Child Nutrition Facilities Layout - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

Child Nutrition Facilities Layout

Description:

... and Verifying Weight various thermometers and various scales with appropriate weight capacity ... Meat slicer-manual or automatic, disposers in prep. ... – PowerPoint PPT presentation

Number of Views:93
Avg rating:3.0/5.0
Slides: 36
Provided by: cnpA7
Category:

less

Transcript and Presenter's Notes

Title: Child Nutrition Facilities Layout


1
Child Nutrition Facilities Layout
  • Murray-Corban Foodservice Design Consultants
  • Bill Murray, FCSI
  • Karen Corban, MA, RD, LD

2
Facility Layout and Design and Equipment
Specifications
  • Objectives
  • Upon completion of this workshop segment
    participants will be able to
  • Identify Industry Professional and understand
    their roles as a resource for designing school
    kitchen
  • Understand the functional areas of a school
    kitchen as they related kitchen design

3
  • WHEN do we need to know about designing
    kitchens
  • WHO needs to be involved in designing kitchens
  • HOW do we develop the concept and design

4
When
  • Replacement of Existing Equipment
  • Purchasing New Equipment
  • Renovation of Existing Kitchen
  • Construction of New Kitchen

5
Who
  • Foodservice Director
  • Foodservice Staff Manager
  • School Administrators
  • Architects/Engineers
  • Food Service Design Professionals
  • Equipment Dealers/Representatives
  • Health Department

6
How
  • Know the Professionals and the Roles they play
  • Architects
  • Food Service Design
    Consultants
  • Equipment Dealers
  • Manufacturers Representatives

7
Menu drives the design process
  • State and Federal Regulations
  • offer vs. served
  • Scratch vs. Convenience
  • Food Quality
  • Food Safety

8
Market
  • Who is your customer
  • What kinds of products will the customer want and
    need
  • What hours are your customers available
  • What is your competition
  • Is the market area increasing or declining

9
Money
  • What is your budget
  • Where are the funds generated
  • USDA
  • Bond Issue
  • District Funds

10
Management
  • Labor
  • Food Cost
  • Serving Times
  • District Expectations
  • Team Input

11
Project Development
  • Steps
  • Vision of Project
  • Completion of the Four Ms of Conception
    Development
  • Development of Design
  • Development of Equipment Specifications/Bid
    Document/Bidder Requirements

12
Writing Specs
  • Steps
  • Determine what piece of equipment is needed, ex.
    Kettle vs. Tilt Skillet
  • Determine features desired or needed
  • Determine brand of equipment to use as basis for
    writing the specification
  • Verify Utilities
  • Write Specifications

13
Resources
  • Manufacturers Catalogs
  • Internet, Company Web Sites
  • Design Consultants
  • Equipment Dealers
  • Manufacturers Representative
  • Other Food Service Directors

14
Writing Specifications
  • Know Federal and State Regulations
  • Allow for Competition or seek approval for one
    source only
  • BE EXPLICIT AND ACCURATE!!!!!!!!!!!

15
Spec Writing
  • Left end as Operator faces to have double tier
    stainless steel shelf approximately 72"L that
    runs from end nearest the hot wells and ends at
    the sandwich slide. Top shelf to be 18"D and
    12"H. Lower shelf to be 18"D and 16"H. Lower
    tier ON TWO UNITS ONLY( UNITS CLOSET TO EXTERIOR
    WALL). to have a tempered glass hinged counter
    protector that is framed in stainless steel that
    goes from bottom of lower shelf to within
    approximately 1" of counter top. This full
    length counter protector to be in front of hot
    wells only. The two (2) units located nearest the
    dishroom ( SEE FS-1) are to be modified-See
    drawings. These two units to have a single sided
    buffet protector with a customized removable
    plexiglass protector. Single sided buffet
    protector to extend to sandwich slde and
    removable protector to be in front of hot wells
    only. This lift off plexiglass panel framed in
    stainless steel with stainless steel ends to be
    of sufficient height to allow 1 air space on
    bottom when adjusted to minimum height. Stainless
    steel bracket stud welded to sneezeguard upright.
    Notches to be fabricated in the stainless steel
    end of removable panel that will fit securely
    over the bracket. The top tier to have an
    adjustable hinged tempered glass framed in
    stainless steel 6" breath protector. Lights
    and infra red heat strips to be installed
    underneath each shelf and to be full length

16
Removable Protector
17
Functional Areas
  • Receiving
  • Storage-Cold and Dry
  • Food Preparation and Cooking
  • Serving
  • Warewashing
  • Miscellaneous-Office, Restroom, Janitorial

