Title: PALM-3000 Management Update


1
PALM-3000 Management Update
  • Antonin Bouchez, Jenny Roberts
  • Team Meeting 7
  • 27 February, 2008

2
What are we building again?
  • Phase 0
  • Reconfigure current AO system for 2 new back-end
    instruments SWIFT and project 1640.
  • Phase 1
  • Develop and deploy an extreme NGS-AO system,
    with 1-2 years lead over competitive projects
    (GPI, Sphere).
  • Phase 2
  • Improved the LGS performance with an infrared
    tip/tilt sensor and visible truth wavefront
    sensor.

3
Recent Progress
  • Recent Milestones
  • Requirements review on 12 Nov. 2007.
  • AO system offline for maintenance starting 29
    Nov. 2007.
  • RTC procurement complete 14 Feb. 2008
  • Current Activities
  • Relayout of AO optical bench for P1640 and SWIFT
    (Roberts, Burruss, Bui)
  • On track for commissioning with PHARO on April 9.
  • High-order Wavefront Sensor design (Baranec)
  • Design in progress. Lab prototyping underway.
  • Real-time wavefront reconstructor computer design
    (Truong, Guiwits)
  • Procurement complete. Hardware integration
    underway.
  • Software architecture definition (Truong,
    Angione, Burruss, Cromer, Guiwits)
  • In progress.
  • Electronics design (Guiwits, Croner, Cromer)
  • In progress.
  • Instrument commissioning (Bouchez, Roberts,
    Burruss)
  • Planning. Interfacing with instrument teams.

3
4
Budget overview (P3K Phase 1 only)
5
Budget overview (P3K Phase 12)
6
FY08 budget (Caltech)
  • Caltech portion of budget
  • MRI COO support this FY 793,000 (including
    contingency)
  • As of end Jan., 64,000 (35) below budget
    profile.

7
FY08 budget (JPL)
  • JPL portion of budget
  • JPL support this FY 675,000 (including AO
    operations support)
  • As of end Jan., 5000 (3) above budget profile

8
Project Schedule (1)
9
Project Schedule (2)
10
Twiki site
  • Structure
  • IPT section Minutes and other meeting materials.
  • Project calendar Link to Google calendar.
  • IPT Leads should update meeting information.
  • Documentation section
  • Requirements, schedules, etc.
  • Technical Products Design documents.
  • Security
  • All pages currently visible to the public (could
    be changed).
  • Protect sensitive documents using PDF passwords.
  • Email lists
  • Use Technical Team list for general distribution.
  • IPT leads should post similar lists on IPT pages.

11
Accounts and procurements
  • Accounts divided by WBS category
  • Management, Systems Engineering.
  • Software, Electronics.
  • Optical Bench, DMs, Wavefront Sensors.
  • Commissioning.
  • Caltech accounts
  • OIR.P3K-task-NSF.MRI
  • COO.P3K-task-
  • Please charge COO account once it is available.
  • Procurements
  • Contact Marcia Brown for procurements, cc. PM.
  • Distribute original packing slip to Marcia, copy
    to PM.
  • IPT leads should keep track of procurement
    expenses.

12
Integration underway
Reconfigured optical bench