Our Location - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

Our Location

Description:

In 2005, MTI Began Production of Ryobi Die Casting/Duramax Diesel Engine. Crankcase ... Awarded Contract For Machining of Ryobi Die Casting/Ford 6F35. Mid-Case ... – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 32
Provided by: asheawi
Category:
Tags: location | ryobi

less

Transcript and Presenter's Notes

Title: Our Location


1
(No Transcript)
2
Our Location
3
Company History
Metal Technologies, Inc. (MTI) Began In The
Early 1990's As A Metal Fabrication Division of
Our Now Sister Company Bedford Machine Tool
(BMT) Located In Bedford, IN, When Management
Decided To Try To Expand Their Longer Run
Production Capabilities.  Summary In 1998,
MTI Machining Assembly of C5 Corvette Front and
Rear Suspension
MTI Machining of Safety Cylinder Tubes In 2000,
MTI ISO 9002 Certification Bedford, IN
Location In 2003, MTI ISO 9001-2000
Certification Bedford, IN Location In 2003,
MTI Machining of GMX215 (Cadillac XLR) Front and
Rear Suspension In 2004, MTI Machining of GMX245
(C6 Corvette) Front and Rear Suspension In 2004,
MTI Machining of (7) Remy/Allison Transmission
Components
4
Company History
Summary Continued In 2005, MTI Purchased
Bloomfield, IN Facility and Began Renovation In
2005, MTI Began Production of Ryobi Die
Casting/Duramax Diesel Engine
Crankcase In 2006, MTI ISO 9001-2000
Certification - Bloomfield, IN Location In 2006,
MTI Machining Processes All Transferred To
Bloomfield, IN Facility In 2007, MTI Awarded
Contract For Machining of Ryobi Die Casting/Ford
6F35 Mid-Case Machining
5
Sales Percentages By Customer
6
Our Machining Plant Located In Bloomfield, IN
Offers A 132,000 Sq. Ft. Facility Seated On 53
Acres To Allow Us An Excellent Opportunity For
Expansion and Growth
7
(No Transcript)
8
Excellence in Practice
  • Metal Technologies Is A Company Committed To The
    Pursuit of Excellence. We Strive To Continually
    Elevate The Standard For A Job Well Done
  • Because We Believe That This Is Only Way We Can
    Keep Our Customers At The Top of Their Class In
    This Very Fluid and Competitive Economic
    Environment.
  • We Believe That Our People and Our Processes Are
    The Keys To Making Us and Our Customers
    WINNERS. Our Number One Daily Goal Is To
    Enhance The Lives and Capabilities of Our People
    So That They Can Then Implement The World Class
    Processes That Will Make Us The Best.
  • Our Commitments
  • Lean Manufacturing Training For All Employees
    Including 5s, Kaizen, Value Stream Mapping,
    Visual Management and Much More
  • Management Training From Vincennes University
  • Cross-Training of Employees
  • Continuous Improvement

9
Lean Manufacturing Training
Metal Technologies, Inc. Is Committed To
Upgrading Our Employee Performance Through
Training and Education
10
Existing MTI Jobs
  • The Following Slides Detail Some of The Machining
    Projects Metal Technologies, Inc. Is Currently
    Involved In As Mentioned Earlier
  • Corvette/Cadillac XLR Suspension Components
    Hayes Lemmerz, Intl.
  • Allison Transmission Housing Remy, Inc.
  • DMAX Crankcase Ryobi Die Casting

11
Existing MTI Jobs
  • Corvette/Cadillac XLR Front and Rear Suspension 
  • We Have Been Machining and Assembling The
    Aluminum Front and Rear Suspension Components For
    All Production Corvettes Since 1998. In Late
    2003, This Product Was Introduced As A Dual
    Platform With The Cadillac XLR. Accuracy and
    On-Time Delivery Are Paramount To This Program
    Due To The Fact That This Product Begins The
    Entire Chassis Build.
  • Project Features
  • Customer Hayes-Lemmerz, Intl.
  • 80,000 Annual Volume
  • Machined On Makino A99 Horizontal
  • Machining Centers
  • External PPM of 5 or Lower
  • Cpk of 1.67 or Above On All Key
  • Point Characteristics

