Title: Smart Well Technology in Shell
1Smart Well Technology in Shell
Smart Wells Add Value
- Carlos Glandt
- Case Studies Team EPT-AWS
2Value under Uncertainty
1
0.75
0.5
Prob of Prof lt X
0.25
0
-100
-50
0
50
100
NPV, MM
3Intelligent Well Principles Well and Field
Optimization
Production System Model Well/Facs Optimization
Multi-lateral
Well
Infrastructure
Reservoir Model Matching Field Development
Optimization
Interval Control Valves
Power
Comm.
P, T Flow Meas./Imaging
Downhole Processing
4Smart Well Value Opportunities
- Reducing Intervention Costs.
- Acceleration by Optimised Sequential Production.
- Acceleration by Commingled Production.
- Fluid Transfer Subsurface for Sweep or
Pressurisation. - Intelligent Infill Drilling.
-
- Improving Drive Processes (Waterflood and Gas
Drives). - Intelligent Production of Oil Rims.
- Increasing Reserves per Well (Intelligent
Multilaterals). - Accessing Reserves by Connecting Reservoirs.
- Intelligent Appraisals.
5iWell Technology adds value by
Smart Wells Add Value
- Optimizing the Production Profile while Reducing
Intervention costs.
6K1
K2
K3
7Production Profile Optimization
K3 and K2 only
4000
10
optimized profile
9
8
3000
7
sequential profile
6
oil rate bod
2000
5
zone on production
4
zone K3
3
1000
zone K2
2
1
0
0
0
2
4
6
8
10
12
14
years on production
8Cumulative Production
14
12
optimized profile
pv oil 9.8 MMbbl
10
sequential profile
8
MMbo
pv oil 9.4 MMbbl
6
4
2
0
0
2
4
6
8
10
12
14
years on production
9iWell Technology adds value by
Smart Wells Add Value
- Optimizing the Production Profile while Reducing
Intervention Costs. - Accelerating Production via Controlled
Commingling of Stacked Pay.
10Production Profile Optimization
8000
10
9
commingled profile
7000
8
6000
7
optimized profile
5000
6
oil rate bod
5
4000
sequential profile
4
3000
3
2000
2
1000
1
0
0
0
2
4
6
8
10
12
14
years on production
11Cumulative Production
7
commingled profile
pv oil 10.7 MMbb
l
6
5
4
sequential profile
MMbo
pv oil 9.4 MMbbl
3
2
optimized profile
pv oil 9.8 MMbbl
1
0
0
2
4
6
8
10
12
14
years on production
12iWell Technology adds value by
Smart Wells Add Value
- Reducing intervention or Deferment Costs.
- Accelerating Production via Controlled
Commingling of Stacked Pay. - Transferring Fluids Subsurface for Sweep or
Pressurization.
13Schematic cross section through block 11
reservoirs
14(No Transcript)
15iWell Technology adds value by
Smart Wells Add Value
- Reducing intervention or Deferment Costs.
- Accelerating Production via Controlled
Commingling of Stacked Pay. - Transferring Fluids Subsurface for Sweep or
Pressurization. - Assisting to Make Informed Decisions on Future
Infill Wells. - Improving Drive Processes.
- Intelligent production of Oil Rims.
16Potential benefits of intelligent completions
17Optimisation of ICV settings - scheme III
On/off valves only one cycle per tuning event
18iWell Technology adds value by
Smart Wells Add Value
- Reducing intervention or Deferment Costs.
- Accelerating Production via Controlled
Commingling of Stacked Pay. - Transferring Fluids Subsurface for Sweep or
Pressurization. - Assisting to Make Informed Decisions on Future
Infill Wells. - Improving Drive Processes
- Intelligent Production of Oil Rims
- Increasing Reserves per Wells Intelligent
Multilaterals.
19Increasing Reserves per Well
Smart Wells Add Value
- Examples
- North Sea Gannet D (Tay and Andrew)
- North Sea K7/FB (Block1 and Block4)
- Brunei Champion West (N and P zones)
20iWell Technology adds value by
Smart Wells Add Value
- Reducing Intervention or Deferment Costs.
- Accelerating Production via Controlled
Commingling of Stacked Pay. - Transferring Fluids Subsurface for Sweep or
Pressurization. - Assisting to Make Informed Decisions on Future
Infill Wells. - Improving Drive Processes.
- Intelligent production of Oil Rims.
- Increasing Reserves per Well (Intelligent
Multilaterals). - Accessing Reserves by Connecting Reservoirs.
- Intelligent Appraisals.
- Providing Options to Mitigate the Downside.
21Value of the Option to Change Operating Policies
1
0.75
Prob of Prof lt X
0.5
0.25
0
-100
-50
0
50
100
NPV, MM
22Commingled for One Year vs. Sequential
40000
Commingled
35000
perforate 710
end of commingling
30000
Sequential
25000
end of 803 (part 1)
Oil Rate, stb/d
20000
15000
803 (part 2)
end of 710
10000
plug 803
5000
0
2003
2004
2005
2006
2007
2008
2009
Time
23Where Have We Found Value?