1Beam dump for J-Parc neutrino facility
2Requirement
For the 1st phase accept 0.75 MW beam For the
2nd phase accept 4MW beam Heat Load Among
total beam power, 20 is deposited at dump.
Radiation shielding 11mSv/h at the boundary
of concrete and soil 0.25mSv/h at the
surface of soil Muon Monitor monitor the
direction and intensity of the beam
3Thickness required for radiation shielding
Top View
The amount and shape of iron should be optimized.
Front View
Side View
4Heat load from radiation
At x0 plane
unit J/cm3/pulse
5Example of Heat Analysis(4MW)
½ Model
Boundary condition (All) outer surface of the
iron is cooled by water.
concrete
Temperature distribution in Iron
beam
iron
soil
Result Max. in iron 700oC
-gt need aluminum plate or something in
concrete 54oC
6Muon monitor
Monitoring of the beam direction and
intensity. Threshold 8 GeV/c ? Probably 5
GeV/c is preferable (under study) To achieve 5
GeV/c threshold, the monitor has to be installed
between irons under high radiation condition.