Title: SksMinus status 04


1
SksMinusstatus04
  • HB meeting
  • 2008/5/09
  • ?????

2
Contents
  • Around target
  • Helium target
  • SDC2
  • Geant4

3
Around target
4
Plan
  • To design SDC12 frame
  • SDC2 repair and PreAmp position arrangement
  • SDC1 thickness 88 mm ? 70 mm
  • SP0 diet 10 layers? 7 layers (20 mm ?)

5
Helium target
6
Helium target status
  • Optimize
  • Target length 335 mm (very tight length)
  • Target shape Cylinder
  • ? Elliptic cylinder, material selection
  • Arm design HBJ frame
  • Test
  • Cooling test by refrigerator
  • Existent vacuum chamber with the same arm length

Hyperball-J (Frame outer size)
Designed by Ishimoto-san
335 mm
7
Points
  • Target shape Not cylinder is preferred.
  • Material Al or CFRP
  • As small background as possible
  • Thickness Enough thickness to pressure or thin
    surface with additional parts
  • Arm design No interference to HBJ frame

8
How to install
  • Target is installed from the upstream of
    Hyperball-J.

Refrigerator etc.
SDC1
Beam
BAC
SAC
9
Around target Ge detectors and frame
Interference to arm
218 mm
220 mm diameter cylinder can be installed.
Hyperball-J
10
W/ Beam line elements (FF600mm)
  • Enough space to install Helium target and other
    components

11
SDC2
12
Repair plan
  • Readout connector check and repair
  • Wire check To remove bad wire
  • HV connector repair
  • ?HV test ( LNS test with SP0)
  • Wiring
  • Rearrangement of connectors
  • ?Cosmic ray test and LNS test with SP0

13
SDC2 connectors
Gas connector
HV connector
To rearrange connectors more compact.
14
Geant4
15
Geant4 for new farm
  • Geant4 environments are build in new farm.
    (farm1,2,3,4,5,6)
  • Geant4.9.1 patch01
  • CLHEP 2.0.3.1 (2.0.3.2 My PC)
  • ROOT 5.18 (5.19 My PC)
  • Calculation speed
  • (K?m n events with EM and decay process, full
    material)
  • Old farm 600 s
  • New farm 400 s
  • My PC 300 s
  • (It depends on CPU clock ?)
  • K?p p0 events 10000 events/600 s (SP0 with
    full condition)

16
Comments
  • New farm has good HDD (or memory) speed.
  • Compile and read of the SKS magnetic felid map is
    very fast.
  • Runge-Kutta method speed difference (SKS
    tracking)
  • My PC 740 s
  • New farm 300 s
  • SKS analysis program may be faster ?
  • Geant4 visualization is too slow ! (???)
  • LAN speed ? PC performance ?

17
Summary
  • Priority
  • Design around target
  • Helium target
  • SDC2
  • Other simulation (SAC, SMF)
  • Magnetic field map of SksMinus