ASCE PRESENTATIONLIMEY POINTE PUD
2
Presented by Fall 2006 Senior Project Class
  • Josh Beckman
  • Marshall Bird
  • Brian Bondurant
  • Blake Bretz
  • Casey Colbern
  • Josh Howard
  • Stelios Kapsalis

Patrick Shearer Patrick Sheedy Scott
Sutherland Andrew Wedekind Maurice Wheat Michael
Winckler
Eric Lundborg Therese Mersmann Bryan
Millard Miguel Portillo Ben Rufenacht Paul
Sadowski
3
OVERVIEW
  • Introduction and Background of Site
  • Task 1- Site Planning, Layout, and Design
    Guidelines
  • Task 2- Utilities and Drainage
  • Task 3- Structural Design
  • Task 3 continued- Geotechnical Investigation

4
  • Task 1
  • Design Guidelines, Site Planning, and Layout

Presented by Casey Colbern
5
  • SITE LOCATION

6
Ground Floor Elevations
  • Elevations are governed by 2 site drainage
  • Must be at least 1 foot above 100 year flood
    elevation of 1008.00 (FEMA, 2003)
  • Ground Floor Elevations were set at 1010.92 to
    satisfy requirements

7
Parking
  • Parking Spaces Handicapped Spaces
  • Pizza Hut 54 3
  • IHOP 75 3
  • Taco Bell 38 2
  • Wendys 47 2
  • Expert Tire 24 2

8
Site Layout
9
Aesthetics
  • 18 trees will be placed throughout the site to
    satisfy the one 2 ½ inch caliper tree for every
    5,000 square feet
  • 21 green space
  • A six (6) ft tall sight-obscuring screen will be
    placed on the north side of the property

10
Pavement Design
11
Curb Design
12
Task 2 Utilities Drainage
  • Presented by
  • Patrick Shearer

13
TASK 2 Utilities and Drainage
  • 2a-Water Supply Design
  • 2b-Sanitary Sewer Design
  • 2c-Storm Water Drainage Design

14
2a-Water Supply Design
  • Existing pipes
  • Bluemont Tower
  • 8in. McCall and Hostetler Iron Lines
  • Water Demand- 1500 gpm
  • New Pipes-3, 6 Ductile Iron
  • Fire Hydrants
  • 2 additional hydrants installed

15
(No Transcript)
16
2b- Sanitary Sewer Design
  • Existing Sewer
  • 8in. McCall and Hostetler VCP
  • New Sewer Lines
  • 3, 4, 6 PVC
  • 9 Capped Cleanouts

17
(No Transcript)
18
2c- Storm Water Drainage
  • Storm Water Estimates
  • 100 year flood plain
  • Storm Water Drainage Pipes
  • RCP
  • 2 culverts under Limey Place
  • Curb Design- standard 6

19
(No Transcript)
20
Structural DesignAtlas Engineering
  • Presented by
  • Paul Sadowski

21
Step 1 Building Layout
  • Floor Plan
  • Column Arrangement
  • Roof System
  • Some buildings had Pre-Lim Designs while others
    started from scratch.

22
Building Overview
23
Step 2 Determine Loads
  • Dead Load
  • Live Load
  • Snow Load
  • Wind Load
  • Using Tributary Area, roof pitch, etc. and
    researching in IBC and UBC.

24
Step 3 Determine Building Material
  • Steel
  • Wood
  • Concrete
  • Choose by user needs, cost, ease of construction,
    and familiarity.

25
Step 4 Structural Members
  • Beams/Girders
  • Trusses/Joists
  • Columns
  • Wind Resistance

26
Structural Members
27
Step 5 Elevations
Determine N/S and E/W Elevations
28
Step 6 Connection Details
29
Blue River EngineeringBryan Millard, Patrick
Sheedy, Andrew Wedekind, Mike Winckler
Blue River Engineering Consultants where the
designs of tomorrow existToday
  • Wendys Geotechnical Investigation
  • And Foundation Design Limey Pointe
  • Presented by
  • Josh Howard

30
Site Layout Wendys Location
31
Geotech Profile for Wendys
32
Foundation Footing Layout
33
Square Footing Design Details
34
Continuous Wall Footing Design Details
35
Column Square Footing Connection Details
36
Continuous Wall Footing Connection Details
37
QUESTIONS??
Write a Comment
User Comments (0)
About PowerShow.com