Title: ELLEC COMP INC' Supply Chain Management


1
ELLEC COMP INC.Supply Chain Management
Ferani Eva Zulvia (M9801808) Yuli Sri Afrianti
(M9801810) Kartika Akbaria (M9801811)
2
Content of Presentation
3
ABOUT ELECCOMP INC.
4
Objective
HOW TO ACHIEVE THOSE OBJECTIVES??
5
  • PUSH-BASED SUPPLY CHAIN STRATEGY
  • Make-to-stock environment
  • Keep safety stocks
  • Huge financial
  • Shortage risk
  • Based on long-term forecast
  • PULL-BASED SUPPLY CHAIN STRATEGY
  • Production and distribution are demand-driven
    (they are coordinated with true customer demand
    rather than forecasted demand)
  • Make-to-order strategy
  • Keep no stock at all

PROPOSED SCM DESIGN
  • CHALLENGE
  • Identify the location where the strategy switched
    from Push-based to Pull-based (Push-Pull
    boundary)
  • HYBRID STRATEGY
  • Push and Pull are combined simultaneously
  • EFFECTS
  • Safety stock reduced by 40 to 60 for same lead
    time
  • Safety stock reduced by 30 for 50 lead time

CURRENT SCM DESIGN
6
How to read the diagrams ?
Fig. 3-11
7
Current safety stock
Objectives
8
1st strategy
Optimized safety stock cost
Lead time???
9
2nd strategy
Current situation Safety stock cost
74,100/yr Lead time 30 days
10
1st strategy VS 2nd strategy
11
MORE COMPLEX PRODUCT STRUCTURE
12
Supply Chain Strategy Before Optimization
Safety Stock
13
Supply Chain Strategy After Optimizing the
push-pull boundary
Safety Stock
14
Eleccomp Achievement
15
Trade-off between quoted lead time and safety
stock
Minimize cost
Minimize Lead time
16
Integrating Inventory Positioning and Network
Design
  • Product categories
  • High-variability-low-volume products
  • Low-variability-high-volume products
  • Low-variability-low-volume products

17
(No Transcript)
18
QUESTIONS TO BE DISCUSSED
19
Question No 1
NETWORK PLANNING
20
Example firms requirements for its logistics
network change over time
Inventory cost
Minimize commitment time to the next stage
manufacturingcost
Increasing demand on the same time
Transportation cost
Many demand on the different commitment time/
different order places
21
QUESTION NO. 2
  • In network design project, all executives have to
    be involved in order to yield comprehensive
    decision for deriving better supply chain
    performance.

Marketing, operation, sales, HR are involved
mainly in this part
22
Question number 6
  • Truck load (TL) transportation rate structure is
    asymmetric ??

23
Question number 8
Heuristic
Exact optimization
VS
24
THANK YOU