:

MHHS Addition of .40 FTE teacher for Mandarin Chinese program ... Year II PBIS/Wildcat Pride Initiative BOCES Service $4,500. 3. 4. BOARD OF EDUCATION ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 31
Provided by: sherrildan
Category:
Tags: csd | schodack

less

Transcript and Presenter's Notes

Title: SCHODACK CSD


1
SCHODACK CSD
  • 2008/09 DRAFT 3 BUDGET
  • APRIL 3, 2008

2
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 1) PROGRAM ENHANCEMENTS
  • Guidance Counselor Support 27,405
  • MHMS - Additional .50 FTE Guidance Counselor
  • Mandarin Chinese Instruction 21,491
  • MHHS Addition of .40 FTE teacher for Mandarin
    Chinese program
  • Tech Valley High School 18,000
  • Two tuitions for a Grade 9 and a Grade 10 student
    to attend Tech. Valley High School (Total Cost
    36,000, one additional student to attend for
    2008/09)
  • BOCES Aid in 2008/09 for one placement and in
    2009/10 for two placements
  • 2

3
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 2) K-12 Distance Learning Program through Capital
    Region BOCES 19,046
  • Total estimated cost of program in 2008/09
    114,466
  • E-RATE reimbursement, BOCES Aid and revenue
    offset from 4 courses hosted by the District
    reduce the 2008/09 Net Cost to approximately
    7,400
  • 3) MHMS Transformation Initiatives 13,183
  • Sunrise Scholars Before School AIS Program 304
    (Total estimated cost 13,299)
  • Follow-up MHMS Survey 8,379
  • Year II PBIS/Wildcat Pride Initiative BOCES
    Service 4,500
  • 3

4
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 4) CES TRANSITION COSTS
  • Moving Expenses - professional moving company
    68,000
  • Addition of 1.0 FTE Custodial Worker (part-year
    from Jan. June 2008) 24,664
  • OT Labor for moving and modular village set-up
    2,487 (100 hours)
  • Rubbish Removal 3,000 (3 dumpster loads _at_
    1,000)
  • Expanded Sonitrol Security System Monitoring
    through BOCES 8,185
  • Added BOCES Expenses to meet fire protection
    system code requirements 1,768
  • Technology Reactivation of high speed connection
    between MHHS and CES (prorated part-year cost)
    8,050
  • Increase in general supplies to facilitate larger
    square footage at CES 3,022 (offset by
    reductions in building repairs)
  • Utilities Electrical and natural gas estimates
    reflect adjustments to accommodate the transition
    from the CES Modular Village to the new expanded
    CES building

5
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 5) PROJECTED STAFFING CHANGES
  • Two teacher retirements
  • One teacher assistant retirement
  • Additions to current budget .75 FTE ESOL teacher
  • 6) SPECIAL EDUCATION TUITIONS
  • Private school tuitions projected at 10 increase
    over current cost and BOCES placements based on
    2008/09 projected rates
  • Total number of outside placements in budget is
    33 (25 Questar III BOCES, 3 Capital Region BOCES,
    5 private school) plus 2 half-day special needs
    CTE Placements
  • 7) CAREER AND TECHNICAL EDUCATION PLACEMENTS
  • Projected based on 2008/09 QIII billing
    projection (billing methodology based on a five
    year enrollment average)
  • 5

6
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 8) TECHNOLOGY REPLACEMENT
  • Total of 85,626 for instructional technology
    leases through BOCES
  • BOCES aidable
  • Third year payment of 28,246 for BOCES
    technology lease initiated in 2006/07
  • Second year payment of 20,202 for BOCES
    technology lease initiated in 2007/08
  • Initial year payment estimated at 37,178 for
    BOCES technology lease to be initiated in
    2008/09
  • Maintain 21,182 for instructional computer
    replacement through Computer Hardware Aid
  • Total of 9,000 for non-instructional technology
    replacement fund
  • 6

