CM-SAF TOA radiation status report - PowerPoint PPT Presentation

About This Presentation
Title:

CM-SAF TOA radiation status report

Description:

High resolution: OK now. TOA fluxes: July and August coming soon... Definition of the grid: ... Better angular models, better spatial resolution. Still waiting for ! ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 15
Provided by: cmsa2
Category:

less

Transcript and Presenter's Notes

Title: CM-SAF TOA radiation status report


1
CM-SAF TOA radiation status report
  • D. Caprion
  • Royal Meteorological Institute of Belgium

2
Overview
  • Main problems since lastest meeting
  • Changes to operational chains
  • Status input products GERB
  • Status input products CERES

3
Main problems
  • Hardware problems beginning of September
  • Unfortunately check our backup system
  • Not so bad, not so good so need of improvements
    !
  • Consequences delays to deliver products
  • High resolution OK now
  • TOA fluxes July and August coming soon...
  • Definition of the grid
  • What kind of grid shall we have to use ?

4
Grid ?
  • What do we want ?
  • Equal-area grid with a resolution of
  • either (15 km)² or (45 km)²
  • Answer
  • Sinusoidal grid with 2N x N pixels
  • Tuning of N to get the resolution
  • But does it fully answer the requirements ?

5
Grid ?
  • Yes And no ? Why?
  • The Earth is an ellipsoid
  • What
    do we need fixed pixel
    location or fixed pixel size ?

6
Grid ?
  • In other words
  • What kind of implementation ?

DWD
RMIB
7
Grid ?
  • Consequences
  • DWD
  • Exact Equal-area grid but non-linear dependence
    of the latitude with the pixel index !
  • RMIB
  • Linear dependence of the latitude with pixel
    index but nearly Equal-area grid !
  • Open questions ?

8
Grid ?
  • Try and be a user
  • 1. Do I really need an exact Equal-area grid in
    which geolocation is not trivial ?
  • 2. Do I need an easy geolocation even if I lost
    the exact Equal-area property of my grid ?
  • 3. How do I manage to pass from the low
    resolution to the high resolution grid ? If not
    implemented in the same way !

9
Grid ?
  • From RMIB point of view
  • No definitive answer, except
  • It is always easier to use
  • lat 90-180y/N
  • lon(x-N)180/(Ncos(lat))
  • Than implement an elliptic integral needed to
    compute the fixed size of the pixels.
  • The user should easily go from one grid to the
    other one !!

10
Changes to operational chain
  • Implementation of three parallel chains
  • 1 mixed (GERB/GERB-like) chain current one
  • 1 pure GERB
  • 1 pure GERB-like
  • test on data from May 2005 to now

11
Changes to operational chain
GERB-like
GERB-like
GERB
GERB
Regridding
Regridding
Regridding

Averaging
Averaging
Averaging
Merge with CERES
Final products in HDF files
12
GERB status
  • Instrument currently in safe mode
  • Till mid-October (eclipse seasons)
  • Planned release beginning 2006
  • GIST meeting end of December 2005 to give
    official approval
  • Planned reprocessing as soon as possible
  • Preliminary tests on June and July 2004 seems to
    be positive.

13
CERES status
  • Currently used ES9, Terra, FM1, Edition 1
  • Available up to August 2005
  • More advanced SRBAVG
  • Better angular models, better spatial resolution
  • Still waiting for !
  • Decision beginning of November ?

14
Conclusions
  • Continue to check operational chains.
  • Should we change the grid ?!?
  • GERB data release planned for...
  • Beginning 2006
  • So reprocessing.....
Write a Comment
User Comments (0)
About PowerShow.com