12
(No Transcript)
13
Existing MTI Jobs
  • Allison Transmission Housing
  • One of Our Newer and More Complex Projects, This
    Lower Volume Bi-Metal Transmission Housing Has
    Over 1500 Machining Specifications and Tolerances
    In The /- .0003 Range On A 4 Bore. In Addition
    To Machining, We Also Perform Other Value Added
    Services Such As Air and Water Leak Testing,
    Washing, and Bore-Scoping Inspections On This
    Product.
  • Project Features
  • Customer Remy, Inc.
  • Machined On A Makino A71 Horizontal
  • Machining Center
  • State of The Art Cutting Technology
  • Cpk of 1.67 or Above On All Key
  • Point Characteristics
  • Air and Water Leak Testing

14
Mitutoyo BRTA1220 CMM Measuring A Finished Stator
Housing
Stator Housing Submerged For Water Leak Testing
Process
15
Existing MTI Jobs
  • DMAX Crankcase
  • This Is Our Latest Program Launch and Is Our
    First Automated Operation Which Includes Machine
    Tending and Part Identification. The Casting Is
    Machined From A Raw Condition In Which Product
    Quality Is Imperative To Meet Our Customer
    Requirements.
  • Project Features
  • Customer Ryobi Die Casting
  • 55,000 Annual Volume
  • Machined On A Makino A71 Horizontal
  • Machining Center
  • Fully Automated Robotic Loading/Unloading
  • and Part Identification
  • Cpk of 1.67 or Above On All Key
  • Point Characteristics

16
Monode part marker for traceability
Fanuc S-420F Robot
Rotating finished goods unloading station
Rotating raw part loading station
Overview of Automated DMAX Cell
Cell Layout Designed By Bedford Machine Tool
17
(No Transcript)
18
An Operator From The Corvette Department Unloads
Finished Parts From The Automated DMAX Cell. MTI
Encourages Employees To Cross-Train
19
Commitment to Quality
  • Quality Policy
  • Committed to Total Customer Satisfaction from a
    Customer Point of View

Every Metal Technologies, Inc. Employee Is
Trained and Motivated To Guarantee That Part
Quality Is Their Number One Priority Metal
Technologies, Inc. Has Implemented Several
Systems To Help Us Diagnose and Eliminate Quality
and Production Failures To Ensure That Our
Customer Satisfaction Standards Are Met
20
SPC Data Control - Quality Technician Eric Hamer
Analyzing DMAX CMM Data
Unigraphics - Engineer Michael Parsons Compares
The Actual Part To The CAD Model
21
Scrap and First Time Yield
  • Scrap and Rework Are
  • Tracked By Data Entry On
  • A Per Shift Basis. Any
  • Issues That Arise Causing
  • An Increase In PPM Values Are Addressed As Soon
    As Possible By Our Quality Control and Production
    Teams

22
Overall Equipment Effectiveness (OEE)
MTI Has Recently Implemented OEE On Our Machine
Tool Equipment To Manage and Evaluate Machine
Downtime To More Effectively Plan Maintenance
Schedules, Diagnose Potential Problems and/or
Provide Necessary Training To Personnel
23
Overall Equipment Effectiveness (OEE)
24
Why MTI?
  • Business Hours We Currently Machine Aluminum
    Parts 24 Hours Per Day
  • Commitment To Automation To Be Cost Competitive
    and Fully Understand The Latest In Technology
  • Plenty of Open Floor Space In Our Bloomfield, IN
    Facility
  • Access To A Hard Working Workforce (Rural Area)
  • Access To Sister Company Bedford Machine Tool
    That Has Designed and Built
  • 6-Speed RWD Dies for GMPT-Bedford
  • Pressure Test Units
  • Trim Press Machines
  • Our Personnel Have Many Years Experience In The
    Machining Industry and They Have A Clear
    Understanding of Casting Defects and What Causes
    Them
  • The MTI Staff, Production and Administration, Are
    Receiving Lean Manufacturing Training To Help
    Reduce Costs In Every Part of The Company

