Title: TAIS PBL Program Presenation
1Air Traffic Control Systems
Performance Based Logistics (PBL) Support for
the Tactical Airspace Integration System (TAIS)
UNCLASSIFIED
2Air Traffic Control Systems
PM ATC - BACKGROUND TACTICAL AIRSPACE
INTEGRATION SYSTEM (TAIS) PBL PURSUIT
CHRONOLOGY PBL SUPPORT CONCEPT AND INDIVIDUAL
ARCHITECTURES GFE SUPPORT STRATEGY CFE
SUPPORT STRATEGY PBL INFORMATION MANAGEMENT
STRATEGY SUMMARY
3PM Air Traffic Control (TLCSM)GOALS
ATNAVICS
TTCS
TAIS
MOTS
-
- Goals of ATC System Readiness,
Soldier-Focused Support, Reduction of Total
Ownership Costs (RTOC) - Goal of LOG Capture Logistical Data on
ATC Systems to Provide More Efficient Life Cycle
Management
AN/FPN-66A
ASR-9
DASR
FBPAR
DVRS
VCSS
DAAS
AN/FPN-40
4Tactical Airspace Integration System (TAIS) The
Armys System of Record for Airspace MgmtTwo
Versions/Variants Full TAIS and TAIS AWS
DIGITAL ABCS SYSTEM
Performs PROCEDURAL CONTROL
TAIS Mission
Full TAIS
Provide automated Airspace Command and Control
(AC2) and Air Traffic Services (ATS) to
warfighting commands and ATS companies. Provides
linkage to Joint airspace mgmt processes (Theater
Air Ground System TAGS)
- ABCS and ATC system
- ACAT-III
- Post Milestone C
- In full production
- FCS Complementary Prgm
- TBMCS Interface
- Extension of AOC WS
AN/TSQ-221
Each AN/TSQ-221 Full TAIS Shelter Consists of
an Expanded Capacity M1113 HMMWV with Standard
Rigid-Wall Shelter Housing the Mission Equipment
Package one M1097 Cargo HMMWV a PU-801 15 Kw
Tactical Generator Antennas and a Standard
Integrated Command Post System (SICPS) Extension.
ABCS Army Battle Command System ATC Air Traffic
Control ACAT Acquisition Category FCS Future
Combat System TBMCS Theater Battle Management
Core System
2D/3D DISPLAY
TAIS Airspace Workstation (AWS)
BULLFROG Unix laptop
BAEs/ADAM Cells are equipped with TAIS AWS
The AN/FSQ-211 TAIS AWS Provides the Same
Software Functionality Resident in the AN/TSQ-221
Full TAIS for 3rd Dimension Situational
Awareness/Understanding, Visualization, and
Deconfliction of Airspace and Airspace Users.
The AWS is Designed for Commands and Operational
Facilities (OPFACs) Not Requiring the Full
Mission Equipment Package and Mobility of the
AN/TSQ-221 TAIS.
AN/FSQ-211
BAE Brigade Aviation Element ADAM Air Defense
Airspace Management
5TAIS ComponentsFull TAIS is comprised of
INSIDE EACH RWS
EACH OF THE 4 WORKSTATIONS ARE CONFIGURED WITH
SOFTWARE
Solaris 8.0 DIICOE Segments TAIS SW RELEASE
9.2P5 Dynamic Airspace Management System (DAMS)
(3D Visualizer) Integrated C4I System Framework
(ICSF) (2D Visualizer)
2 SUN HCU SB25000 WORK STATIONS
AIR DEFENSE SYSTEMS INTEGRATOR (ADSI)
STANDARD RIGID WALL SHELTER (RWS)
2 REMOTABLE BULLFROG WORKSTATIONS
COMMUNICATIONS SUITE
SICPS SOFTWALL EXTENSIONS with BOOTWALLS
1 - AN/VRC-90D SINCGARS 1 - AN/VRC-92F SINCGARS
(2 R/Ts) 4 - AN/VRC-103s 1 - AN/ARC-220 1 -
TADIL A, HF (95-S) 1 - SATCOM, UHF (PSC-5) 2 -
UHF/VHF COMM (AN/PRC-117) 1 - EPLRS 1 - GPS 1 -
STE
COLOR PRINTER
15KW GENERATOR (PU-801)
EXPANDED CAPACITY HMMWV
6TAIS Evolution
- Migrating to Windows Vista FY2007-2009
- Migrating to a Service Oriented Architecture
FY2008-2011
- First Step - Windows (Vista) laptop
- Retain existing Interfaces
- Improve Web ACMR to Google Earth-like User
