Possible NSTX Diagnostic Upgrades for FY09-13B.
Stratton 1/5/07
  • Assumes Poloidal-CHERS and High-k Scattering
    complete in FY08
  • Profile diagnostics
  • MPTS additional laser (60 90 Hz rep rate) FY09
  • (or upgrade two existing lasers to 50 Hz to
    get 100 Hz rep rate)
  • MPTS additional spatial channels (30 40
    channels) FY10
  • Additional MSE spatial channels FY09 FY10
  • Fast CHERS (1 ms time resolution) FY11 FY12
  • MSE-LIF FY09 FY10
  • Turbulence and transport diagnostics
  • Imaging reflectometer (low-k turbulence) FY09
    FY10
  • Add kq measurement to High-k Scattering system
    FY09 FY10
  • Impurity doping system (laser blow-off injector,
    TESPEL) FY11
  • Phase contrast imaging plus CO2 laser scattering
    FY09 FY10

2
Possible Diagnostic Upgrades for FY09-13 continued
  • Boundary Physics
  • Fast IR camera (30-100 kHz, periscope) FY09
    FY10
  • Horizontal divertor bolometer array (4 20
    channels) FY09
  • Vertical divertor bolometer FY09
  • Divertor Thomson Scattering FY11 FY12
  • Divertor visible and VUV spectroscopy FY11
  • Center stack and divertor probe arrays (20
    probes) FY13
  • Dimes Probe FY09
  • Energetic Particles
  • Neutron Collimator FY09 and FY10