Title:
1HY-CAPACITY, INC.
HY-CAPACITY, INC.
2Welcome to Hy-Capacity
Company Highlights
- Founded in 1978 as a remanufacturer of
clutches, water pumps and torque amplifiers - Currently offer over 30,000 new and
remanufactured parts for agricultural equipment - Employ approximately 115 full-time and 10
part-time employees - Cab Interior plant in Dayton, Iowa with 6
full-time and 3 part-time employees - 23 Distributors that service over 10,000
dealers throughout the United States and Canada
3Welcome to Hy-Capacity
Team Driven Company
- Believing in employee empowerment and
continuous improvement -
Working through Teams to
- reduce cycle time
- reduce inventory
- reduce Work-in-Process (WIP)
- reduce costs
- improve quality
- increase productivity
- increase capacity
- increase sales
- increase profits
Here is Hy-Capacitys Concept of Lean and how it
works for us!
4Hy-Capacity - Team Driven
5HY-CAPACITY, INC.
HY-CAPACITY, INC.
6Stage 1 - Opportunity Identification
7Stage 2 - Solution Design
8Teamwork
- Team Selection
- Upstream Customer
- Downstream Customer
- Expert
- Maintenance
- Management
- Facilitator
9Lean Goals
- Increase productivity
- Reduce space
- Decrease inventory levels
- Improve quality
- Maintain on-time delivery performance
- Maintain load fulfillment performance
- Reduce overtime expenses
- Reduce manpower/part-time hours
10Lean Team Day 1
- Discuss each Team members role
- Discuss Team goal
- Establish Team rules
- Discuss current process
- Observe current process
Lean Teams meet Monday Friday 1015 1200 for
2 weeks
11Team Meetings
- Recap from Previous Day
- Current Meeting Notes
- Action Plan for Next Day
- Responsibilities
- Deadlines
12Brainstorm
13Brainstorm
14Product Flow Mapping
- Improve Product Flow
- Eliminate Product Travel
15Cardboard Model 1-Inch Scale
16Stage 3 - Implementation
17Paper Model 11 Scale
- Employees simulate job operation
- Adjustments are made here
- Team votes on final plan
18Implementation Plan
Project Project Team Start Finish Status
Stage 1 Stage 1 Stage 1
Teardown Tables Maintenance 01/12/06 01/25/06
Air dropped Air dropped Maintenance 01/12/06 01/25/06
Electrical dropped Electrical dropped Maintenance 01/12/06 01/25/06
Lighting Lighting Maintenance 01/12/06 01/25/06
Make Teardown Tables (or modify) with Racking, Tool boxes under table Make Teardown Tables (or modify) with Racking, Tool boxes under table Maintenance 01/12/06 01/25/06
Use old table components when possible Use old table components when possible Maintenance 01/12/06 01/25/06
Move Welder - cut hole in wall Move Welder - cut hole in wall Maintenance 01/12/06 01/25/06
Mount air cleaner Mount air cleaner Maintenance 01/12/06 01/25/06
Move welding curtains Move welding curtains Maintenance 01/12/06 01/25/06
Floor Mats - like Machine Shop Floor Mats - like Machine Shop Maintenance 01/12/06 01/25/06
Move HOT Table Move HOT Table Maintenance 01/12/06 01/25/06
Stage 1 COMPLETED BY Stage 1 COMPLETED BY Stage 1 COMPLETED BY
Stage 2 Stage 2 Stage 2
Remove Washer Maintenance 01/26/06 01/26/06
Take down part of track Take down part of track Maintenance 01/26/06 01/26/06
Move through Production room Move through Production room Maintenance 01/26/06 01/26/06
Blow pump out Blow pump out Maintenance 01/26/06 01/26/06
Take to Foth Building Take to Foth Building Jerry 01/26/06 01/26/06
Bring Greenie back from Livermore (will stay in Maint area until Viking is removed) Bring Greenie back from Livermore (will stay in Maint area until Viking is removed) Jerry 01/26/06 01/26/06
Stage 2 COMPLETED BY Stage 2 COMPLETED BY Stage 2 COMPLETED BY
- Broken into stages
- Team members assigned responsibilities
- Deadlines established
19Stage 4 - Performance Review
20Celebrate Success of Team
- Team T-Shirt
- Team Photo
- Team Lunch
21Continuous Improvement
22HY-CAPACITY, INC.
HY-CAPACITY, INC.
