Project Development Process
  • Wayne Zacher
  • November 18-19, 2008

2
Major Changes to Design Manual in the
past year
  • New guardrail guidance has been incorporated into
    Section I-06 (just happened in the last couple of
    days)
  • State Highway Classifications (Maps) were moved
    to Section I-04
  • Design Guidelines were incorporated into Section
    I-06
  • Final Plan Submittal Process (Section I-08)
  • Added Electronic Plan Review Checklist
  • Appendix I-08 A
  • Design Manual Reference and Forms Page

3
Major Changes to Design Manual in the
past year (cont.)
  • New PCR Template
  • All PCRs must follow
  • Section II-05 was revised to match the PCR
    template
  • 3 Templates were created
  • Interstate
  • US Highways
  • ND Highways
  • All misc. pages included (ex Certification Page)
  • Decision Document was added for Programmatic
    CatEx projects that are not Preventive Maintenance

4
Project Concept Reports (PCRs)
  • For projects that disturb the surrounding soil,
    including inslopes.
  • May require a number of permits (ex Floodplain,
    404, etc.)
  • Work with assigned tech support to get required
    information for permits

5
PCRs continued
  • A pre-draft review is required
  • PCR should be ready for distribution
  • Tech Support will review prior to draft
    distribution to make sure information is
    presented clear for voting members
  • Comments returned by Tech Support DO NOT need to
    be responded toonly corrected
  • Primary author (District) will follow the
    Distribution List (Appendix II-03 C) and send the
    Draft out for comment after pre-draft comments
    are incorporated

6
Programmatic CatEx Projects
  • Based on an agreement with FHWA
  • Uses the three worksheets
  • Worksheet A
  • Worksheet B
  • Programmatic CatEx
  • Review Design Manual Section II-05

7
Worksheet A
  • Yes can be checked for the Floodplain, but you
    need to contact Jeff Klien, State Water
    Commission
  • Place in FileNet when completed

8
Worksheet B
  • Statewide Safety Program Decision Document is at
    Director and Deputy Director
  • For now think of this question as are there
    areas on the project identified on the High Crash
    Rate List

9
Worksheet B Continued
  • ADA requirements Thin Lift Overlay and above
    need ADA compliant ramps
  • Check with District Signing Foreman to make sure
    the traffic control meets MUTCD
  • The MUTCD has a number of updates that need to be
    done, but there is an implementation date
  • The Signing Foreman may be looking at doing a
    sole project to update the District in one shot
  • If you have questions about if a Railroad
    Crossing has adequate protective devices you can
    call
  • Jim Styron 328-4409

10
Worksheet B continued
  • For the Cost Effective Analysis, use the prices
    on the Cost History Sheet
  • To lock the values in you need to hit Enter
    dont just click out of the table
  • This worksheet needs to be signed, sealed, and
    submitted. Also electronic version needs to be
    put in FileNet

11
Programmatic CatEx Worksheet
  • Select Project Type
  • Sign Electronically
  • Place in FileNet

12
ECL Submittal Process
  • Place all 3 worksheets on FileNet together
  • Make sure to include the electronic signature
    (i.e. /s/)
  • Designers name should be typed below the line
  • Send OPD Admin. Assistant and Tech Support a
    FileNet link
  • Include the PCN of the project in the email
  • Send OPD Admin. Assistant the original Worksheet
    B
  • These worksheets must be completed before you
    begin the Design Process

13
Decision Document forProgrammatic CatEx Projects
  • These projects are on the Programmatic CatEx
    Worksheet, but are not Preventive Maintenance
  • Follow Pre-Draft and Draft Process for a PCR
  • Template is available on the Reference and Forms
    Page of the Design Manual
  • Follows PCRs Executive Summary Format
  • Worksheets A and B added as body
  • Programmatic CatEx worksheet will be filled out
    after Decision Document is signed
  • New process so Section II-05 of the Design Manual
    has not yet been revised to reflect this

14
Final Plans
  • Section I-08 of the Design Manual is dedicated to
    Final Plan Submittals
  • Original hard set for Districts or consultants
  • Mail to your Tech Support

15
Title Page
16
Plan Signing
  • Preventive Maintenance Projects
  • District Engineer will sign the plans instead of
    the Office of Project Development Director
  • District Review Box is turned off
  • Non Preventive Maintenance Projects designed in
    the District
  • District Engineer will sign the District Review
    Box
  • Division Head will sign for Office of Project
    Development

17
Plan Signing Continued
  • Non Strategic Projects Division or Consultant
  • Division Assistant or Consultant Signs and Seals
  • Division Director signs for Office of Project
    Development
  • Strategic Projects Division or Consultant
  • District Engineer, Assistant District Engineer,
    or Project Engineer signs District Review Box
  • Division or Consultant Signs and Seals
  • Office of Project Development signs

18
Plan Signing Continued
  • Local Government Projects
  • Consultant signs and seals
  • Office of Project Development Director signs

19
Electronic Plan Set
  • Proper PDF name is
  • See CADD STANDARDS Chapter VI of the Design
    Manual
  • Electronic Plan Sheet Submittal Checklist needs
    to be completed
  • Submit your plans to
  • O\81 Special Projects\DIP PLANS Appropriate
    Bid Opening Folder
  • Consultants should submit to Tech Support

20
???QUESTIONS???