The Dirty Truth About Turbidity - PowerPoint PPT Presentation

1 / 36
About This Presentation
Title:

The Dirty Truth About Turbidity

Description:

The Dirty Truth About Turbidity – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 37
Provided by: lice195
Category:
Tags: dirty | gar | truth | turbidity

less

Transcript and Presenter's Notes

Title: The Dirty Truth About Turbidity


1
Item 5a
Zone 4 Line A
Sources Pathways and Loadings Workgroup May 22nd
2007
Rand Eads RiverMetrics LLC www.rivermetrics.com ri
vermetrics_at_gmail.com 503-435-7516
2
SiteLocation
Item 5a
Estudillo Canal
San Lorenzo Creek
Bockman Canal
Sulphur Creek
Zone 4 Line A
Old Alameda
3
Item 5
4
Item 5
5
Watershed Description
Item 5
  • 4.5 km2 area
  • 1.7 km upstream of the bay
  • Above the tidal influence
  • 65 industrial-commercial, 33 residential
  • 4 km of rail bed
  • Large impervious surfaces
  • Engineered urban channel, with numerous side
    drains

6
Item 5
7
Item 5
8
Item 5
9
Item 5
10
Item 5
11
Item 5
12
Item 5
13
Item 5
14
Item 5
15
Instrumentation
Item 5
  • Campbell data logger
  • DTS-12 turbidity sensor
  • Pressure transducer (stage)
  • ISCO automatic pumping sampler
  • Tipping bucket rain gage
  • Cellular modem
  • Solar panel

16
Turbidity Threshold Sampling
Item 5
  • Continuous, high-quality SSC records
  • Estimates concentration from turbidity
  • Obtains samples from every storm event
  • Samples validate the turbidity record
  • Reduces the cost of monitoring
  • Automates sample collection
  • Uses real-time turbidity to sample efficiently
  • More accurate sediment loads

17
Item 5
18
Item 5
19
Item 5
20
Item 5
21
Time of Concentration in Bay Area Watersheds
Guadalupe R. (8-10 hrs)
(40 acres)
(4 acres)
(Ref McKee et al., 2003)
San Francisco Estuary Institute
Item 5
22
Item 5
23
Item 5
24
Item 5
25
Item 5
26
Item 5
27
Item 5
28
Item 5
29
Item 5
30
Item 5
31
Item 5
32
Item 5
33
Item 5
34
Item 5
35
Boom Configuration
Item 5
  • Bridge-mounted boom
  • Hydroplaned on water surface at stage gt2 feet
    (with added weight)
  • Debris buildup
  • Range of sampling depth is more variable that
    with a bed-mounted boom
  • HY08 recommend small expenditure (1-2k) on
    redesign and redeployment of the current boom to
    a bed-mounted boom

36
Item 5
Write a Comment
User Comments (0)
About PowerShow.com