Title: PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE


1
  • PRESENTATION ON THE DEVELOPMENT AND THE
    IMPLEMENTATION OF THE NEW GENERATION
    CORRECTIONAL FACILITY PROTOTYPES
  • Department of Correctional Services
  • 17 September 2002

2
1. THE OBJECTIVES
  • 1.1. STRATEGIC PLAN
  • 1.2. OPERATIONAL OBJECTIVES
  • 1.3. BUDGETARY OBJECTIVES

3
INTRODUCTION
  • The concepts utilized in the development of the
    New Generation prototype correctional facility
    have included
  • Unit Management
  • Direct Supervision
  • Communal Cells
  • The prototypes as developed were guided by the
    need to enhance the facilitys potential for
    rehabilitation while maintaining a high level of
    security by design

4
  • The concept as developed incorporate all the
    recognized standard for humane incarceration.
  • The designs reflect detailed space norms and
    standards incorporating recognized standards and
    local conditions
  • The design concepts have been developed
  • (a) To achieve low Life-Cycle-Costing
  • (b) To permit a variety of procurement methods
  • (c) To permit rapid expeditious construction
  • (d) To maintain a high level of security by
    design

5
1. THE OBJECTIVES
  • 1.1 STRATEGIC PLAN
  • 1.1.1. Reduction of overcrowding
  • 1.1.2. Introduction of Unit Management
  • 1.1.3. Reduction of Life- Cycle- Costs
  • 1.1.4. Enhancement of Rehabilitation
    Programmes

6
1. THE OBJECTIVES
  • 1.2 OPERATIONAL OBJECTIVES
  • 1.2.1. Development of Life-Cycle-Costing
    procedures
  • 1.2.2. Revised Business Procurement process
    which
  • reduce risks but enhance competition
  • 1.2.3. Revised criteria for prioritization of
    projects
  • 1.2.4. Revised criteria for creation of new
    facilities maintaining a high level of
    security by design
  • 1.2.5. Development of Master Plan for new
    renovated facilities

7
1. THE OBJECTIVES
  • 1.3 BUDGETARY OBJECTIVES
  • 1.3.1. Reduction of Capital Costs
  • 1.3.2. Reduction of Operating Maintenance
    Costs
  • 1.3.3. Modifications to MTEF Cycle Budget to
    reflect strategic objectives
  • 1.3.4 Implementation of Life-Cycle-Costing
    methodology to achieve all of the above and
    reduce risk associated with
  • construction

8
2. THE PROCUREMENT PROCESS
  • 2.1. DEVELOPMENT OF PROTOTYPE
    DESIGN
  • 2.2. UTILIZATION OF CONSTRUCTION
    MANAGEMENT

9
2. THE PROCUREMENT PROCESS
  • 2.1. KEY FEATURES OF THE
    THE PROTOTYPE DESIGN
  • 2.1.1. Standard designs with fee and
    construction cost savings through
    repetition.
  • 2.1.2. Establishing integrated and co-
    operative relationship with the Department
    of Public Works.
  • 2.1.3. Permitting the introduction of
    Construction Management to allow for options
    other than conventional construction
    methodologies while
  • reducing risk

10
2. THE PROCUREMENT PROCESS
  • 2.2 UTILISATION OF CONSTRUCTION
    MANAGEMENT
  • 2.2.1. Encouraging the participation by a
    wide variety of construction providers
  • 2.2.2. Permitting the utilisation of prisoner
    labour and products
  • 2.2.3. Significantly increase the purchasing
    power of current budget allocations
  • 2.2.4 Reducing the cost time risks
    associated with construction

11
3. THE PRODUCT
  • 3.1. Design Philosophy
  • 3.2. Design Layouts
  • 3.3. Costing and Estimating
  • 3.4. Partnership with the Department of
    Public Works

12
3. THE PRODUCT
  • 3.1.6. Support rehabilitation
  • 3.1.7. Appropriate Technology
  • 3.1.8. Potential for phased construction
    additions with minimum operational
    disturbances
  • 3.1.9 World Class design quality
  • 3.1.10 High level of security by design

13
3. THE PRODUCT
  • 3.1 DESIGN PHILOSOPHY
  • 3.1.1. Unit Management, New Generation
  • 3.1.2. Direct Supervision
  • 3.1.3. Communal Cell
  • 3.1.4. Kit-o-Parts concept
  • 3.1.5. Low-Life-Cycle cost

14
3. THE PRODUCT
  • 3.2 PROTOTYPE DESIGN
  • 3.2.1. The development of norms and
    standards
  • 3.2.2. The development of

15
The Zone