7
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 9) EQUIPMENT REPLACEMENT
  • District-wide fund for furniture and equipment at
    reduced level of 19,949
  • Funds to accommodate furniture and equipment
    replacement needs throughout the school year
  • Program and departmental equipment allocated
    based on identified needs/priorities
  • Requests will exceed available allocation
  • CLASSROOM/BUILDING REQUESTSMHHS - 37,482
  • Library - book shelves - 2,919
  • Library - furniture - 12,907
  • Science classroom - 30 lab stools - 1,316
  • Special Ed classroom - computer table - 462
  • Business Lab 20 lab chairs 1 chair - 3,977
  • Music Department choral risers - 10,285
  • Kitchen double-stack convection oven -
    5,616 7

8
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • CLASSROOM/BUILDING REQUESTS
  • MHMS - 20,134
  • Music Department 30 Nota Chairs/2 storage racks
    - 3,096
  • Music Department Music stand and storage cart -
    741
  • Science Classroom 14 science tables - 6,083
  • Cafeteria 6 replacement cafeteria tables -
    7,426
  • Building wide use 100 replacement folding
    chairs - 2,788
  • CES - (To be determined)
  • Equipment requests anticipated to be funded
    through the capital project.
  • Buildings and Grounds equipment replacement fund
    at reduced level of 21,702
  • 2 Lawn Tractors 5,038
  • 1 Snow Thrower 989
  • 1 Aluminum Trailer 2,150
  • Floor Scrubber 11,789
  • 2 Safety Cabinets for Flammable Liquids 1,472

9
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 10) BOCES SERVICES
  • Increases vary by program area based on 2008/09
    projected service costs
  • 11) HEALTH AND DENTAL INSURANCE
  • Projected increases in health insurance premiums
    vary based on plan (range of 3.9 15 Blue
    Shield 5, CDPHP 5.2, MVP 3.9, Express Scripts
    15) and utilize current plan enrollments
  • 12) MEDICARE REIMBURSEMENT
  • Based on current 5.6 increase in Medicare Part B
    premiums and projected enrollment in Medicare
    Part B
  • 13) INSURANCES
  • Auto Liability Insurance 3 increase over
    current premium, 5 for Umbrella
  • Student Accident Insurance 5 increase over
    current premium
  • Workers Compensation 3 increase over current
    premium plus special assessments
  • 14) SOCIAL SECURITY PAYROLL TAXES (FICA/MED)
  • 7.65 of estimated payroll 9

10
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 15) RETIREMENT SYSTEM EMPLOYER CONTRIBUTIONS
  • ERS 8.2 of estimated payroll
  • TRS 7.63 of estimated payroll
  • 16) BUILDING DEBT SERVICE ON BONDS, EPC AND BUS
    BANS
  • 2008/09 payments per existing debt service
    schedules
  • 2008/09 Initial Bond payment and BAN payment
    related to 2007 bond referendum (estimated at
    941,990, serial bond issuance in July 2008
    subject to change)
  • 17) ENERGY COSTS
  • Natural gas and electricity - budgeted based on
    pricing recommended by NYSMEC energy consortium
    with prorated adjustments for CES modular village
    and new CES building
  • Utilities estimates reflect power and lighting,
    electrical, cooling, heating (electrical and
    propane) for CES Modular Village
  • Electricity increases in budget (27,839 in
    buildings,1,160 in Bus Garage)
  • Natural gas increase in budget (18,804)
  • Bus fuel 10,000 increase from current budget
  • 18) ALL OTHER EXPENSE AREAS
  • Vary by program area 10

11
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGET
  • KEY ASSUMPTIONS FOR DRAFT 3 BUDGET
  • 19) STATE AID
  • 2008/09 Executive Budget Proposal Data from
    1/22/08. State aid revenues exclude 56,400 in
    Universal Pre-K Aid
  • 20) ASSESSMENTS
  • Due to the reassessment in the Town of Schodack,
    current data on 2008/09 property assessments has
    not yet been made available.
  • 21) HANNAFORD PILOT
  • Payment estimated based on current assessment
  • Actual payment collected will be based on final
    tax rate established in August 2008
  • 22) APPROPRIATED FUND BALANCE
  • Appropriated Fund Balance/Reserves of 920,000
  • 11

