Title: New Slide
1New Slide
2Schedule
3- Next Linear Collider
- Conventional Facilities
- Web Based Integration
Corvin 99.11.03
4Next Linear Collider Schematic Diagram
Electron Source
Matter Anti-Matter Interaction Point _at_ 0.5
TeV
Positron Source
5NLC Perspective View
Klystron Gallery
- Highlights
- 20 miles long
- One-half mile wide
- 330 MW power
- 4.4 mgd makeup water
- Tunnel 50 feet below grade
- Earth-covered klystron galleries at 250-yard
intervals - 100-acre campus
- Approximately 2500 employees
- Radiation exposure less than background
6Main Linac Klystron Gallery Support Buildings
Linac Cartoons
lt Klystron Halls
within
Support Bldg. gt
92 Buildings, 6700 SF Each, w/ Concrete Floor,
Walls, Roof at Grade with 1 Meter Earth Berm
Cover. Adjacent Roadway, Power, Water,
Communications Utilities
7BaBar - NLC Contrast
- BaBar Project Web - Mature, High
Level Exceptional - NLC Project Web -
New, Evolving, Pre-Conceptual, Open, Varied,
Diverse Growing
8Abstract
ie Web Any Browser
9Credits
- Chris Adolphsen
- Nick Arias
- Nick Braughton
- David Burke
- Bob Fuller
- Jon Ives
- Keith Jobe
- Ruth McDunn
- Kyle Millage
- Mike Neubauer
- Tor Raubenheimer
- Javier Sevilla
- Julia Weiler
- Zane Wilson
10NLC Project Web Software
Goal 2 Platforms, 2 Browsers, GIF JPEG
Graphics
PC Project WinNT 4.0
Mac www OS 8.5
PC www WinNT 4.0
- Navigator
- Explorer
- Front Page
- Eudora
- Hyper Snap
- Acrobat
- Power Point
- Prizm
- Solid Edge
- Navigator
- Explorer
- Eudora
- Acrobat
- Word
- Excel
- Power Point
- Access
- Primavera
- Sure Track
- Success
- Navigator
- Explorer
- Acrobat
- Eudora
- GraphicConverter
- Design 3D
- KeyCAD
Initial Tools
11Feb98 Startup - (PA bedroom _at_ 130 am)
Goal Access My Stuff to Work on it Anywhere,
Anytime
- NLC Concepts Motivation
- Mac Laptop w/OS 7.5
- Navigator 3.0
- Design 3D Modeling Tool
- No Formal NLC Project Organization Yet
- No NLC Web Server Yet
- No Home-Work Network Interface Yet
- No NLC Project Software or PC Yet
12www.geocities.com/collider
13Notice - Disclaimer
14Collider Scroll Page
15Virtual View Rear Isle Workspace
16Rack Layout
17Linac Support Building Wire Frame View Into Earth
Cover
Conceptual Linac Layout
18Isokeraunic Map
Thunder-Storm Days per Year
40X
5X
90X
19Sketch
20Main Linac Subsystems - Integrated Composite
Layout View
Conceptual Layout
Breakaway View
Ready for CDR
21Resource Loaded Schedule 2 of 2
FY 99 FY 00 FY 01 FY 02
FY 03 FY 04 FY 05 FY 06
22Ready for CDR
Campus Overview - 750,700 SF
23Work Breakdown Structure
24Beamline Schematic WBS Structure
Beamline Facilities Map to Same WBS Format
- 142X Housings
- 1421 Injectors
- 1422 Damping Rings
- 1423 Pre-Linac
- 1424 Main Linac
- 1425 Collimation .
