Title: TAIS PBL Program Presenation


1
Air Traffic Control Systems
Performance Based Logistics (PBL) Support for
the Tactical Airspace Integration System (TAIS)
UNCLASSIFIED
2
Air Traffic Control Systems
PM ATC - BACKGROUND TACTICAL AIRSPACE
INTEGRATION SYSTEM (TAIS) PBL PURSUIT
CHRONOLOGY PBL SUPPORT CONCEPT AND INDIVIDUAL
ARCHITECTURES GFE SUPPORT STRATEGY CFE
SUPPORT STRATEGY PBL INFORMATION MANAGEMENT
STRATEGY SUMMARY
3
PM Air Traffic Control (TLCSM)GOALS
ATNAVICS
TTCS
TAIS
MOTS
  • Goals of ATC System Readiness,
    Soldier-Focused Support, Reduction of Total
    Ownership Costs (RTOC)
  • Goal of LOG Capture Logistical Data on
    ATC Systems to Provide More Efficient Life Cycle
    Management

AN/FPN-66A
ASR-9
DASR
FBPAR
DVRS
VCSS
DAAS
AN/FPN-40
4
Tactical Airspace Integration System (TAIS) The
Armys System of Record for Airspace MgmtTwo
Versions/Variants Full TAIS and TAIS AWS

DIGITAL ABCS SYSTEM
Performs PROCEDURAL CONTROL
TAIS Mission
Full TAIS
Provide automated Airspace Command and Control
(AC2) and Air Traffic Services (ATS) to
warfighting commands and ATS companies. Provides
linkage to Joint airspace mgmt processes (Theater
Air Ground System TAGS)
  • ABCS and ATC system
  • ACAT-III
  • Post Milestone C
  • In full production
  • FCS Complementary Prgm
  • TBMCS Interface
  • Extension of AOC WS

AN/TSQ-221
Each AN/TSQ-221 Full TAIS Shelter Consists of
an Expanded Capacity M1113 HMMWV with Standard
Rigid-Wall Shelter Housing the Mission Equipment
Package one M1097 Cargo HMMWV a PU-801 15 Kw
Tactical Generator Antennas and a Standard
Integrated Command Post System (SICPS) Extension.
ABCS Army Battle Command System ATC Air Traffic
Control ACAT Acquisition Category FCS Future
Combat System TBMCS Theater Battle Management
Core System
2D/3D DISPLAY
TAIS Airspace Workstation (AWS)
BULLFROG Unix laptop
BAEs/ADAM Cells are equipped with TAIS AWS
The AN/FSQ-211 TAIS AWS Provides the Same
Software Functionality Resident in the AN/TSQ-221
Full TAIS for 3rd Dimension Situational
Awareness/Understanding, Visualization, and
Deconfliction of Airspace and Airspace Users.
The AWS is Designed for Commands and Operational
Facilities (OPFACs) Not Requiring the Full
Mission Equipment Package and Mobility of the
AN/TSQ-221 TAIS.
AN/FSQ-211
BAE Brigade Aviation Element ADAM Air Defense
Airspace Management
5
TAIS ComponentsFull TAIS is comprised of
INSIDE EACH RWS
EACH OF THE 4 WORKSTATIONS ARE CONFIGURED WITH
SOFTWARE
Solaris 8.0 DIICOE Segments TAIS SW RELEASE
9.2P5 Dynamic Airspace Management System (DAMS)
(3D Visualizer) Integrated C4I System Framework
(ICSF) (2D Visualizer)
2 SUN HCU SB25000 WORK STATIONS
AIR DEFENSE SYSTEMS INTEGRATOR (ADSI)
STANDARD RIGID WALL SHELTER (RWS)
2 REMOTABLE BULLFROG WORKSTATIONS
COMMUNICATIONS SUITE
SICPS SOFTWALL EXTENSIONS with BOOTWALLS
1 - AN/VRC-90D SINCGARS 1 - AN/VRC-92F SINCGARS
(2 R/Ts) 4 - AN/VRC-103s 1 - AN/ARC-220 1 -
TADIL A, HF (95-S) 1 - SATCOM, UHF (PSC-5) 2 -
UHF/VHF COMM (AN/PRC-117) 1 - EPLRS 1 - GPS 1 -
STE
COLOR PRINTER
15KW GENERATOR (PU-801)
EXPANDED CAPACITY HMMWV
6
TAIS Evolution
  • Migrating to Windows Vista FY2007-2009
  • Migrating to a Service Oriented Architecture
    FY2008-2011
  • First Step - Windows (Vista) laptop
  • Retain existing Interfaces
  • Improve Web ACMR to Google Earth-like User
    Interface
  • CPoF-like front end
  • Second Step
  • Migrate TAIS functions to Service Oriented
    Architecture
  • Continue to perform A2C2 and ATS Enroute services