Interface - CPoF-like front end
- Second Step
- Migrate TAIS functions to Service Oriented
Architecture - Continue to perform A2C2 and ATS Enroute services
7PBL PURSUITCHRONOLOGY
8TAIS PBL ChronologyKey Activities
- DoD 5000.1 gt PM Total Life Cycle System
Manager May 03 - PM AS approval for PM ATC Pursuit of PBL Feb
04 - PM Aviation Systems Briefed Mr. W. Pybus
(ASA/ALT-ILS) Feb 04 - Core Depot Assessment (CDA) Completed Apr 04
- Mr. Stephen Bagby (SES) Approved Cost
Methodology Jun 04 - AAE Approved BCA/PBL Oct 04
- Commenced ALPHA Negotiations GDC4S May 05
- TAIS PBL Contract Awarded 30 Jun 05
9PBLREQUIREMENTS AND CONCEPT DEVELOPMENT
10Performance Based Logistics (PBL)
- DoDs preferred approach for implementing
product support - Describe performance goals for a weapon systems
readiness - Eliminate non-value-added steps in the supply
chain - Full accountability for readiness on the PMs
- Contract for weapon system sustainment from
organic providers, Industry - and partnerships
- Benefits of partnering include leveraging
efficient public facilities, maintaining - DoDs core capability and encouraging
Industrial investments and technology - infusion
Develop Written Agreement To Implement Strategy
and Monitor Performance
Key Components of Product Support
Strategy Documented in Acquisition Strategy
11Logistics Management ConceptCommon DoD 5000
Model
PBL LIFE CYCLE MANAGEMENT!
User Needs Technology Opportunities
A
C
B
Concept Refinement
Technology Development
Production Deployment
System Development Demonstration
Operations Support
Concept Refinement Decision
Critical Design Review
FRP Decision Review
Pre-Systems Acquisition
Systems Acquisition
Sustainment
ICD
CPD
CDD
Support Strategy
Concept is to leverage administrative and
technological Best Business Practices from the
TAIS PBL program. Migrate those concepts and
practices to other ATC systems
Capture Data
12PBL SUPPORT CONCEPT AND INDIVIDUAL ARCHITECTURES
(Government / Contractor)
13PBL ContractObjectives
- Support Strategy Developed from Other Successful
CLS / PBL Programs - Complete PBL Strategy Feasibility Study
- Sole Source, Incentivized Cost Plus contract to
General Dynamics C4S (OEM) Huntsville, Alabama - PM ATC - Product Support Integrator (PSI ATC
Logistics Branch) - PSI has Complete POM / Funding Responsibility for
TAIS - Establish MOAs and Interface with Other Support
Providers (LOGSA, DAASC, and Other PMs
In Progress) - PBL Status Reports to AMC, ASA/ALT-ILS and AAE
- Evolve and Optimize the PBL Support Strategy
OEM / Product Support Provider
14TAIS PBL Performance Metrics
- There are two metrics used to calculate the
earned fee - Fleet Operational Readiness RateGoal of PBL is
to maintain an OR rate that is / gt 90 Both
the TAIS Shelters and AWS are included in Fleet
Readiness calculations(Fee loss beginning at OR
rates below 90) - Customer Wait Time (CWT)Measured from the time a
requisition is placed in the STAMIS system, to
the time the requested item is first attempted to
be delivered to the distribution POC(Fee loss
beginning at 3 calendar days) - Total Incentive Fee
- The Government will sum the incentive fee earned
for FMC Fleet - Operational Readiness and the incentive fee
earned for Customer Wait Time - to calculate the total earned fee.