12
BOARD OF EDUCATION2008/09 RECAP OF 2008/09
BUDGET DRAFTS
  • TOTAL BUDGET INCR. INCR. TAX
    LEVY INCR.
  • DRAFT 1 21,914,109 2,125,451
    10.74 12.27
  • DRAFT 2 21,861,685 2,073,027
    10.48 11.76
  • DRAFT 3 21,612,008 1,823,350
    9.21 8.15
  • CONTINGENT 21,612,008 1,823,350
    9.21 8.15
  • DRAFT 4/BUDGET ADOPTION ON APRIL 24

13
BOARD OF BOARD OF EDUCATIONDRAFT 3 BUDGET
ESTIMATED EXPENDITURES 21,612,008 (9.21 )
  • 2007/08 2008/09 CHG CHG
  • INSTRUCTION 10,330,700 10,750,356 419,656
    4.06
  • INTERSCHOLASTIC ATHLETICS 181,856 185,792
    3,936 2.16
  • OPERATIONS MAINTENANCE 1,453,269
    1,620,351 167,082 11.50
  • TRANSPORTATION 1,067,353 1,116,039 48,686
    4.56
  • GENERAL SUPPORT 1,035,373 1,072,010 36,637
    3.54
  • COMMUNITY SERVICES 2,480 1,920 (560)
    -22.58
  • UNDISTRIBUTED 5,717,627 6,865,540
    1,147,913 20.08
  • TOTAL APPROPRIATIONS 19,788,658 21,612,008
    1,823,350 9.21
  • TOTAL DOLLAR CHG 1,823,350 TOTAL PERCENTAGE
    CHG 9.21


  • 13

14
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETINSTRUCTION STAFFING
  • ITEM 2007/08 2008/09 CHG CHG
  • BUILDING ADMINISTRATION 685,663 690,279 4,61
    6 0.67
  • INSTRUCTIONAL SALARIES K6 2,216,766 2,300,817
    84,051 3.79
  • INSTRUCTIONAL SALARIES 712 2,198,879 2,291,548
    92,669 4.21
  • SALARIES-SUBSTITUTE TCHRS 98,301
    102,499 4,198 4.27
  • SALARIES-AIDES/CLERICAL 94,728 99,384 4,656
    4.92
  • EQUIPMENT 24,375 24,085 (290) -1.19
  • PROFESSIONAL/OTHER SERVICES 2,100 3,007 907
    43.19
  • SUPPLIES 76,749 65,595 (11,154) -14.53
  • OTHER-TEACHING 22,364 20,564 (1,800)
    -8.05
  • TEXTBOOKS 36,478 49,689 13,211 36.22
  • BOCES-REGULAR PROGRAMS 41,565 43,819 2,254
    5.42
  • BOCES-SPECIAL ED. 1,261,628 1,459,238 197,61
    0 15.66
  • DISTRICT-SPECIAL ED. 1,593,925 1,618,533 24,
    608 1.54
  • OCCUPATIONAL EDUCATION 251,838 173,221 (78,6
    17) -31.22
  • SPECIAL SCH. (SUMMER, A.E.) 72,526 102,315 2
    9,789 41.07

15
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETINTERSCHOLASTIC ATHLETICS
  • ITEM 2007/08 2008/09 CHG CHG
  • SALARIES 122,141 126,077 3,936 3.22
  • EQUIPMENT 0 0 0 0.00
  • GAME OFFICIALS 26,500 26,500 0 0.00
  • SPORTS TRIPS 0 0 0 0.00
  • SUPPLIES 10,880 10,880 0
    0.00
  • UNIFORMS 6,560 6,560 0 0.00
  • CONTRACTS AND OTHER 15,775 15,775 0 0.00
  • TOTAL 181,856 185,792 3,936 2.16
  • TOTAL DOLLAR CHG 3,936 TOTAL PERCENTAGE CHG
    2.16

