Hall C off, Wien 76'2 deg' - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Hall C off, Wien 76'2 deg'

Description:

If G0 doesn't initially require PQB or maximum polarization then scenario ... Wien change w/ injector setup (4 hours) followed by PQB Hall C setup (8 hours) ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 2
Provided by: josephm67
Category:
Tags: deg | hall | setup | wien

less

Transcript and Presenter's Notes

Title: Hall C off, Wien 76'2 deg'


1
Hall C off, Wien 76.2 deg.
Hall C on, Wien 75.6 deg.
Final, Wien 92.4 deg.
If G0 doesnt initially require PQB or maximum
polarization then scenario seems plausible.
If halls A B delay going to 5 3 pass around
Monday 3/20 then subsequent Wien change w/
injector setup (4 hours) followed by PQB Hall C
setup (8 hours).
Write a Comment
User Comments (0)
About PowerShow.com