23Original Plant Layout
Machine Shop
UPS Loading Dock
Component Parts
Offices
TA
Hydraulic Pump
Core Room
Pressure Plate
Teardown
Boxing
Core Room
Disc
24Original Plant Layout
Machine Shop
UPS Loading Dock
Component Parts
Offices
TA
Hydraulic Pump
Core Room
Pressure Plate
Teardown
Boxing
Core Room
Disc
25Original Plant Layout
Machine Shop
UPS Loading Dock
Component Parts
Offices
TA
Hydraulic Pump
Core Room
Pressure Plate
Teardown
Boxing
Core Room
Disc
26Original Plant Layout
Machine Shop
UPS Loading Dock
Component Parts
Offices
TA
Hydraulic Pump
Core Room
Pressure Plate
Teardown
Boxing
Core Room
Disc
27Original Plant Layout
Machine Shop
UPS Loading Dock
Component Parts
Offices
TA
Hydraulic Pump
Core Room
Pressure Plate
Teardown
Boxing
Core Room
Disc
28Original Plant Layout Upstairs
UPS Loading Dock
Shipping Area
Core Room
Teardown
Boxing
Water Pump
Core Room
29Original Plant Layout Upstairs
UPS Loading Dock
Shipping Area
Core Room
Teardown
Boxing
Water Pump
Core Room
30Original Plant Layout Upstairs
UPS Loading Dock
Shipping Area
Core Room
Teardown
Boxing
Water Pump
Core Room
31HY-CAPACITY, INC.
HY-CAPACITY, INC.
32Core Lean Team
- ITS IMPOSSIBLE!!!
- CHANGE?!?!
- 525 Large Baskets
- 112 Small Baskets
- Mixed Unsorted Baskets
- Unidentified Baskets
- Basket Racks
- Transportation
- New Warehouse Layout
33Before Lean Team
34Before Lean Team
35Lean Team Results
36Lean Team Results
37Core Warehouse
38Meet the Team...
Cindy Danielson
Jerry Berte
Vouth Varangkounh
Daryl Rash
Greg Beekman
Molly Varangkounh
Karen Skoglund
Jeri Lane
39HY-CAPACITY, INC.
HY-CAPACITY, INC.
40Layout 1
41Layout 1
42Layout 1
Shipping
43(No Transcript)
44New Area Receiving/Maintenance
45Meet the Team...
Bob Krug
Jerry Berte
Cindy Danielson
Molly Varangkounh
Greg Beekman
Keith Edge
Karen Skoglund
46HY-CAPACITY, INC.
HY-CAPACITY, INC.
47Team Goal
- Move and Consolidate Humboldt Livermore Disc
Rooms
48Team Goal
- Incorporate Packaging Into Production Line
49Disc Lean Team
50Disc Lean Team Layout
51Disc Lean Team Results
52Meet the Team...
Kenny Bratland
Bob Krug
Jerry Berte
Karen Skoglund
Cindy Danielson
Molly Varangkounh
Dean Kellner
Greg Beekman
53HY-CAPACITY, INC.
HY-CAPACITY, INC.
54New Shipping Area
55Shipping Lean Team Layout
56Planning, Preparation, Organization
57"Movers Shakers"
- 37 Employees and Several Distributors Contributed
- Hours worked
- Friday 600pm 1000pm
- Saturday 700am 500pm
- Sunday 700am 500pm
- MONDAY NORMAL BUSINESS DAY
58Shipping Area Results
59Continuous Improvement
60Meet the Team...
Mike Grimm
Karen Skoglund
Bob Krug
Jay Gould
Cindy Danielson
Jerry Berte
Jeri Lane
Molly Varangkounh
61HY-CAPACITY, INC.
HY-CAPACITY, INC.
62Team Goal
- Move and consolidate Humboldt Livermore
pressure plate rooms - Design a layout that has the capacity to meet
customers demands
63PPA Lean Team Results
64Meet the Team...
Bob Krug
Keel Zinnel
Karen Skoglund
Jerry Berte
Kenny Bratland
Chad Vaudt
Molly Varangkounh
Scott Dahl
Cindy Danielson
65HY-CAPACITY, INC.
HY-CAPACITY, INC.
66Layout 2
TA
Offices
Machine Shop
Maintenance
Receiving
Hyd. Pump
Core Storage
R D / Catalog
PPA Components
Shipping / Finished Goods
Water Pump Prep
Shipping
Pressure Plate Assembly
Teardown
Water Pump
Disc Assembly
Disc Components
67Layout 2
TA
Offices
Machine Shop
Maintenance
Receiving
Hyd. Pump
Core Storage
R D / Catalog
PPA Components
Shipping / Finished Goods
Water Pump Prep
Shipping
Pressure Plate Assembly
Teardown
Water Pump
Disc Assembly
Disc Components
68Layout 2
TA
Offices
Machine Shop
Maintenance
Receiving
Hyd. Pump
Core Storage
R D / Catalog
PPA Components
Shipping / Finished Goods
Water Pump Prep
Shipping
Pressure Plate Assembly
Teardown
Water Pump
Disc Assembly
Disc Components
69Layout 2
TA
Offices
Machine Shop
Maintenance
Receiving
Hyd. Pump
Core Storage
R D / Catalog
PPA Components
Shipping / Finished Goods
Water Pump Prep
Shipping
Pressure Plate Assembly
Teardown
Water Pump
Disc Assembly
Disc Components
70Team Goal
- Redesign a layout to increase capacity to meet
our customers needs
71PPA Lean Team Results
72Continuous Improvement
73Meet the Team...
