Title: ASCE PRESENTATION: LIMEY POINTE PUD
1ASCE PRESENTATIONLIMEY POINTE PUD
2Presented by Fall 2006 Senior Project Class
- Josh Beckman
- Marshall Bird
- Brian Bondurant
- Blake Bretz
- Casey Colbern
- Josh Howard
- Stelios Kapsalis
Patrick Shearer Patrick Sheedy Scott
Sutherland Andrew Wedekind Maurice Wheat Michael
Winckler
Eric Lundborg Therese Mersmann Bryan
Millard Miguel Portillo Ben Rufenacht Paul
Sadowski
3OVERVIEW
- Introduction and Background of Site
- Task 1- Site Planning, Layout, and Design
Guidelines - Task 2- Utilities and Drainage
- Task 3- Structural Design
- Task 3 continued- Geotechnical Investigation
4 - Task 1
- Design Guidelines, Site Planning, and Layout
Presented by Casey Colbern
5 6Ground Floor Elevations
- Elevations are governed by 2 site drainage
- Must be at least 1 foot above 100 year flood
elevation of 1008.00 (FEMA, 2003) - Ground Floor Elevations were set at 1010.92 to
satisfy requirements
7Parking
- Parking Spaces Handicapped Spaces
- Pizza Hut 54 3
- IHOP 75 3
- Taco Bell 38 2
- Wendys 47 2
- Expert Tire 24 2
8Site Layout
9Aesthetics
- 18 trees will be placed throughout the site to
satisfy the one 2 ½ inch caliper tree for every
5,000 square feet - 21 green space
- A six (6) ft tall sight-obscuring screen will be
placed on the north side of the property
10Pavement Design
11Curb Design
12Task 2 Utilities Drainage
- Presented by
- Patrick Shearer
13TASK 2 Utilities and Drainage
- 2a-Water Supply Design
- 2b-Sanitary Sewer Design
- 2c-Storm Water Drainage Design
142a-Water Supply Design
- Existing pipes
- Bluemont Tower
- 8in. McCall and Hostetler Iron Lines
- Water Demand- 1500 gpm
- New Pipes-3, 6 Ductile Iron
- Fire Hydrants
- 2 additional hydrants installed
15(No Transcript)
162b- Sanitary Sewer Design
- Existing Sewer
- 8in. McCall and Hostetler VCP
- New Sewer Lines
- 3, 4, 6 PVC
- 9 Capped Cleanouts
17(No Transcript)
182c- Storm Water Drainage
- Storm Water Estimates
- 100 year flood plain
- Storm Water Drainage Pipes
- RCP
- 2 culverts under Limey Place
- Curb Design- standard 6
19(No Transcript)
20Structural DesignAtlas Engineering
- Presented by
- Paul Sadowski
21Step 1 Building Layout
- Floor Plan
- Column Arrangement
- Roof System
- Some buildings had Pre-Lim Designs while others
started from scratch.
22Building Overview
23Step 2 Determine Loads
- Dead Load
- Live Load
- Snow Load
- Wind Load
- Using Tributary Area, roof pitch, etc. and
researching in IBC and UBC.
24Step 3 Determine Building Material
- Steel
- Wood
- Concrete
- Choose by user needs, cost, ease of construction,
and familiarity.
25Step 4 Structural Members
- Beams/Girders
- Trusses/Joists
- Columns
- Wind Resistance
26Structural Members
27Step 5 Elevations
Determine N/S and E/W Elevations
28Step 6 Connection Details
29Blue River EngineeringBryan Millard, Patrick
Sheedy, Andrew Wedekind, Mike Winckler
Blue River Engineering Consultants where the
designs of tomorrow existToday
- Wendys Geotechnical Investigation
- And Foundation Design Limey Pointe
- Presented by
- Josh Howard
30Site Layout Wendys Location
31Geotech Profile for Wendys
32Foundation Footing Layout
33Square Footing Design Details
34Continuous Wall Footing Design Details
35Column Square Footing Connection Details
36Continuous Wall Footing Connection Details
37QUESTIONS??