7
PBL PURSUITCHRONOLOGY
8
TAIS PBL ChronologyKey Activities
  • DoD 5000.1 gt PM Total Life Cycle System
    Manager May 03
  • PM AS approval for PM ATC Pursuit of PBL Feb
    04
  • PM Aviation Systems Briefed Mr. W. Pybus
    (ASA/ALT-ILS) Feb 04
  • Core Depot Assessment (CDA) Completed Apr 04
  • Mr. Stephen Bagby (SES) Approved Cost
    Methodology Jun 04
  • AAE Approved BCA/PBL Oct 04
  • Commenced ALPHA Negotiations GDC4S May 05
  • TAIS PBL Contract Awarded 30 Jun 05

9
PBLREQUIREMENTS AND CONCEPT DEVELOPMENT
10
Performance Based Logistics (PBL)
  • DoDs preferred approach for implementing
    product support
  • Describe performance goals for a weapon systems
    readiness
  • Eliminate non-value-added steps in the supply
    chain
  • Full accountability for readiness on the PMs
  • Contract for weapon system sustainment from
    organic providers, Industry
  • and partnerships
  • Benefits of partnering include leveraging
    efficient public facilities, maintaining
  • DoDs core capability and encouraging
    Industrial investments and technology
  • infusion

Develop Written Agreement To Implement Strategy
and Monitor Performance
Key Components of Product Support
Strategy Documented in Acquisition Strategy
11
Logistics Management ConceptCommon DoD 5000
Model
PBL LIFE CYCLE MANAGEMENT!
User Needs Technology Opportunities
A
C
B
Concept Refinement
Technology Development
Production Deployment
System Development Demonstration
Operations Support
Concept Refinement Decision
Critical Design Review
FRP Decision Review
Pre-Systems Acquisition
Systems Acquisition
Sustainment
ICD
CPD
CDD
Support Strategy
Concept is to leverage administrative and
technological Best Business Practices from the
TAIS PBL program. Migrate those concepts and
practices to other ATC systems
Capture Data
12
PBL SUPPORT CONCEPT AND INDIVIDUAL ARCHITECTURES
(Government / Contractor)
13
PBL ContractObjectives
  • Support Strategy Developed from Other Successful
    CLS / PBL Programs
  • Complete PBL Strategy Feasibility Study
  • Sole Source, Incentivized Cost Plus contract to
    General Dynamics C4S (OEM) Huntsville, Alabama
  • PM ATC - Product Support Integrator (PSI ATC
    Logistics Branch)
  • PSI has Complete POM / Funding Responsibility for
    TAIS
  • Establish MOAs and Interface with Other Support
    Providers (LOGSA, DAASC, and Other PMs
    In Progress)
  • PBL Status Reports to AMC, ASA/ALT-ILS and AAE
  • Evolve and Optimize the PBL Support Strategy

OEM / Product Support Provider
14
TAIS PBL Performance Metrics
  • There are two metrics used to calculate the
    earned fee
  • Fleet Operational Readiness RateGoal of PBL is
    to maintain an OR rate that is / gt 90 Both
    the TAIS Shelters and AWS are included in Fleet
    Readiness calculations(Fee loss beginning at OR
    rates below 90)
  • Customer Wait Time (CWT)Measured from the time a
    requisition is placed in the STAMIS system, to
    the time the requested item is first attempted to
    be delivered to the distribution POC(Fee loss
    beginning at 3 calendar days)
  • Total Incentive Fee
  • The Government will sum the incentive fee earned
    for FMC Fleet
  • Operational Readiness and the incentive fee
    earned for Customer Wait Time
  • to calculate the total earned fee.

