SJ5: Now what - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

SJ5: Now what

Description:

Verison. Rack. With. CIENA 4200's. 8. AbMAN. Rack. Cisco 7605. 9. AbMAN/SJ5. Leeds. CPOP. AbMAN ... Functionality to think about 'unlimited' bandwidth (2.5Gbps) ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 25
Provided by: abma3
Category:
Tags: now | sj5 | verison

less

Transcript and Presenter's Notes

Title: SJ5: Now what


1
SJ5 Now what?
  • Dr John A. Linn
  • University of Aberdeen
  • 24th January 2007

2
AbMAN/SJ4 Reminder
Gla
ED CPOP
622 Mbps
100LES
Aberdeen BAR
AbMAN EW
AbMAN-FH
RRI
AU-EW
AU-FH
MARLAB
3
SJ4 Aberdeen BAR Cisco 12000
4
SJ4 Geographic
5
SJ5 Geographical
6
(No Transcript)
7
SJ5 Verison Rack With CIENA 4200s
8
AbMAN Rack Cisco 7605
9
AbMAN/SJ5
Gla CPOP
Leeds CPOP
2.5Gbps POS
10G Eth
AbMAN EW
AbMAN-FH
RRI
AU-EW
AU-FH
MARLAB
10
(No Transcript)
11
AbMAN Changes
  • SJ4
  • Primary 622Mbps
  • Secondary 100Mbps
  • Inter-core 1Gbps
  • Resilient yes
  • IPv4 unicast
  • IPv4 multicast (but)
  • IPv6 unicast devel.
  • IPv6 multicast (no)
  • SJ5
  • Primary 2.5Gbps
  • Secondary 2.5 Gbps
  • Inter-core 10Gbps
  • Resilient Yes
  • IPv4 unicast
  • IPv4 multicast
  • IPv6 unicast
  • IPv6 multicast (?)

12
Functionality to think about
  • unlimited bandwidth (2.5Gbps)
  • Resilience
  • Managed bandwidth (point to point)
  • 10Gbps
  • 8 - 1Gbps
  • 2 for SSDN (schools)
  • IPv4 Multicast and QoS service
  • IPv6 service

13
Unlimited Bandwidth
  • AbMAN JANET usage is 100-150Mbps
  • Now WAN speeds are LAN speeds
  • Institutes connections 1Gbps
  • Implications
  • SJ5 auditor use it of lose it
  • Collaboration
  • E-science (GRID)
  • Remote backup
  • ????? (start thinking!)

14
(No Transcript)
15
SJ5 Resilience implies Site Resilience
  • Many AbMAN sites dual connected
  • Aberdeen University (automatic)
  • The Robert Gordon University
  • Aberdeen College
  • Marlab (automatic)
  • RRI Rowett
  • Two Models
  • automatic (resilience)
  • manual intervention (business continuity)

16
Managed Bandwidth
  • Known previously as UK-Light
  • Point to point 10G or 1G
  • not normal service traffic
  • Special e-science projects
  • Dangers-
  • normal traffic leakage
  • security hole

17
IPv4 DevelopmentsMulticast
  • Has been available on SJ4
  • but AbMAN better with new Cisco cores.
  • Why use it?
  • Access Grid (VC)
  • Real time streaming?
  • Difference from unicast streaming
  • unicast server to network nbandwidth
  • multicast server to network 1 bandwidth
  • Who BBC, Virgin radio, etc.
  • Beacon as monitor of multicast connectivity

18
IPv4 DevelopmentQoS
  • Normal QoS categories
  • BE best endeavours
  • Premium
  • LBE less than best efforts
  • Premium is not Guaranteed Packet Delivery
  • QoS does not solve congestion problems
  • QoS has management issues
  • LBE is very useful for large file transfers
  • to/from fast computers

19
IPv6 Development
  • IPv6 has now been around for years
  • so when will it take off?
  • IPv4 Address exhaustion (even with NAT)
  • 5 to 10 years
  • IPv6 dual stack with IPv4 deployment
  • 2 to 20 years
  • Applications
  • many compliant - see 6net as source

20
Aberdeen University and SJ5
  • Bandwidth
  • usage is growing slowly
  • home access VPNs (small)
  • remote learning
  • Managed Bandwidth
  • department in Dundee ALMI
  • medical at Raigmore - Inverness

21
Aberdeen University and Multicast
  • Have set up multicast Beacons
  • Validates that multicast traffic is working
  • Computing Science Access Grid VC
  • Electronic Research Group
  • Many applications and research
  • Futures
  • Real time streaming of graduation
  • Student TV (as per US universities)

22
Aberdeen University and QoS
  • May start remarking ALL packets to BE
  • It is the basis of mechanism CISCO uses to
    protect router from CPU overload.
  • VoIP may require it.

23
Aberdeen University and IPv6
  • Research in Networking requires IPv6
  • Electronic Research Group
  • IPv6 unicast
  • IPv6 multicast
  • beacon on AbMAN
  • problems with RPF checks
  • Set up test network and services
  • not much progress
  • Business case?

24
SJ5 and YOU
  • SJ5 bandwidth
  • SJ5 functionality
  • Users demanded it
  • SO
  • Use it or Lose it!
  • Or at least start planning to
Write a Comment
User Comments (0)
About PowerShow.com