16
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETOPERATIONS MAINTENANCE
  • ITEM 2007/08 2008/09 CHG CHG
  • SALARIES 676,803 719,292 42,489 6.28
  • EQUIPMENT 47,649 41,651 (5,998) -12.59
  • CONTRACT SERVICES 113,714 179,094 65,380
    57.50
  • TRAVEL/CONFERENCE 2,600 2,000 (600) -23.08
  • ELECTRICITY 217,254 245,093 27,839 12,81
  • TELEPHONE 40,852 45,610 4,758 11.65
  • EQUIPMENT REPAIR 2,000 2,000 0 0.00
  • BUILDING REPAIR 79,100 72,800 (6,300)
    -7.96
  • BUILDINGGROUNDS UPKEEP 15,900
    18,000 2,100 13.21
  • FUEL OIL 5,000 5,000 0 0.00
  • NATURAL GAS 184,507 203,311 18,804
    10.19
  • SUPPLIES 51,758 54,780 3,022 5.84
  • BOCES COSTS IN CATEGORY 16,132
    31,720 15,588 96.63
  • TOTAL 1,453,269 1,620,351 167,082 11.50
  • TOTAL DOLLAR CHG 167,082 TOTAL PERCENTAGE CHG
    11.50

17
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETTRANSPORTATION
  • ITEM 2007/08 2008/09 CHG CHG
  • SALARIES-REGULAR/OTHER 805,630 854,644 49,014
    6.08
  • EQUIPMENT 8,803 8,797 (6) -0.07
  • INSURANCE 45,414 39,181 (6,233) -13.72
  • PARTS SUPPLIES 62,005 56,260 (5,745)
    -9.27
  • GASOLINE/DIESEL FUEL 89,600 99,600 10,000 11.
    16
  • CONTRACTED SERVICES 22,462 21,462 (1,000)
    -4.45
  • GARAGE BUILDING 32,835 35,095 2,260 6.88
  • CONTRACT TRANSPORTATION 0 0 0 0.00
  • BOCES - TRANSPORTATION 604 1,000 396 65.56
  • TOTAL 1,067,353 1,116,039 48,686 4.56
  • TOTAL DOLLAR CHG 48,686 TOTAL PERCENTAGE
    CHANGE 4.56

18
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETGENERAL SUPPORT
  • ITEM 2007/08 2008/09 CHG CHG
  • BOARD OF EDUCATION 19,138 17,506 (1,632) -8
    .53
  • CENTRAL ADMINISTRATION 198,655
    202,787 4,132 2.08
  • BUSINESS ADMINISTRATION 234,569
    246,757 12,188 5.20
  • AUDITING 19,408 20,655 1,247 6.43
  • TREASURER/FISCAL FEES 65,103 65,492 389
    0.60
  • TAX COLLECTION 3,445 3,460 15 0.44
  • TAX REFUNDS 2,500 2,500 0 0.00
  • LEGAL SERVICES 36,140 33,947 (2,193)
    -6.07
  • CENTRAL PRINTING 122,017 125,103 3,086
    2.53
  • UNALLOCATED INSURANCE 66,991 74,234
    7,243 10.81
  • SCHOOL ASSOCIATION DUES 7,500 6,750 (750)
    -10.00
  • ASSESSMENTS 20,635 20,635 0 0.00
  • RECORDS MAINTENANCE 1,369 1,014 (355)
    -25.93
  • PUBLIC INFORMATION SERV. 22,816
    24,402 1,586 6.95
  • DATA PROCESSING (DIST.) 22,070
    20,440 (1,630) -7.39
  • BOCES COSTS IN CATEGORY 193,017
    206,328 13,311 6.90
  • TOTAL 1,035,373 1,072,010 36,637 3.54

19
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETCOMMUNITY SERVICES
  • ITEM 2007/08 2008/09 CHG CHG
  • STIPEND-CENSUS TAKERS 1,530 970 (560)
    -36.60
  • TRAVEL REIMBURSEMENT 700 700 0 0.00
  • SUPPLIES 250 250 0 0.00
  • BOCES-DATA PROCESSING 0 0 0 0.00
  • TOTAL 2,480 1,920 (560) -22.58
  • TOTAL DOLLAR CHG (560) TOTAL PERCENTAGE CHG
    -22.58
  • 2008/09 includes funds for the special education
    census only.