15
PSI (PM ATC)Organization
PM ATC (PSI)
LOG BRANCH CHIEF
Asst Product Manager, TAIS
  • Direct Control
  • Coordination

Readiness Analyst
PBL Project Officer
TAIS ILS Manager
PBL Programmatics
PBL Budget Analyst
  • Maintenance Operations
  • Readiness Reporting / Evaluations
  • Interface with Contractor, PMs, CECOM, LOGSA,
    TYAD and Units
  • Contract Award
  • Contract Administration
  • Contractor Interface
  • Cost Tracking
  • Cost Analysis
  • Interface with Contractor Cost Personnel
  • Depot Operations
  • Supply Operations
  • Shipping / Tracking
  • PBL Planning, Implementation
  • PBL Processes
  • Interface with Contractor, PMs, CECOM, LOGSA,
    TYAD and Units
  • CDAs / BCAs

16
PBL SupportWire Diagram
PSI Manager
SYSTEMS MGMT GFE MANAGEMENT
CECOM
General Dynamics C4S
PRIME CONTRACTOR
PM/ OTHER SERVICES
PM WHEEL VEHICLES
PM PWR GEN
PM TRACS
DEPOT OPERATIONS HSV
SUB CONTRACTORS
VENDORS
PBL Strategy - PM ATC PSI PM ATC Full Time PSI
Manager Performance Based Contract with
GDC4S Expanded Scope for Warfighter Support GDC4S
Responsible for CFE - Full Time FSRs
w/Spares - Korea / Germany Support - Other
OCONUS / OIF/ OEF Support Result
Improved Support to Warfighter!
GD (PM-CHS)
KOREA
GERMANY
OTHER OCONUS
17
Support Concept (Skeleton)
18
General Dynamics C4S (PSP)Organization /
Operations
GDC4S LOGISTICS MANAGEMENT DATABASE
19
GFE SupportStrategy
20
GFE Support
Standard Support - GFE
USERS
Direct Support Channel (PM ATC PSI)
ALPSl
ULLS A/G
Future Capability
Other PMs PM C3T PM Generators PM CHS CECOM
Unit Performs Preventative Maintenance Checks and
Services
DA Form 2404 PMCS
AWS Via PM ATC Web Portal
Unit Submits a Work Order Request and Entered
into STAMIS System
Established Army Support Channel
DA Form 2407 MWO
Indirect Information Channel (PM ATC PSI)
STAMIS Data LIW / RIDB Access Systems
Unit Reports TAIS System Status into the Army
System AWS Status Reported Offline
DA Form 2406 USR
LOGSA
ARMY SUPPLY SYSTEM
DAASC
End Item / GFE Support
21
CFE Support Strategy
22
STAMIS Interface
WHOLESALE SUPPLY SYSTEM
DAASC
PM ATC PSI Oversight
PSP
RIC DODAAC
ALPSl
Prime Contractor
Monthly Parts Catalog Submission
LOGSA R / LIDB
GFE CFE ??
TAIS USER
23
CFE Parts Catalog
Maintenance Information Message
INITIAL CONCEPT PM STRYKER
  • TAIS PBL parts catalog is derived from the
    General Dynamics parts list for easy correlation.

24
Support Channel - CFE
ATS UNIT/ TAIS User
Demand Generated
CONUS and OCONUS Support
Call Center Notified
FSR
Prime Contractor
Orders Screened
Non Stocked Items
Stocked Items
WAREHOUSE
VENDORS
  • 24/7 Call Center
  • Systematic
  • Logistics
  • Analyses
  • Transportation
  • Best Practices
  • Dedicated PSP
  • Oversight

VENDOR STOCK
COTS
PSP Tool
Material Preparation Shipping Receiving
WAREHOUSE
Quality Inspection/ Material Tracking
TRANSPORTATION (Enroute Support Transportation
System)
Fastest Most Economical Means
Incorporates Best Government And Industry
Practices
GOVERNMENT TRANSPORTATION
COMMERCIAL TRANSPORTATION
DEFENSE TRANSPORTATION
ATS UNIT
Demand Satisfied
25
TAIS Today Includes the Underpinnings for
Conditioned Based Maintenance
  • The uptime counter provides PM ATC with the
    following capabilities
  • Enhanced prognostic and diagnostic
  • techniques
  • Failure trend analysis
  • More accurate forecasting for
  • maintenance training
  • Validate maintenance procedures
  • and changes

