... operation a vertical test cryostat system for high power testing of single 3. ... Goal: Design, procure components, assemble, and place into operation a ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 10
Provided by: Keph
Category:

less

Transcript and Presenter's Notes

Title: Technical Division SRF Development Department


1
Technical Division SRF Development Department
  • Giorgio Apollinari
  • Jan 9th, 2006

2
Motivations
  • Consolidate activities along major line of
    research, development, prototyping and
    construction in the Technical Division
  • RF Development
  • Magnets Development
  • Testing
  • Prepare the Division to cope with the expected
    synergy of future challenges
  • International Linear Collider, Proton Driver
  • LARP, sLHC
  • .

3
(No Transcript)
4
SRF Dep. - Mission Statement
  • Contribute to the advancement of conventional
    and superconducting Radio Frequency technology,
    from conceptualization through commissioning of
    components and assemblies, to be used in all
    aspects of beam acceleration, handling and
    detection. Work includes basic beam dynamic
    simulation, establishment of design requirements,
    engineering specifications, design and
    engineering to develop build-to-print packages
    for procurement, development of prototypes,
    definition of work process control procedures,
    development of inspection criteria and
    fabrication procedures, and providing fabrication
    and production oversight.
  • The departments efforts will include follow-up
    for completed devices such as support of testing
    and analysis of test data in order to measure,
    characterize and optimize the performance of RF
    devices, and support of the installation and
    commissioning of such devices. It will also
    include basic material research and development,
    including the establishment of reliable and
    repeatable chemical processing recipes and
    procedures to achieve desired RF cavity
    accelerating gradients.

5
Manpower
6
Supervisors
  • (High-Level) Supervisors
  • G.Apollinari
  • K.Swanson
  • P. Bauer
  • C. Cooper
  • N. Solyak
  • H. Carter
  • T. Nicol
  • T. Peterson

7
SRF Dep. - FY06 Tasks and Goals
  • International Linear Collider Tasks (H.C.)
  • ILC TD Project Management
  • 3.9 GHz Cryomodule
  • ILC b1 Cryomodule Americanization
  • ILC b1 Type IV Cryomodule Design
  • Horizontal Test Cryostat
  • Vertical Test Cryostat
  • Proton Driver Tasks (G.A.)
  • PD Beam Line Simulation
  • RFQ Procurement
  • RT Cavities Prototype(s)
  • Single Spoke Cavities Prototype(s)
  • .

8
ILC Example FY06 Tasks and Goals
  • Horizontal Test Cryostat (ILCTA-MDL)
  • Goal Design, procure components, assemble, and
    place into operation a horizontal test cryostat
    system (Chechia) capable of being used to
    conduct high power testing of single, dressed
    3.9GHz and 1.3GHz cavities
  • Task Manager T. Peterson
  • Task Engineer(s) M. Wong, V. Poloubotko (Mech.)
    / A. Lounine (RF) / R. Carcagno (LLRF)
  • Task Designer(s) V. Poloubotko / C. Reid
  • Task Scientific Input A.Hocker (Project
    Physicist) / O. Prokofiev (Applications
    Physicist)
  • Task Procurement P. Olderr / M. Steinke
  • Task Deliverable Complete horizontal test
    cryostat system
  • Vertical Test Cryostat (ILCTA-IB1)
  • Goal Design, procure components, assemble, and
    place into operation a vertical test cryostat
    system for high power testing of single 3.9GHz
    and 1.3GHz cavities
  • Task Manager(s) C. Sylvester / (T. Peterson )
  • Task Engineer(s) M. Wong (Mechanical) / A.
    Lounine (RF) / R. Carcagno (LLRF)
  • Task Designer C. Reid
  • Task Scientific Input C. Ginsburg (Project
    Physicist) / Oleg Prokofiev (Applications
    Physicist)
  • Task Procurement P. Olderr / M. Steinke
  • Task Deliverable Complete vertical test cryostat
    system

9
PD Example FY06 Tasks and Goals
  • Single Spoke Cavities
  • Goal simulate, design, procure and test at least
    1Single Spoke SC Cavity
  • Task Manager(s) G. Apollinari
  • Task Engineer G. Lanfranco / (T. Nicol)
  • Task Cav/Sol Integration T. Page
  • Task Designer F. McConologue
  • Task Scientific Input K.Shepard/ANL, I. Gonin
  • Task Procurement P. Olderr
  • Task Deliverable 1 Single Spoke SC Cavity
  • Deliverable Processing P. Bauer/C. Boffo
  • Deliverable Acceptance Test T. Khabibouline