IP Switch - 1426 I R Transport 1
- 1427 I R 1
- 1428 I R Transport 2
- 1429 I R 2
25Cost Estimates
26Pre Post Bootstrap Timeline
- Launch Collider on Geocities
- Move to NLC Office w/PC Mac
- Geocities - NLC Server Transfer
- Formal NLC Project Organization
- Geocites IPO - Yahoo! Buyout
- NLC Project Software Integration
- NLC Formal Review for Pre-CDR
- February 98
- May 98
- September 98
- October 98
- November 98
- December 98
- May 99
27NLC Project Software Applications
Success- WBS Cost
Access- Data Base
SureTrak- Schedule
FrontPage- WWW
28NLC URLs
Project
http//www-project.slac.stanford.edu/nlc/home.html
Laboratory
http//www.slac.stanford.edu
29NLC Project Homepage
Click
Author Ruth McDunn
30NLC Tech Page
Click
Authors Keith Jobe Nixx Arias
31Schedule Page
Author Nixx Arias
32NLC Technical Home Page
Click
Authors Keith Jobe Nixx Arias
33NLC Conventional Facilities Home Page
Body
Sidebar
34NLC Web Layout - Sidebar
- Blue Fade Sidebar
- Edit-Refresh Date
- Home Page Link
- Japan Project Content
- USA Project Content
- Site Search Tools
- Collaborator Links
- Disclaimers
- Comments Suggestions
Authors Keith Jobe Nixx Arias
35NLC Web Layout - Main Link Page
- Banner Logo
- Project Content
- Project Content
- Contacts, E-Mail, Map
- Meeting Minutes
- Comments Suggestions
- Edit-Refresh Date
36Integrated CDR Schedule
37AE Task Order Work Packages
38Campus Manufacturing Tenant - WBS 12
Typical Process Detail
Typical Summary Detail
39Main Linac Klystron Gallery Support Building
Overview
Conceptual Layout Cartoon
- Earth Covered for Thermal, Acoustic, Aesthetic
Isolation - Power Cooling Utilities Offset on Adjacent Pad
Isolating Vibration - Support Building Contains Klystrons, Modulators,
Power Supplies, IC Racks, Power Water
Distribution
40Drawing Lists
41Sample (of many) Wbs 142 Main Linac Facilities
System Costs Sheet
42NLC Web Linked E-Mail
- Document Link
- Meeting Minutes Link
- Project Homepage Link
- User E-Mail Link
- User Homepage Link
43NLC Reliability Definitions
Source http//www-osma.lerc.nasa.gov/rbd/rbd_attc
.html
MTBF Mean Time Between Failures (in hours)
1 Year 8760 Hours
Lambda (L) Failures per Unit Time (one year)
Single System Reliability e - L t d
Where t Mission Time (1.00 Year) d
Duty Cycle (1.00)
Parallel Redundant Reliability 1 - ( 1 - Ri ) N
For N number of identical systems each of which
has a reliability of Ri
44Illinois Sites
North South
East-West
45Precast Layout Section
- RF Penetrations _at_ 3.75 Inches Diameter
- Concrete Shielding _at_ 10 Feet
Scaled Image Ruler
46Linac Section Layout Models
1/3 Billion
1/2 Billion
3/4 Billion
3/4 Billion
47DLDS RF Distribution Defines the Linac Facility
Layout
Klystron Gallery
At Surface Underground
Linac Tunnel
57 Meters
171 Meters
48Linac Support Building Beam Housing Tunnel
- Surface Support Building
- Penetration Shielding Plug
- RF Combiners
- Klystrons Modulator
- Downhole RF Penetration
- Beam Housing Tunnel
- Cable Trays
- RF Distribution Piping
- RF Structure Strongback
- Magnet Support Pedestal
- Cooling Water Piping
49Summary
The NLC Conventional Facilities Web Collects
Exhibits Pre-Conceptual Project Information
Allows One to get to
Their Stuff Anytime Anywhere
50Conclusion
World wide web based integration for the Next
Linear Collider Conventional Facilities has moved
through startup into the pre-conceptual phase
consistent with the current project and the users
needs. The level of access and the tools
available are open and effective. For a
pre-conceptual environment, one that stimulates
creative interest and affords ample
participation, the mix is just right.