Chad Vaudt
Bob Krug
Jerry Berte
Molly Varangkounh
Cindy Danielson
Keel Zinnel
Reggie Kopecky
Karen Skoglund
Scott Dahl
74HY-CAPACITY, INC.
HY-CAPACITY, INC.
Phase 7 PPA Prep Component Parts
75Team Goal
- To develop an efficient prep line with point of
use storage
76Lean Team Results
77Meet the Team...
Bob Krug
Cindy Danielson
Karen Skoglund
Keel Zinnel
Kenny Bratland
Chad Vaudt
Scott Dahl
Jerry Berte
78HY-CAPACITY, INC.
HY-CAPACITY, INC.
79Team Goal
- Move Water Pump Downstairs to the Production Area
- Increase Efficiency
80Lean Team Results
81Continuous Improvement
82Meet the Team...
Jerry Berte
Greg Beekman
Cindy Danielson
Jay Gould
Bob Krug
Molly Varangkounh
Karen Skoglund
Steve Jarvis
83HY-CAPACITY, INC.
HY-CAPACITY, INC.
84Lean Team Results
85Meet the Team...
Greg Beekman
Steve Jarvis
Bob Krug
Cindy Danielson
86HY-CAPACITY, INC.
HY-CAPACITY, INC.
87Team Goal
- To increase efficiency and improve product flow
88Lean Team Results
89Meet the Team...
Dan Brownfield
Don Riley
Steve Lehman
90HY-CAPACITY, INC.
HY-CAPACITY, INC.
91Team Goal
- To increase efficiency and improve product flow
92Lean Team Results
93Meet the Team...
Bob Krug
Cindy Danielson
Steve Lehman
Chad Lange
94HY-CAPACITY, INC.
HY-CAPACITY, INC.
95Team Goal
- To increase efficiency and improve product flow
96Lean Team Results
97Meet the Team...
Bob McBurney
Keel Zinnel
Michael Bleich
Jeff McCullough
98HY-CAPACITY, INC.
HY-CAPACITY, INC.
99Team Goal
- To increase efficiency and improve product flow
100Lean Team Results
101Lean Team Results
102Meet the Team...
Greg Beekman
Jeremy Tinken
Karen Skoglund
Dustin Scott
Molly Varangkounh
Bob Krug
Cindy Danielson
Karen Rapple
103HY-CAPACITY, INC.
HY-CAPACITY, INC.
Phase 14 Teardown - Disc Waterpump IN
PROCESS
104Team Goal
- To increase efficiency and improve product flow
105Meet the Team...
Greg Beekman
Karen Skoglund
Cindy Danielson
Jeremy Tinken
Molly Varangkounh
Karen Rapple
106Current Layout
Completed Lean Process
In Process
TA
Offices
Machine Shop
Maintenance
Receiving
Hyd. Pump
Core Storage
R D / Catalog
PPA Components
Shipping / Finished Goods
Water Pump Prep
Shipping
Pressure Plate Assembly
Teardown
Water Pump
Disc Assembly
Disc Components
107Upcoming... Teardown - TA
108Upcoming... Machine Shop
Steve Lehman
Dustin Scott
Josh Miller
Steve Lanning
Todd Baker
109Upcoming... Receiving
Gary Flurer
Karen Olson
Karen Skoglund
Molly Hendrickson
110Upcoming... Warehouse 12
Jerry Berte
Terese Granahan
Aric Lange
Delmer Zinnel
Shane Tofteberg
111Upcoming... Accounting
Amy Rodenberg
Angie Sampson
Shelly Erpelding
Marianne Shepherd
Mary Bormann
Mindy Derrig
Jaclyn Olson
Carol Schiltz
112Upcoming... Inside Sales/Tech
Barb Wiuff
Jeff McCullough
Steph Bowden
Diane Flood
Craig Flood
Dan McKibban
Keel Zinnel
Lee Inman
Terri Edwards
Christy Larson
Cindy Danielson
Jeri Lane
Jeff Olson
Roberta Clark
113Upcoming... Purchasing
Kenny Bratland
Pam Anderson
114Upcoming... RD/Catalog
Mike Grimm
Jess Caryl
Tawny Pingel
Charlene Sandven
Scott Dahl
115Upcoming... Scheduling
Butch Sumner
116Upcoming... Cab Interior Division
Deb Hayes
Jeff Helvick
Tracey Anderson
Scott Danielson
Rob Hansen
Sherri Hansen
Sara Morford
117Continuous Improvement
118Lean Teamwork ---------------------- RESULTS
- Increased Productivity 75 - 100
- Reduced Space by 76 on average company wide
- Reduced Overtime costs by 96 since 2003
- Reduced Manpower/Part-time hours by 28.5 since
2003 - Reduced company wide inventory levels by 30
- Defects reduced to less than 1
- On-Time Delivery to customers is currently 99.8
- Load Fulfillment Performance is currently 99.8
119HY-CAPACITY, INC.
Lean is a journey, not a destination.