1Bioretention and Underdrain Filters
2Overview
- Benefits
- Sizing
- Vegetated Underdrain Soil Filter Field
- Bioretention Cells
- Options
- Geotextile Fabric
- Layout
- Important Considerations
3Benefits
- Excellent pollutant removal
- High absorbtion
- Channel protection through slow release
- Cooling of stormwater through soil media
4Sizing
- Must retain 1.0 inch times the impervious area
plus 0.4 inch times the landscaped developed area - Must drain within 24 hours
5Vegetated Underdrain Soil Filter Field
Figure 7-1 of Volume III
6Vegetated Underdrain Soil Filter Field
31
Grass
Max 18
Pretreatment
4-6 slotted, schedule 40 PVC or SDR35
Energy Dispersion
Figure 7-1 of Volume III
7Bioretention Cell Treatment with Style
8Bioretention Cell
Native plant species
2-3 well aged mulch
Max 6 Ponding
4-6 slotted, schedule 40 PVC or SDR35
Figure 7-3 of Volume III
9Soil Filter Bed Option 1
18 soil filter 50-55 Sand 20-30 Topsoil with
minimal clay content and between 15-25 fines
passing the 200 sieve 20-30 shredded bark or
wood fiber mulch with lt 5 fines passing the 200
sieve
Resultant mixture should have between 5-15
passing the 200 sieve
Compact Soil by Saturation Only
10Soil Filter Bed Option 2
18 soil filter Coarse loamy sand
Resultant Mixture
20-30 shredded bark or wood fiber mulch with lt
5 fines passing the 200 sieve
Compact Soil by Saturation Only
11Pipe Bedding/Transition Zone Option 1
6 coarse gravel MEDOT 703.22 Type B
Min 4
12-14 crushed stone MEDOT 703.22 Type C
Underdrain pipes must be placed no further than 8
feet apart.
Min 4
12Pipe Bedding/Transition Zone Option 2
Underdrain pipes must be placed no further than 4
feet apart
Min 4
12-14 coarse gravel MEDOT 703.22 Type B
Min 4
13Geotextile Fabric
Geotextile fabric between gravel/crushed stone
bedding/ transition layer and adjacent soil only.
No fabric between soil filter and bedding layer.
14Layout
- Use existing site features to develop layout
15Pretreatment
- Grassed swales
- Grass or meadow filter strips
- Sediment traps
16Important Considerations
- Very important to minimize fines and meet the
specifications - Involve someone with plant experience when
selecting plantings (a plant list is provided in
Volume I, Appendix B) - Some contractors will begin to specialize in
building these systems to spec consider
involving them - Do not install soil media until catchment is
stable
17(No Transcript)