Title: Projected Construction Costs
1(No Transcript)
2Port San Antonio
- A closed Air Force Base (Kelly AFB) Comprised of
1,883 Acres and 9M SF of Leasable Industrial
Facilities and 700 Acres of Developable Sites - Foreign-Trade Zone (FTZ) 80-10 and a Federal
Empowerment Zone - 70 Businesses Employing 12,300 people
3Kelly Field
- A Military Joint-Use Airport Operated by the U.S.
Air Force with an 11,500 ft. Runway - A 575 Acre Industrial, Mixed-Use Airport Property
in a FTZ - Major Aerospace Industrial Center for Repairing
Overhauling Airplanes Engines - Emerging as a Full-Service, Heavy-Lift,
International Air Cargo Logistics Hub Capable
of Handling all Cargo Airplanes
4East Kelly Railport
- A 250 Acre Mixed-Use Industrial Property with
Direct Rail Access in a Foreign-Trade Zone - Emerging as a Warehousing Logistics Site for
International Capable Rail Transload Facilities
5Kelly Town Center
- A 125 Acre Mixed-Use Land Area for Redevelopment
of High-Density Uses Including Offices,
Residences, Restaurants and Community Services
that Permit People to Live, Work Play at Kelly
6Global Positioning
7Transportation Network
8Local Highway Rail Network
9Port San Antonio
10Port Master Plan
11Port Authority of San Antonio
- A Separate Political Sub-Division of the State of
Texas Established as a Business Entity in 1996 by
the City of San Antonio - 11 Member Board of Directors Comprised of
Business Leaders Appointed by the City - Professional Staff Trained in Port Services
Real Estate Management Development
12Mission
- Own, Operate Develop Kelly as a
Master-Planned, World-Class, Multi-Modal Port
Creating Quality Jobs and Generating Economic
Growth in South Texas
13Vision
- To develop Kelly into Port San Antonio
- A multi-modal logistics hub with an industrial,
- heavy lift international air cargo airport and
rail port
14Aerospace Complex
- 3.7 Million SF
- Major Aerospace Tenants who Modify, Repair
Overhaul Airplanes (Boeing, Lockheed-Martin,
GE, Standard Aero, Chromalloy, Pratt Whitney,
EGG Logistics Gore Design Completions)
15Federal Inspection StationAir Cargo
TerminalCorporate Aviation
16Airport Rates Charges Comparison
17Gore Design Completions, Ltd.
- 120,000 Square Foot Hangar, Office
Manufacturing Space on 9.8 Acres - 13MM Design / Build Project
- Largest Single Finish Center in North America
18Triple S Steel
- 204,230 Square Foot Steel Distribution Center on
13.8 Acres - One of the Largest Independent Structural Steel
Distributors in Texas - 8 MM project
19Office/Warehouse Complex
- 26.6 Acre Planned Site With Over 320,000 SF of
Class A Facilities - Available Spring 2005
- 145,600 SF Under Construction
20East Kelly Railport
- 250 Acres of Heavy Industrial Sites with
International Rail Access - 360,000 SF Rail-Served Warehouse Available
October 2006
21Trans-Pacific Corridor Through Lázaro Cárdenas
to San Antonio
22Cross-Border Service to San Antonio
Oakland
San Antonio
Ensenada
Dalian
Tianjin
Pusan
Yokohama
Shimizu
Qingdao
Nagoya
Kobe
Shanghai
Manzanillo
Ningbo
HongKong
Lazaro Cardenas
Kaohsiung
Chiwan
Manila
Bangkok
Port Kelang
Singapore
Jakarta
23Advantages
- Shorter inland distance and transit time vs.
west coast carriers - 7 days free time at port
- No FMC filing
- Support from railroad company KSC
- No Harbor Maintenance Tax (0.04 ad valorem)
- No additional paperwork required
- 6 days free time at the ramp
24San Antonio
Laredo
25(No Transcript)
26Container Transportation Cost Comparisons
27Jorge Canavati Vice President, Marketing 210 362
7814 jorge.canavati_at_kellyusa.com
Bruce Miller President CEO 210 362
7850 bruce.miller_at_kellyusa.com
866 535 5987 www.kellyusa.com