15PSI (PM ATC)Organization
PM ATC (PSI)
LOG BRANCH CHIEF
Asst Product Manager, TAIS
Readiness Analyst
PBL Project Officer
TAIS ILS Manager
PBL Programmatics
PBL Budget Analyst
- Maintenance Operations
- Readiness Reporting / Evaluations
- Interface with Contractor, PMs, CECOM, LOGSA,
TYAD and Units
- Contract Award
- Contract Administration
- Contractor Interface
- Cost Tracking
- Cost Analysis
- Interface with Contractor Cost Personnel
- Depot Operations
- Supply Operations
- Shipping / Tracking
- PBL Planning, Implementation
- PBL Processes
- Interface with Contractor, PMs, CECOM, LOGSA,
TYAD and Units - CDAs / BCAs
16PBL SupportWire Diagram
PSI Manager
SYSTEMS MGMT GFE MANAGEMENT
CECOM
General Dynamics C4S
PRIME CONTRACTOR
PM/ OTHER SERVICES
PM WHEEL VEHICLES
PM PWR GEN
PM TRACS
DEPOT OPERATIONS HSV
SUB CONTRACTORS
VENDORS
PBL Strategy - PM ATC PSI PM ATC Full Time PSI
Manager Performance Based Contract with
GDC4S Expanded Scope for Warfighter Support GDC4S
Responsible for CFE - Full Time FSRs
w/Spares - Korea / Germany Support - Other
OCONUS / OIF/ OEF Support Result
Improved Support to Warfighter!
GD (PM-CHS)
KOREA
GERMANY
OTHER OCONUS
17Support Concept (Skeleton)
18General Dynamics C4S (PSP)Organization /
Operations
GDC4S LOGISTICS MANAGEMENT DATABASE
19GFE SupportStrategy
20GFE Support
Standard Support - GFE
USERS
Direct Support Channel (PM ATC PSI)
ALPSl
ULLS A/G
Future Capability
Other PMs PM C3T PM Generators PM CHS CECOM
Unit Performs Preventative Maintenance Checks and
Services
DA Form 2404 PMCS
AWS Via PM ATC Web Portal
Unit Submits a Work Order Request and Entered
into STAMIS System
Established Army Support Channel
DA Form 2407 MWO
Indirect Information Channel (PM ATC PSI)
STAMIS Data LIW / RIDB Access Systems
Unit Reports TAIS System Status into the Army
System AWS Status Reported Offline
DA Form 2406 USR
LOGSA
ARMY SUPPLY SYSTEM
DAASC
End Item / GFE Support
21CFE Support Strategy
22STAMIS Interface
WHOLESALE SUPPLY SYSTEM
DAASC
PM ATC PSI Oversight
PSP
RIC DODAAC
ALPSl
Prime Contractor
Monthly Parts Catalog Submission
LOGSA R / LIDB
GFE CFE ??
TAIS USER
23CFE Parts Catalog
Maintenance Information Message
INITIAL CONCEPT PM STRYKER
- TAIS PBL parts catalog is derived from the
General Dynamics parts list for easy correlation.
24Support Channel - CFE
ATS UNIT/ TAIS User
Demand Generated
CONUS and OCONUS Support
Call Center Notified
FSR
Prime Contractor
Orders Screened
Non Stocked Items
Stocked Items
WAREHOUSE
VENDORS
- 24/7 Call Center
- Systematic
- Logistics
- Analyses
- Transportation
- Best Practices
- Dedicated PSP
- Oversight
VENDOR STOCK
COTS
PSP Tool
Material Preparation Shipping Receiving
WAREHOUSE
Quality Inspection/ Material Tracking
TRANSPORTATION (Enroute Support Transportation
System)
Fastest Most Economical Means
Incorporates Best Government And Industry
Practices
GOVERNMENT TRANSPORTATION
COMMERCIAL TRANSPORTATION
DEFENSE TRANSPORTATION
ATS UNIT
Demand Satisfied
25TAIS Today Includes the Underpinnings for
Conditioned Based Maintenance
- The uptime counter provides PM ATC with the
following capabilities - Enhanced prognostic and diagnostic
- techniques
- Failure trend analysis
- More accurate forecasting for
- maintenance training
- Validate maintenance procedures
- and changes
The Uptime Counter is the first step toward
developing an Electronic Logbook for the TAIS
system. An electronic logbook, as seen with
aircraft programs, will provide commanders in the
field with this logistical data allowing them to
make more timely operational and maintenance
decisions.
