1
  • BOARD OF COMMISSIONERS TRAINING
  • U.S. DEPT OF HOUSING AND URBAN DEVELOPMENT
  • Physical Facilities and Maintenance
  • March 2009

2
Board Of Commissioners Training Series
  • The Commissioners Role
  • The Executive Directors Role
  • Agency Management
  • Financial Operations and Oversight
  • Physical Facilities and Maintenance
  • Procurement and Contracting Overview
  • Preventing and Resolving Audit Findings
  • Performance Measures
  • PHAS, MASS, FASS, PASS, SEMAP
  • IX. Conducting an Effective Board Meeting
  • X. Emergency and Disaster Preparedness

3
COMMISSIONERS ROLE
  • As a commissioner, you are ultimately
  • responsible for maintaining units in
  • decent, safe, and sanitary condition
  • as required by the Annual Contributions
  • Contract. To do this, PHAs must
  • implement comprehensive maintenance
  • programs.

4
Comprehensive Maintenance Program
  • An effective program requires
  • A well-defined maintenance policy and appropriate
    implementing procedures
  • Appropriate organizational structure
  • Short and long term planning
  • Emergency or Special Project
  • Multi-Year Plans and Goals
  • Annual Maintenance Plan
  • Effective management
  • Physical Needs Assessment

5
Emergency or Special Project
  • Unanticipated events such as accidents,
    emergencies, or disasters may require special
    planning action.
  • As soon as possible following the occurrence of
    the event and as a part of the corrective action
    the impact on on-going annual and long term
    planning and budgeting should be addressed.
  • Where required appropriate documentation and HUD
    approval should be obtained.

6
Multi Year Plans and Goals
  • Large or complex projects may exceed annual
    workload and budget capacity, but may not meet
    the criteria for capital programs
  • Close coordination between multi-year projects
    and annual maintenance plans and budgets is
    required

7
Annual Maintenance Plan
  • Routine and Seasonal Work
  • Annual Inspections
  • Vacant Units
  • Preventive Maintenance
  • Emergencies
  • Extraordinary Repairs
  • Service Contracts
  • Staff
  • Materials, Supplies, Equipment
  • Budget

8
Annual Maintenance Plan
  • Incorporates the overall scope of work for the
    year.
  • A prioritized schedule of carrying out the work
    items.
  • Based on available and planned resources.
  • The budget should fully support the Annual
    Maintenance Plan.

9
Annual and Systems Inspections
  • Each unit is required to be inspected annually
    using the Uniform Physical Condition
    requirements.
  • Emergency items must repaired within 24 hours.
  • Non-emergency items must be corrected within 25
    days.

10
Grounds Inspections
  • PHAs should conduct frequent
  • inspections of the grounds and
  • interior common areas. These areas
  • play a major role in determining
  • Resident satisfaction
  • Community image
  • Safety Concerns

11
Grounds Inspections
  • Trash on grounds
  • Cars improperly parked
  • Vandalism and graffiti
  • Newly vacated units (skips, moves)
  • Hallways and corridors
  • Light conditions and other security problems
  • Common areas
  • Erosion problems
  • Sidewalks
  • Fencing
  • Playgrounds
  • Landscaping

12
Preventive Maintenance
  • Ensures that facilities, equipment, and
    systems remain in good working
    order.
  • Extends the lifetime of facilities, equipment,
    and systems.
  • Minimizes the need for regular maintenance and
    extraordinary repairs

13
Preventive Maintenance
  • Preventive Maintenance should include
  • HVAC Heating, Ventilation, Air Conditioning
    Systems
  • Boilers Furnaces Heat Pumps Air
    Conditioners
  • Vehicles and Equipment
  • Trucks Cars Lawn Mowers Fork Lifts

14
Preventive Maintenance
  • Electrical Equipment
  • Portable Generators
  • Building Envelop Items
  • Roofs Windows Siding Gutters/down spouts
  • All Emergency Equipment

15
Unit Turnaround
  • Unit turnaround represents the number of
  • days between the time when the unit is
  • vacated and a new lease takes effect.
  • PHAs must have vacant units reoccupied
  • as quickly as possible. Under PHAS, PHAs
  • must turnaround units within 20 days to
  • achieve a score of A.

16
Maintenance
  • The quality of the
  • maintenance is
  • determined by
  • Board decisions
  • Supervision and coordination
  • Skilled staff

17
Maintenance
  • Work Order System
  • Heart of any maintenance operation
  • Tracks the time and materials needed for demand
    maintenance
  • To achieve an A under PHAS, at least 99 of
    emergency items must be completed within 24 hours
  • To achieve an A under PHAS, all non-emergency
    work orders must be completed within 25 days

18
Maintenance
  • Emergency Maintenance
  • Fire
  • Water leaks
  • Hazards
  • Safety
  • Tenant initiated
  • Gas Leaks
  • Electrical wiring worn, exposed or unsecured

19
Maintenance
  • Warehousing and Inventory Control
  • Inventory control identifies all materials,
    supplies, and equipment needed to insure
    continuity in the maintenance program
  • All inventory must be accounted for at all times
    and safe-guarded
  • PHAs should perform at a minimum annual
    inventory reconciliations - include information
    on materials in stock at start, items purchased,
    materials used for repairs and discards for
    reasons of obsolescence
  • Inventory control reports provide information for
    PHA future needs and should be considered in
    budget development

20
Modernization
  • Progress reported to HUD and assessed under PHAS,
    subsystem MASS
  • Procurement and Contract Administration
  • Building Codes
  • Development
  • Funded separately from Operating Budget
  • Included in PHA Plan

21
Safety
  • Environmental Safety
  • Lead based paint
  • Asbestos
  • Mold
  • Physical Safety
  • Smoke and carbon monoxide alarms
  • Building exits
  • Tenant safety

22
Procurement
  • Procurement should be conducted in
  • accordance with the PHAs procurement policy.
  • PHAs must have
  • Procurement Policy
  • Contract Administration System
  • Written code of standard of conduct
  • Award contracts only to responsive and
    responsible contractors
  • Maintain sufficient records to support all
    procurements

23
Curb Appeal
  • If you wouldnt want to live there why would
    anyone else?