20
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETUNDISTRIBUTED - EMPLOYEE BENEFITS
  • ITEM 2007/08 2008/09 CHG CHG
  • EMPLOYEE RETIREMENT 218,202 206,438 (11,764)
    -5.39
  • TEACHER RETIREMENT 698,913 631,041 (67,872)
    -9.71
  • SOCIAL SECURITY 782,000 807,279 25,279
    3.23
  • WORKERS COMPENSATION 63,011 66,372 3,361
    5.33
  • UNEMPLOYMENT INSURANCE 9,947 8,000 (1,947) -1
    9.57
  • OTHER INSURANCE 10,700 13,800 3,100 28.97
  • HEALTH INSURANCE 2,443,599 2,695,669 252,070
    10.32
  • TOTAL 4,226,372 4,428,599 202,227
    4.78
  • TOTAL DOLLAR CHG 202,227 TOTAL PERCENTAGE CHG
    4.78

21
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETUNDISTRIBUTED - DEBT SERVICE PRINCIPAL
  • ITEM 2007/08 2008/09 CHG CHG
  • SERIAL BONDS 905,000 940,000 35,000 3.87
  • ENERGY PERFORMANCE 62,020 65,255 3,235 5.22
  • BANS-CAPITAL 0 0 0 0.00
  • BANS-BUSES 183,830 193,424
    9,594 5.22 TOTAL 1,150,850 1,198,679 47,
    829 4.16
  • TOTAL DOLLAR CHG 47,829 TOTAL PERCENTAGE CHG
    4.16

22
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETUNDISTRIBUTED-DEBT SERVICE INTEREST
  • ITEM 2007/08 2008/09 CHG CHG
  • SERIAL BONDS 270,250 651,325 381,075
    141.01
  • ENERGY PERFORMANCE 21,056 17,821 (3,235)
    -15.36
  • BANS-CAPITAL 0 527,562 527,562 0.00
  • BANS-BUSES 21,079 22,167 1,088
    5.16
  • RANS-CASH FLOW 0 0
    0 0.00
  • TOTAL 312,385 1,218,875 906,490
    290.18
  • TOTAL DOLLAR CHG 906,490 TOTAL PERCENTAGE CHG
    290.18

23
BOARD OF EDUCATION2008/09DRAFT 3
BUDGETUNDISTRIBUTED-INTERFUND TRANSFERS
  • ITEM 2007/08 2008/09 CHG CHG
  • SCHOOL LUNCH FUND 0 0 0 0.00
  • SPECIAL AID FUND 28,020 19,387 (8,633)
    -30.81
  • DEBT SERVICE FUND 0 0 0 0.00
  • CAPITAL FUND 0 0 0 0.00 TOTAL
    INTERFUND 28,020 19,387 (8,633) -30.81
  • TOTAL DOLLAR CHG (8,633) TOTAL PERCENTAGE
    CHG -30.81
  • TOTAL UNDISTRIBUTED 5,717,627 6,865,540
    1,147,913 20.08
  • TOTAL DOLLAR CHG 1,147,913 TOTAL PERCENTAGE
    CHG 20.08

24
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETTHREE-PART BUDGET
  • 2007/08 2008/09
  • PROGRAM 14,453,324 15,060,224
  • ADMINISTRATIVE 2,129,342 2,203,240
  • CAPITAL 3,205,992 4,348,544
  • TOTAL APPROPRIATIONS 19,788,658 21,612,008
  • TOTAL DOLLAR CHG 1,823,350 TOTAL PERCENTAGE
    CHG 9.21
  • ADMINISTRATIVE PERCENTAGE 12.84
    12.76

