Title: Streamlining Verification MTAC Workgroup 93
1Streamlining Verification MTAC Workgroup 93
2Streamlining VerificationMTAC Workgroup 93
- Mission Statement
- Collectively determine how the USPS and the
Industry can leverage existing, or guide future,
technological solutions into the mailing life
cycle that can enhance the verification and
induction process. - Workgroup Lifecycle May 2005 through Quarter I,
2006 - Four Task Teams (Subgroups)
- Vision Team
- Barcode Team
- Implementation Team
- Measurement and Reporting Team
3Vision Team (Complete Work by Sept 2005)
- Define a vision for seamless acceptance for all
classes of mail. - Determine the business value to the Industry and
the USPS for implementing the process change.
4Vision Seamless Acceptance
- Enable integrated Electronic Payment capabilities
for all customers, products services - Transition to Electronic Collaboration with all
Customers - Promote Advance Notification from Customers to
align resources against customer needs - Leverage barcodes for in process revenue
assurance controls and visibility - Transition to Inline Electronic Verification
across processing lifecycle - Adopt a risk-based verification approach
- Continuous Proactive Customer Feedback Loop
- Business Mail Acceptance Accountability for
Quality
5Vision Integrated Payment
Enabler Payment Engine
- Centralized Payment
- Customers structure account portfolios to meet
needs - Accounts linked by Customer ID that permits
visibility across all mailer locations and
products - Flexible Payment Options
- ACH Credit/Debit, FedWire, eCheck
- Available For All Products and Services
- Bulk mailings, stamps, PC postage,
P.O. Boxes, Click-N-Ship, pick-ups - Accessible Across Customer Channels
- Web, phone, post office, back dock, meter
Centralized Payment Accounts
6Vision Electronic Collaboration
Accepts Documentation
Links to Appointments (FAST)
Forwards Information To Induction Facility
(Surface Visibility)
Translate/Debit Postage, Automated Deduction
Customer Visibility Account Management, Mail
quality, Mail status
Advance notification Enables Resource Planning
7Vision Electronic Collaboration
Documentation processed, postage estimated
Appointment Status
Induction Status
Postage Charges
Customer Visibility
Mail Preparation Quality
Mail Tracking Delivery Performance
8Vision Electronic Collaboration Methods
- Comprehensive approach to electronic
documentation and postage
- Mail.dat
- File-Based Electronic Exchange
- Web Services
- Form-Based Electronic Exchange
- Web Browser Wizard
- Postage Statements Online
- Electronic Documentation translates to electronic
Postage
- Web Services
- mail.dat
- Web Wizard
9Barcode Team (Complete Work by Nov 2005)
- Guide and assess the utilization of
customer-applied bar codes across the supply
chain - Identify and resolve issues relating to postal
specifications for customer-applied barcodes. - Recommend specifications for customer barcode
elements that will meet the needs of the mailing
industry and support effective use of barcodes in
providing multiple services and postage
reporting.
10Leverage Barcode
Identity Unique ID across assets, containing or
linked to customer IDs
MTE License Plate
Truck/Trailers
Pallet / MTE Placard
24-Digit Handling Unit (Tray) Labels
Unique Mailpiece ID (4-State, UCC EAN 128)
11Implementation Team (Complete Work by March 2006)
- Define processes for automated verification for
Standard and Periodical mailers utilizing pallet
and bundle barcodes. Initiate a proof of concept
for automated verification with pallet barcodes. - Develop, guide, and assess a proof of concept
pilot to be launched on August 2005 for an
electronic 8125. - Implement the e8125.
12MTAC Workgroup 84
Presort Info. Container Appts. Verification Pay
ment Release 8125 Shipment Status Reconciliati
on Report
Scheduling
Appointments
e8125s
Induction
PostalOne!
13Measurement and Reporting Team (Complete Work by
March 2006)
- Apply experience and findings from Implementation
Team to enhance the utilization of data
throughout the supply chain. - Determine quality metrics to position data from a
quality improvement orientation rather than audit
approach.
14Work Group 93 Notional Schedule
Vision Team 05/17/05 9/30/05
Barcode Team 05/17/05 11/30/05
Implementation Team 08/08/05 03/31/06
Pilot 1 08/25/05 11/30/05
Pilot 2 11/30/05 01/31/06
Measurement and Reporting 09/01/05 03/31/06
Meeting Schedule
May MTAC
June Telecon IDEA
July Telecon
Aug 16 MTAC
Sept Telecon
Oct Telecon
Nov MTAC
Dec 2005
Jan 2006
Feb 2006
Mar 2006