TAIS UPTIME COUNTER Recording power applied to
system
26PBL INFORMATION MANAGEMENT STRATEGY
27Common Model for Information Management
PM ATC TLCSM
Application GFP Controlled Access
Future Capability
Automated Logistics Performance Scorecard (Future)
ALPS
INTERNET ACCESS
Server
DMS
OPEN PM ATC Access
ATC System Reports
STAMIS
LOGSA (Future)
TAIS ATNAVICS FBPAR TTCS MOTS Fixed Base
ILS MGR Other Support Staff
ATC Common
OPEN PM ATC Access
28Share Point Product /Document Management Server
(DMS)
29LOGSA Information Systems Supporting Deployment,
Sustainment and Redeployment
30TAIS PBL Support Architecture
Support Channel - CFE
Support Channel - GFE
TAIS USERS
CONUS, OCONUS
Prime Contractor
STAMIS System
CFE Reports
597TH MAINT COMPANY
DA Form 2404 DA Form 2407 DA Form 2406
Contractor CFE / FSR Support
Future Capability
End Item / GFE Support
KMS
LMD
DAASC
Product Support Integrator / TLCSM
GOAL /gt 90 OR
Contractor Depot Support
ARMY SUPPLY SYSTEM
PSP Data
R / LIDB
ALPS
PBL Requirement to Measure Life Cycle Performance
PM ATC Conducts Logistical Analyses
31Integrated PBL Information Management System
Portal View
Contracts / Finance
ILS Manager
Readiness Analyst
PBL SME
Management Reports Readiness Supply Maintenance Di
stribution Financial Requisitions GFE Status
AWS Off Line
CFE / GFE Composite
Server
ATSCOM Support with Reporting
ALPS
LOGSA R/LIDB
GFE / 2406 / 2407
Govt Firewall
Weekly File Transfer
STAMIS
Contractor Firewall
Spares Management
Management Reports Readiness Supply Maintenance Di
stribution Financial Requisitions Support Metrics
Server
FSR Support
Cost Information
Engineering
Configuration Management
PSP DBMS
PSP Support Staff
Contract Information
CFE / Production GFE
Materials
Depot Maintenance
32ALPS Concept
ALPS
Graphical User Interface Dashboard
Individual SMART-T DBMSs By System
TAIS DBMS
ATNAVICS DBMS
FBPAR DBMS
TTCS DBMS
MOTS DBMS
33Automated Logistics PerformanceScorecard (ALPS)
- Dashboard
Color Cubes denote a specific parameter has been
crossed User can click on the cube to drill down
to the issue
EVOLVED FROM PM STRYKER CONCEPT AND SMART
T DEVELOPED BY PM WIN-T
Each picture is hyperlinked to the systems main
database screen for general information
34ALPS System Main Screen
This capability is already built formerly SMART-T
35ALPS Capabilities (Initial / Future)
Capture Stakeholder and End User Information
System Configuration Information
(HW/SW/Vendor) Field Support Information
(Field Failure Data/Metrics) Depot Support
Information (Metrics) Supply Support
Information (Metrics) Provide Warranty
Information (CHS) Differentiate Between CFE
and GFE AC and NGB Provide Automated Response
Notifications Provide Ad Hoc Capability for
What If Analyses Provide Tailored and
Standardized Reports Graphically Display
Information Dashboard- Interface with Other
DBMSs (STAMIS/Other)- Capture Pre/Post
Acquisition Data - NMIB Information-
NET/Training Information- Correlate to Archived
Documents (DMS) Capability Currently Exists
36TAIS PBL Experience To Date
37THE GOODNESS OF TAIS PBL
BACKGROUND
- Department of the Army Preferred Product Support
Strategy - PM ATC currently has the first AAE approved
Performance Based Logistics (PBL) contract in
place. - Initial contract Awarded 30 June 05
- PBL strategy has proven successful supporting
deployed and non-deployed systems - CURRENTLY
- gt 90 OR DA Rate
- gt 99 OR Rate for Contractor Furnished Equipment
(PBL) - Support contractor (General Dynamics C4 Systems)
is currently able to field trouble calls 24 hours