25
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGETSCHOOL
BUS PROPOSITION
  • BUS PROPOSITION 2007/08 2008/09
  • 238,000 240,000
  • 2008/09 PURCHASE OF THREE SCHOOL BUS VEHICLES (NO
    ACCELERATION OF PLAN)
  • Two (2) 65-passenger school bus vehicles _at_
    93,500/each
  • One (1) 30-passenger school bus vehicle _at_ 53,000
  • Upgrade video camera technology to digital video
    camera system (Added cost of est. 1,800 per bus)
  • FINANCED OVER FIVE YEAR PERIOD
  • FIRST PAYMENT DUE IN 2009/10 SCHOOL YEAR
  • AID ON FIRST PAYMENT IN 2009/10 BASED ON AN
    ASSUMED INTEREST RATE AND AMORTIZATION SCHEDULE

26
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGETTOTAL
ESTIMATED EXPENDITURES 21,612,008
27
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETESTIMATED REVENUES 21,612,008 (9.21)
  • 2007/08 2008/09 CHG CHG
  • FUND BALANCE/RESERVES 800,000 920,000
    120,000 15.00
  • PROPERTY TAXES/PILOT 11,003,133
    11,878,113 874,980 7.95
  • CHARGES FOR SERVICES 117,104
    116,600 (504) -0.43
  • USE OF MONEY PROP. 285,400
    223,900 (61,500) -21.55
  • SALE OF PROPERTY 36,000 1,000
    ( 35,000) -97.22
  • MISC. REVENUES 101,454
    134,314 32,860 32.39
  • STATE AID 7,314,567
    8,203,081 888,514 12.15
  • FEDERAL REVENUES 131,000
    135,000 4,000 3.05
  • TOTAL REVENUE 19,788,658
    21,612,008 1,823,350 9.21
  • 27

28
BOARD OF EDUCATION2008/09 DRAFT 3 BUDGETSTATE
AID
  • 2007/08 BUDGET(TAX LEVY) 2008/09 BUDGET
  • FOUNDATION AID 4,567,330 4,820,627
  • PUBLIC EXCESS COST AID-HIGH COST 288,343 222,4
    76
  • PRIVATE EXCESS COST AID 110,340 174,065
  • COMPUTER HARDWARE AID 13,156 20,240
  • TEXTBOOK AID 72,812 70,716
  • SOFTWARE AID 17,901 17,256
  • LIBRARY MATERIALS AID 7,468 7,200
  • TRANSPORTATION AID 1,002,343 1,042,698
  • BOCES AID 295,252 399,543
  • BUILDING AID 930,116 1,473,260
  • GROWTH AID 0 0
  • MEDICAID DEDUCT-STATE SHARE (55,000) (45,000)
  • OTHER AID-PYA/ DEF. 64,506 0______
  • TOTAL 7,314,567 8,203,081
  • 2007/08 2008/09 PROJECTED STATE AID BASED ON
    1/22/08 EXECUTIVE BUDGET PROPOSAL DATA. STATE
    AID
  • ESTIMATES EXCLUDING UNIVERSAL PRE-K AID OF
    56,400 AND INCLUDE MEDICAID DEDUCTIONS FOR THE
  • STATES SHARE OF MEDICAID REIMBURSEMENT. AID
    CALCULATIONS ARE BASED ON PROJECTION DATA UNDER

29
BOARD OF EDUCATION2008/09 STATE AID
TREND
30
BOARD OF EDUCATION2008/09 DRAFT 3
BUDGETCONTINGENCY BUDGET CALCULATION
  • CAP ON TOTAL SPENDING
  • 2008/09 DRAFT 3 Budget vs. Contingency Budget
  • PROPOSED CONTINGENT
  • 21,612,008 21,612,008
  • Required Cuts 0
  • 30
Write a Comment
User Comments (0)
About PowerShow.com