Title: BUILD OPERATE TRANSFER


1
Case Study Construction Management Project
Delivery Systems
CEM 525 Project Delivery Systems (CEM 525)
CLASS-5 BY MOHAMMED JALALUDDIN LECTURER CONSTRU
CTION ENGINEERING MANAGEMENT DEPT
2
Presentation Outline
  • Case Studies Construction Management PDS (
    CM-Agency and CM _at_ Risk or CM/GC or CMc)
  • Case Study 1 Construction Management at Risk An
    Innovative Project Delivery Method at Storm water
    Treatment Area (STA ¾) in the Everglades, Florida
  • Case Study 2 Oakland International Airport
    Terminal Expansion Project (TEx)
  • Case Study 3 World Trade Center Memorial
    Foundation
  • REQUEST FOR QUALIFICATION ( RFQ), REQUEST FOR
    PROPOSAL PREPARATION, RFQ EVALUVATION

3
Objectives of Class
  • Understand the different types of Project
    delivery systems
  • Provide case studies of CM_at_ RISK/ CM/GC/CMC in
    construction Industry

4
Background Construction Management _at_ Risk
  • Over the past five years, enacted laws and
    industry support has paved the way for CM_at_R in
    the public sector.
  • New York, Florida, Texas, California and Arizona
    are just a few states that have passed
    legislation favorable to CM_at_R.
  • The American Institute of Architects, has also
    publicly supported the method where appropriate.
  • Texas has been particularly active, with nearly
    a third of its projects now using
  • CM_at_R, representing 300-500 million per year in
    construction.
  • Across the U.S.,CM_at_R has been estimated to
    account for more than 48 billion on average each
    year in construction contracts beween 2001 and
    2004.
  • In school construction, CM_at_R has become the
    preferred delivery system in some states.

5
Background Construction Management _at_ Risk
6
Case Study 1
  • Construction Management at Risk An Innovative
    Project Delivery Method at Storm water Treatment
    Area (STA ¾) in the Everglades, Florida
  • Young H. Kwak, Ph.D. and Randall Bushey, P.E.

7
Case Study 2
  • Case Study 2 Oakland International Airport
    Terminal Expansion Project (TEx)
  • Greg Cunningham, AIA.

8
Case Study 3
  • Case Study 3 World Trade Center Memorial
    Foundation

9
Questions