Segment 1: 8th to 15th ( mile) Curb-side Transit-Only Lane ... I-515 to Lamb Blvd. Nellis Blvd to Tropicana Ave. Extension of limits to replace area removed ... – PowerPoint PPT presentation

Number of Views:95
Avg rating:3.0/5.0
Slides: 20
Provided by: diarch
Category:

less

Transcript and Presenter's Notes

Title: Boulder Highway Bus Rapid Transit RFSOQ


1
Boulder Highway Bus Rapid TransitRFSOQ
09-106Construction Manager at Risk (CMAR)PWP
CL-2009-359
2
BRT Station Locations
3
Roadway Elements
  • Segment 1 8th to 15th (½ mile)
  • Curb-side Transit-Only Lane
  • Reconstruct per CLV Centennial Stds
  • 7-foot Edge Mill/1-inch UTACS Overlay
  • Raised Medians

4
Roadway Elements
  • Segment 2 15th to Bruce (¼ mile)
  • Curb-Side Transit-Only Lane
  • 15th to Bruce
  • 7-foot Edge Mill/1-inch UTACS Overlay
  • Raised Medians

5
Roadway Elements
  • Segment 3 Bruce to Eastern (½ mile)
  • Mixed Flow
  • 7-foot Edge Mill/1-inch UTACS Overlay
  • Raised Medians

6
Roadway Elements
  • Segment 4 Atlantic to Tropicana (5¼ miles)
  • Curb-Side Transit-Only Lane
  • Widen into median
  • Maintain 6 through lanes and bike lane
  • ¾-inch Mill/ ¾-inch Open Grade Overlay

7
Roadway Elements
  • Segment 5 Tropicana to Horizon (8¾ mile)
  • Mixed Flow
  • Curb-Side Stations w/ Concrete Bus Pads

8
Roadway Elements (cont.)
  • Concrete Bus Pads at Stations
  • 240 ft 100 Decel 70 Docking 70 Accel

9
Roadway Elements (cont.)
  • Upgrade SW Ramps at Signalized Intersections
  • Extend/Perpetuate Drainage Facilities

10
Roadway Elements (cont.)
  • Traffic Signal Mods at 18 intersections
  • 4 ITS Conduit w/ FO Cable (gt90,000 lf)
  • I-515/8th (CLV Signal Shop) to Horizon Dr
  • To CLV Signal Shop (28th/Charleston)
  • FAST Incident Cameras at 14 Intersections

11
Roadway Elements (Landscaping)
  • Fremont Street
  • Tree wells (8th St to 15th St)
  • Medians ( 8th St to Eastern)

12
Roadway Elements (Landscaping)
  • Restoration at Stations
  • Restoration of County SID
  • I-515 to Lamb Blvd
  • Nellis Blvd to Tropicana Ave
  • Extension of limits to replace area removed
  • Living Wall in COH Stations
  • Transplant Trees in Conflict with COH Stations

13
Station Elements
  • Shelter w/ Raised Concrete Platform
  • Ticket Vending Machines (TVMs)
  • CCTV Security Cameras
  • Passenger Info Systems (LED Monitor)

14
Station Elements (cont.)
  • Station Marker
  • Benches/Trash Cans
  • Handrail Behind Platform
  • Retaining Wall Behind Platform (if required)

15
Station Elements(City of Henderson)
  • Shade Screens
  • Living Wall

16
Project Stakeholders
  • NDOT Occupancy Permit
  • Traffic Control Submittal
  • Inspection

17
Project Stakeholders (cont.)
  • Coordination, Permit Inspection
  • City of Las Vegas
  • Clark County
  • City of Henderson
  • Utilities
  • NVE Electrical service pedestals
  • LVVWD Water service laterals adjustments
  • OTHERS Coordinate relocations and adjustments

18
Project Schedule (Tentative)
  • SOQ Due July 20, 2009
  • Pre-Qual Firms Aug 13, 2009
  • Final Proposal Due Sept 8, 2009
  • Contract Award (Phase 1) Oct 8, 2009
  • Execution of Agreement (Phase 2) Dec 19, 2009
  • NTP for Construction Dec 2009/
  • Jan 2010
  • Completion of Construction August 2011

19