a day - Modularity increases complexity and top level
visibility of TAIS PBL is needed
GDC4S (PSP) Depot
PERFORMANCE EXCELLENCE
- Product Support Provider (PSP), GDC4S,
established world-class help desk
SOLDIER-FOCUSED - 100 Warfighter satisfaction
- Robust Logistics Management Database (LMD-GOVT
access) provides increased forecasting/troubleshoo
ting capabilities - Reduction in total ownership costs documented
- MOS 94D enhanced training initiative increasing
soldiers on the battlefield and reducing
contractor support needs
GDC4S PBL Help Desk
38TAIS PBLSuccess Stories
REPAIR OF TAIS SHELTER T400 (25ID) DAMAGED IN
SHIPMENT TO OIF
REPAIR OF T1 CARDS
- D/1-58 (Ft Stewart) reported trouble with an
AccessNet communications system - Field Engineer identified the problem as bad
power supplies - Visual inspection by the Depot Engineer revealed
that the internal reset switch was rusted and
corroded - Depot replaced the reset switch at .50 rather
than the full T1 card at 800.00 x 4 T1 cards
- Shaved 6 months off total repair time
- Conducted repairs on site in theater
Total Savings of 2,398.00 Repair complete in lt36
hours
Total Cost Savings of 15,125.00
VOICE RECORDER TAPE DRIVE END OF LIFE SPARES
PURCHASE
AIR DEFENSE SYSTEM INTEGRATOR (ADSI) HARD DRIVE
SPARES PURCHASE
- Voice Recorder Tape Drive
- NICE 900.00 (each)
- New Contract 500.00 (each)
- Cost Savings 400.00
- (x2 tape drives per shelter)
- Total Life Cycle Cost Savings
- Requirement to purchase ADSI hard drives (15)
- Received quote from OEM 1239.00 ea
- Qualified vendor quote 241.65 ea
- Savings per ADSI 997.35
Total Cost Savings of 800.00 per shelter
Total Cost Savings of 14,960.25
39Summary
- CRITICAL MILESTONE TAIS PBL Contract Awarded 30
June 05 - Next Contract Award 1 Jan 08
- A DOD / HQDA SANCTIONED SUPPORT CONCEPT
- TAIS PBL PROGRAM OVER TWO YEARS IN DEVELOPMENT
AND COORDINATION WITH ASA/ALT-ILS - HQDA PBL POLICIES AND REGULATIONS EVOLVING
- TAIS STRATEGY IS FLEXIBLE AND CONSTANTLY EVOLVING
- CRITICAL SUCCESS FACTORS LEADERSHIP TEAMWORK
- OPERATIONAL READINESS STABILIZED gt 99 FOR CFE
(PBL) - 100 CUSTOMER / WARFIGHTER SATISFACTION
- PROVEN REDUCTIONS IN TOTAL COST OF OWNERSHIP
- PLENTY OF CHALLENGES AHEAD!
- FOR THE FIRST TIME IN ATC HISTORY,
WE
HAVE AN OPPORTUNITY TO ACTUALLY IMPROVE SUPPORT
TO OUR SOLDIERS AND THEIR EQUIPMENT
40Backup Information
41Aviation Missile Life-Cycle Management
Initiative Poised for the Future
MG James H. Pillsbury Commanding General, AMCOM
ASMD AUSA Conference Panel 2 Emerging
Integrated Air Missile Defense Capabilities
Future Force 08 December 2004
42SFL Objectives
- Enhance Synergy of Acquisition, Logistics, and
Technology Communities - Enable Closer Relationship Between Army Materiel
Command (AMC) Major Subordinate Commands (MSCs)
and Program Executive Officers (PEOs) - Enhance Input Into Acquisition Process to
Influence Future Sustainment and Readiness
LOG
Project Office
BUS Mgmt
Sustainment Logistics
Tech
PM
ENGR
FMS
ACQ
Major Items
Spares
43Soldier Focused Life-Cycle Management (SFL)
A Team Redstone Initiative
- Supply Support (CL V, VII, IX)
- System Engineering
- Air Worthiness
- Quality
- Industrial Base
- Planning
- Technical Data
- Management
- Case Development
- Case Execution
- COLLOCATED FUNCTIONS
- NON-COLLOCATED FUNCTIONS
44Balance Between Process and Product
- Achieve Balance Between Processes and Products in
Each SFL Team - Tailor SFL Teams to the Needs of Each Weapon
System - Assess SFL Team Composition Regularly