The Uptime Counter is the first step toward
developing an Electronic Logbook for the TAIS
system. An electronic logbook, as seen with
aircraft programs, will provide commanders in the
field with this logistical data allowing them to
make more timely operational and maintenance
decisions.
TAIS UPTIME COUNTER Recording power applied to
system
26
PBL INFORMATION MANAGEMENT STRATEGY
27
Common Model for Information Management
PM ATC TLCSM
Application GFP Controlled Access
Future Capability
Automated Logistics Performance Scorecard (Future)
ALPS
INTERNET ACCESS
Server
DMS
OPEN PM ATC Access
ATC System Reports
STAMIS
LOGSA (Future)
TAIS ATNAVICS FBPAR TTCS MOTS Fixed Base
ILS MGR Other Support Staff
ATC Common
OPEN PM ATC Access
28
Share Point Product /Document Management Server
(DMS)
29
LOGSA Information Systems Supporting Deployment,
Sustainment and Redeployment
30
TAIS PBL Support Architecture
Support Channel - CFE
Support Channel - GFE
TAIS USERS
CONUS, OCONUS
Prime Contractor
STAMIS System
CFE Reports
597TH MAINT COMPANY
DA Form 2404 DA Form 2407 DA Form 2406
Contractor CFE / FSR Support
Future Capability
End Item / GFE Support
KMS
LMD
DAASC
Product Support Integrator / TLCSM
GOAL /gt 90 OR
Contractor Depot Support
ARMY SUPPLY SYSTEM
PSP Data
R / LIDB
ALPS
PBL Requirement to Measure Life Cycle Performance
PM ATC Conducts Logistical Analyses
31
Integrated PBL Information Management System
Portal View
Contracts / Finance
ILS Manager
Readiness Analyst
PBL SME
Management Reports Readiness Supply Maintenance Di
stribution Financial Requisitions GFE Status
AWS Off Line
CFE / GFE Composite
Server
ATSCOM Support with Reporting
ALPS
LOGSA R/LIDB
GFE / 2406 / 2407
Govt Firewall
Weekly File Transfer
STAMIS
Contractor Firewall
Spares Management
Management Reports Readiness Supply Maintenance Di
stribution Financial Requisitions Support Metrics
Server
FSR Support
Cost Information
Engineering
Configuration Management
PSP DBMS
PSP Support Staff
Contract Information
CFE / Production GFE
Materials
Depot Maintenance
32
ALPS Concept
ALPS
Graphical User Interface Dashboard
Individual SMART-T DBMSs By System
TAIS DBMS
ATNAVICS DBMS
FBPAR DBMS
TTCS DBMS
MOTS DBMS
33
Automated Logistics PerformanceScorecard (ALPS)
- Dashboard
Color Cubes denote a specific parameter has been
crossed User can click on the cube to drill down
to the issue
EVOLVED FROM PM STRYKER CONCEPT AND SMART
T DEVELOPED BY PM WIN-T
Each picture is hyperlinked to the systems main
database screen for general information
34
ALPS System Main Screen
This capability is already built formerly SMART-T
35
ALPS Capabilities (Initial / Future)
Capture Stakeholder and End User Information
System Configuration Information
(HW/SW/Vendor) Field Support Information
(Field Failure Data/Metrics) Depot Support
Information (Metrics) Supply Support
Information (Metrics) Provide Warranty
Information (CHS) Differentiate Between CFE
and GFE AC and NGB Provide Automated Response
Notifications Provide Ad Hoc Capability for
What If Analyses Provide Tailored and
Standardized Reports Graphically Display
Information Dashboard- Interface with Other
DBMSs (STAMIS/Other)- Capture Pre/Post
Acquisition Data - NMIB Information-
NET/Training Information- Correlate to Archived
Documents (DMS) Capability Currently Exists
36
TAIS PBL Experience To Date
37
THE GOODNESS OF TAIS PBL
BACKGROUND
  • Department of the Army Preferred Product Support
    Strategy
  • PM ATC currently has the first AAE approved
    Performance Based Logistics (PBL) contract in
    place.
  • Initial contract Awarded 30 June 05
  • PBL strategy has proven successful supporting
    deployed and non-deployed systems
  • CURRENTLY
  • gt 90 OR DA Rate
  • gt 99 OR Rate for Contractor Furnished Equipment
    (PBL)
  • Support contractor (General Dynamics C4 Systems)
    is currently able to field trouble calls 24 hours
    a day
  • Modularity increases complexity and top level
    visibility of TAIS PBL is needed

GDC4S (PSP) Depot
PERFORMANCE EXCELLENCE
  • Product Support Provider (PSP), GDC4S,
    established world-class help desk
    SOLDIER-FOCUSED
  • 100 Warfighter satisfaction
  • Robust Logistics Management Database (LMD-GOVT
    access) provides increased forecasting/troubleshoo
    ting capabilities
  • Reduction in total ownership costs documented
  • MOS 94D enhanced training initiative increasing
    soldiers on the battlefield and reducing
    contractor support needs

