Title: Parametric CAx Strategy
1Parametric CAx - Strategy
- ME 578
- Dr. C. Greg Jensen
- Assignment Find, copy, read and bring to next
lecture class a Journal article that deals with
Parametric Modeling
2Grand Vision
- Successful manufacturing companies are organizing
themselves around the notion of product families
3Grand Vision
- They use parametric methods to digitally model
their part and product families.
4Grand Vision
- Leverage discrete part or assembly models
- Through collaboration discrete models are widen
(made more general), deepen (made more specific),
and standardize throughout the corporation. - Not a replacement to existing parametrics but an
enhancement.
5ParaCAD Grand Vision
6ParaCAD Grand Vision
Parametric Routing Sheets
...
Parametric Components
Parametric Model
Optimizations Robust Design
Parametric Fixture Design
Parametric Analysis
7ParaCAD Grand Vision
Parametric Routing Sheets
...
Parametric Components
Parametric Model
Optimizations Robust Design
Parametric Fixture Design
Parametric Analysis
8Grand Vision
- Parametric CAx provides
- The ability to create robust product families
- The speed and power to do optimized product
family customization - The ability to expand into other markets and
grow overall market share - A framework for the enterprise and their value
chain suppliers
9Costs
- Training
- Software Procurement
- Software Development
- Longer Setup Times
- Modeling
- Analysis
- Detailing
- Manufacturing
- Process Planning
- Costing
- Assembly
- Inspection
- Re-engineering the Organization
- Documentation
- Model and Process Certification
- Hardware Procurement
-
10Benefits Associated with ParaCAD
- Geometry in Seconds
- Concurrent Engineering
- Framework for Robust Design
- Framework for Optimization
- Basis for KBE
- Better Configuration Control
- Framework for Product Data Mining
- Engineering Artifacts are Automatic
11Estimating ParaCAD Costs/Benefits
- Discovery-driven planning (R. G. McGrath and I.C.
MacMillan) - Little is known and much is assumed
- Assumptions (best-guess estimates) must be tested
and questioned - Assumptions are systematically transformed to
knowledge, and - The real potential of the venture is discovered
as the knowledge unfolds
12Estimating Cost/Benefit Ratio
- Discovery-driven planning (DDP)
13Estimating Cost/Benefit Ratio
- Reverse Benefits Statement
14Estimating Cost/Benefit Ratio
The goal is to determine the value of success
quickly.
- Reverse Benefits Statement
15Estimating Cost/Benefit Ratio
- Pro Forma Operation Specification
16Estimating Cost/Benefit Ratio
Identifying the Costs associated with parametrics
- Pro Forma Operation Specification
17Estimating Cost/Benefit Ratio
- Assumption Checklist
- 1. 25 preliminary design/analysis/manufacturing
iterations - 2. Time saved on each design/analysis/manufacturin
g iteration will average 160 hours - 3. Average labor rate is 50/hour
- .
- .
- .
- 21. Creation of parametric master model will take
40 hours longer - 22. Labor rate for a parametric modeler is
60/hour - 23. Creation of parametric analysis will take 60
hours longer - 24. Labor rate for a parametric analysis is
100/hours - .
- .
- .
18Estimating Cost/Benefit Ratio
19Estimating Cost/Benefit Ratio
Identifying implicit assumptions allows a
company to test their validity.
20Estimating Cost/Benefit Ratio
The parametric project begins based on the merits
of its business case
21Estimating ParaCAD Costs/Benefits
- Revised Reverse Benefit Statement
- With better knowledge the reverse cost/benefit
statement is revisited and updated
22Estimating ParaCAD Costs/Benefits
Does the parametric project still make sense?
- Revised Reverse Benefit Statement
- With better knowledge the reverse cost/benefit
statement is revisited and updated
23Estimating ParaCAD Costs/Benefits
- Test Assumptions at Milestones
- Parametric project schedules list all major
activities - Traditional milestones exist for all major events
- Superimposed on the project schedule are
assumption milestones - If the assumption is correct or reasonable it is
deemed knowledge and the project continues, else
one loops back to the beginning of DDP
24Estimating ParaCAD Costs/Benefits
Transforming assumptions to Knowledge.
- Test Assumptions at Milestones
- Parametric project schedules list all major
activities - Traditional milestones exist for all major events
- Superimposed on the project schedule are
assumption milestones - If the assumption is correct or reasonable it is
deemed knowledge and the project continues, else
one loops back to the beginning of DDP
25Benefits - Flat Belt and Sheave
Analysis Coupled Optimization
Geometry Coupled Optimization
Design Linkage
Simulation
First Principles
4Q00
2Q00
3Q00
4Q99
1Q00
2Q99
3Q99
1Q99
FEA Simulation 3 days/case workstation
Coupled Optimization 2 min/system
Parameter-Based Design 3 min/case
Empirical design-by-test
First Principles Model lt1 sec/case on PC