18
Receiving
  • Inspection-well lit covered area, sanitary and
    means to wash down the area
  • Checking- table for placing invoice, writing
    supplies and calculator
  • Counting-enough square footage to move cases of
    food around for counting
  • Taking Temperature and Verifying Weight
    various thermometers and various scales with
    appropriate weight capacity
  • Dock Height-important to be aware of

19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
Storage
  • Walk-in Freezer and Cooler Configuration-separate
    doors or walk thru, under building roof or
    outside under weatherproof roof, floor recessed
    to be level with building floor or ramp to enter.
    Condensers to be located on roof, ground or
    between ceiling and roof. Isle space
    determination.
  • Interior and Exterior design of
    walk-ins-stainless steel, stucco aluminum, smooth
    aluminum, tile floor, aluminum diamond tread
    floor.
  • Shelving Style- chrome, epoxy coated,
    polypropylene, starter units only or starter and
    add on units, casters or legs, cantilever
    style-tubular, channel or solid. Dunnage racks.
  • Security-locking system, computer locking
    systems, alarm systems for walk-in
    coolers/freezers, visual view of office,
    pre-hours entry for delivery people.
  • Chemical Storage-water needs for chemical
    dispensing method, accessible to dishroom,
    cafeteria, etc., sufficient storage and utility
    connections for floor cleaning equipment.
  • Sanitation-configured for cleaning of floors to
    prevent damaging food and supplies, controlled
    temperature and no windows to outside light.
  • Delivery Accomodation-located so as not to
    interfere with food preparation, but must be
    accessible and convenient to preparation area.

23
Preparation and Cooking
  • Work Tables- drawers, pan slides, drawer slides,
    work sinks and protection of required plumbing,
    pot racks, flanged feet, welded or adjustable
    undershelf, marine or bull nose edge, backsplash,
    receptacle, casters.
  • Small Equipment- food processor/buffalo chopper,
    VCM/Mixer, size of mixer 20,30,40 or 60 Qt.,
    produce slicer, can openers-electric or manual.
    Meat slicer-manual or automatic, disposers in
    prep. area-automatic reversing or manual
    reversing.
  • Cooking Equipment-Combi Oven /Convection
    Oven/Microwave-Convection-Radiant Oven, 2-Burner
    range/Instant Hot Water Dispensing/6 Gal. tilting
    kettle, Tilting Kettle/Tilting Skillet,
    Fryer/Combi, Cook and Hold Ovens
  • Holding Equipment-Pass thru units for hot and
    cold-glass viewing doors, casters, legs or
    mounted on concrete curb. Mobile warming cabinet-
    insulated/non-insulated, casters, legs,
    serviceability, element replacement, exterior and
    interior finish, universal slides/shelves. Blast
    chiller- upright, undercounter or worktable
    style, probes-heated or unheated, number of
    probes. Refrigeration-reach-in/roll-in
  • Hand Sinks-local health department should be
    contacted for local code.

24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
Serving
  • Food Court or Kiosk
  • Standard Serving Lines
  • Self Service
  • Staff Served
  • Combination of Staff and Self Service
  • Salad Bar/Pre-made salads
  • Extra Sales
  • Vending
  • Hand Sinks-contact local Health Department for
    local code

28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
Warewashing/Garbage Disposal
  • Purchase or Lease
  • Chemical or High Temp Sanitizing
  • Pant Leg/Two Duct/Condensate Hood
  • Internal or External Booster Heater
  • Disposer/Pre-rinse sink/Pot and Pan
    Scrapper/Water Trough/Pre-rinse on dishmachine
  • Hose Reel
  • Dish Rack Storage
  • Permanent Ware or Disposables-silverware chute
    and soak sink
  • Hand Sink
  • Direct line to back door for trash disposal
  • Accessible to preparation area and serving area
  • Dish drying area and storage of clean trays
  • Three compartment sink-prep area or dishwash
    area.

34
Miscellaneous
  • Office-windows for viewing receiving, preparation
    and serving. Easy access to teachers, students
    and parents without violating the food production
    area.
  • Bathroom-check local code for foyer requirement,
    must be ADA approved , verify door swing per
    local code.
  • Lockers-check Health Department Code
  • Can Wash Area-industrial spray arm, double pantry
    faucet, fabricated sink, concrete curbed area.
  • Ice Machine-locate near serving line, locate near
    back door for athletics and field trips,
    automatic cleaning cycle.
  • Clothes Washer and Dryer-outside wall is best

35
General Rule of Thumb
  • Isle space in work area-4 feet wide
  • Isle space in front of serving line for ADA
    approval-3 feet
  • Back Door opening- Min. 42
Write a Comment
User Comments (0)
About PowerShow.com