GDC4S PBL Help Desk
38
TAIS PBLSuccess Stories
REPAIR OF TAIS SHELTER T400 (25ID) DAMAGED IN
SHIPMENT TO OIF
REPAIR OF T1 CARDS
  • D/1-58 (Ft Stewart) reported trouble with an
    AccessNet communications system
  • Field Engineer identified the problem as bad
    power supplies
  • Visual inspection by the Depot Engineer revealed
    that the internal reset switch was rusted and
    corroded
  • Depot replaced the reset switch at .50 rather
    than the full T1 card at 800.00 x 4 T1 cards
  • Shaved 6 months off total repair time
  • Conducted repairs on site in theater

Total Savings of 2,398.00 Repair complete in lt36
hours
Total Cost Savings of 15,125.00
VOICE RECORDER TAPE DRIVE END OF LIFE SPARES
PURCHASE
AIR DEFENSE SYSTEM INTEGRATOR (ADSI) HARD DRIVE
SPARES PURCHASE
  • Voice Recorder Tape Drive
  • NICE 900.00 (each)
  • New Contract 500.00 (each)
  • Cost Savings 400.00
  • (x2 tape drives per shelter)
  • Total Life Cycle Cost Savings
  • Requirement to purchase ADSI hard drives (15)
  • Received quote from OEM 1239.00 ea
  • Qualified vendor quote 241.65 ea
  • Savings per ADSI 997.35

Total Cost Savings of 800.00 per shelter
Total Cost Savings of 14,960.25
39
Summary
  • CRITICAL MILESTONE TAIS PBL Contract Awarded 30
    June 05
  • Next Contract Award 1 Jan 08
  • A DOD / HQDA SANCTIONED SUPPORT CONCEPT
  • TAIS PBL PROGRAM OVER TWO YEARS IN DEVELOPMENT
    AND COORDINATION WITH ASA/ALT-ILS
  • HQDA PBL POLICIES AND REGULATIONS EVOLVING
  • TAIS STRATEGY IS FLEXIBLE AND CONSTANTLY EVOLVING
  • CRITICAL SUCCESS FACTORS LEADERSHIP TEAMWORK
  • OPERATIONAL READINESS STABILIZED gt 99 FOR CFE
    (PBL)
  • 100 CUSTOMER / WARFIGHTER SATISFACTION
  • PROVEN REDUCTIONS IN TOTAL COST OF OWNERSHIP
  • PLENTY OF CHALLENGES AHEAD!
  • FOR THE FIRST TIME IN ATC HISTORY,
    WE
    HAVE AN OPPORTUNITY TO ACTUALLY IMPROVE SUPPORT
    TO OUR SOLDIERS AND THEIR EQUIPMENT

40
Backup Information
41
Aviation Missile Life-Cycle Management
Initiative Poised for the Future
MG James H. Pillsbury Commanding General, AMCOM
ASMD AUSA Conference Panel 2 Emerging
Integrated Air Missile Defense Capabilities
Future Force 08 December 2004
42
SFL Objectives
  • Enhance Synergy of Acquisition, Logistics, and
    Technology Communities
  • Enable Closer Relationship Between Army Materiel
    Command (AMC) Major Subordinate Commands (MSCs)
    and Program Executive Officers (PEOs)
  • Enhance Input Into Acquisition Process to
    Influence Future Sustainment and Readiness

LOG
Project Office
BUS Mgmt
Sustainment Logistics
Tech
PM
ENGR
FMS
ACQ
Major Items
Spares
43
Soldier Focused Life-Cycle Management (SFL)
A Team Redstone Initiative
  • Supply Support (CL V, VII, IX)
  • Program Management
  • Maintenance Management
  • System Development
  • Technical Publications
  • System Acquisition
  • Provisioning
  • Testing
  • Depot Maintenance
  • New Equipment
  • Training
  • Packaging
  • Transportation
  • Materiel Fielding
  • War Reserves
  • Engineering
  • Mobilization Planning
  • Configuration
  • management
  • Logistics Assistance
  • Readiness
  • System Engineering
  • Air Worthiness
  • Quality
  • Industrial Base
  • Planning
  • Technical Data
  • Management
  • Case Development
  • Case Execution
  • COLLOCATED FUNCTIONS
  • NON-COLLOCATED FUNCTIONS
  • Acquisition Planning
  • Contracting
  • Contracting Management

44
Balance Between Process and Product
  • Achieve Balance Between Processes and Products in
    Each SFL Team
  • Tailor SFL Teams to the Needs of Each Weapon
    System
  • Assess SFL Team Composition Regularly