25
How Have We Done?
DONT JUST TAKE OUR WORD FOR IT Included Is The
Contact Information of Those Who Can Provide A
Written Letter of Recommendation On Our Behalf
Dan Burkhardt Program Manager Alcoa Automotive
Castings (616) 842-3500, Ext. 1027 dan.burkhardt_at_a
lcoa.com
David Fisher Purchasing Manager Ryobi Die
Casting, Inc. (317) 392-8318 dave.fisher_at_ryobi.com
Paul Newport Vice President Global
Operations Remy, Inc. (765) 778-5960 newport.paul_at_
remyinc.com
26
How Have We Done?
DONT JUST TAKE OUR WORD FOR IT The Following
People Are References Who Can Speak To You About
Their Experience With Metal Technologies, Inc.
Ray Solimani C6/XLR Reliability Engineer GM
Corvette Plant 270-745-8499
Paul Allison Reliability Engineer GM Corvette
Plant 270-745-8229
27
COPY
28
Our Equipment
  • Horizontal Mills
  • (4) Makino A99, Travels XYZ 1000mm (39.4)
    x1000mm (39.4) x 950mm (37.4), Full 4th Axis, (3)
    40 Tool ATC (1) 120 Tool ATC, 12,000 RPM Spindle,
    CAT 50
  • (2) Makino A71, Travels XYZ 730mm (28.7) x
    730mm (28.7) x 800mm (31.5), Full 4th Axis, (1)
    60 Tool ATC (1) 137 Tool ATC, 10,000 RPM Spindle,
    CAT 50
  • (7) Mori Seiki NH5000/40 DCG, Travels XYZ
    730mm (28.7) x 730mm (28.7) x 850mm (33.5), Full
    4th Axis, 60 Tool ATC, 14,000 RPM Spindle, CAT 40
  • Vertical Mills
  • (1) Mori Seiki MV50-E, XYZ Travels 508mm (20) x
    1000mm (39.4) x 460mm (18.1), 10,000 RPM Spindle,
    CAT 40
  • (1) CNC Bridgeport Mill, Travels 9" x 42" EZ
    Trak Plus CNC, 3 Axis Programmable Control, 3
    Axis DRO
  • (3) Bridgeport Knee Mill
  • (1) Cincinnati Mill
  • Lathes
  • (1) Mori Seiki CL-203, 6" Dia. Chuck Capacity x
    36" Max Material Length, IEMCA VIP70CNC 3'
    Advanced Feeding System
  • (1) Mazak QTN-300, 12" Dia. Chuck Capacity x
    26.8" Max Swing, Spindle Bore Dia. 3.46
  • (1) Okuma LH35-N, Front 4 Position - Rear 6
    Position Turret, 25" Swing
  • (1) Lodge/Shipley, 16" Swing x 54" Center To
    Center
  • (1) Hercules LC360A, 6" Dia. Chuck Capacity x 15"
    Swing
  • Automation
  • (1) Fanuc S-420F Robot, 6 Axis, Reach 2405mm
    (94.7), Weight Capacity 120kg. (264lb.), R-J1
    Control
  • (6) Fanuc R2000iB/165F Robot, 6 Axis, Reach
    2650mm (104.3), Weight Capacity 165kg. (363lb.),
    R-J3iC Control
  • CMM
  • (1) Brown Sharp XCEL7-10-7, Travels XYZ
    650mm (25.6) x 1000mm (39.4) x 650mm
  • (25.6), PCDMIS Software
  • (1) Mitutoyo BRTA1220, Travels XYZ 1000mm
    (39.4) x 2000mm (78.7) x 1000mm (39.4),
  • GEO Measure Software

29
Contingency Plan
IN THE EVENT THAT PRODUCTION IS INTERRUPTED
  • ELECTRIC POWER OUTAGE (Company Duke Energy)
  • Has Been Down Less Than 3 Hours In The Last 12
    Months
  • Diesel Power Generator For Limited Production
  • Part Bank
  • All Cycle Times Are Based On 20 hours. Make Up
    Lost Production 4 Hours Per Day and On Weekends.
  • Air System Outage - Backup Air Compressor Unit
  • FIRE PROTECTION/SECURITY
  • Building Has Complete Sprinkler Fire Protection
  • Fire Department Less Than 1 Mile Away
  • Building Has Automated Entry Security System
  • MAJOR BREAKAGE
  • Error Proofing of Our PMI System
  • Spare Parts Inventory
  • Bedford Machine Tool Resources For Repair

30
How to Contact Us
31
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com