Title: CBM Calorimeter system
1CBM Calorimeter system
I.Korolko (ITEP, Moscow)
2Outline
3SR Occupancy (24 K channels)
Occupancies are VERY high ! 1. SR thresholds
50, 60, 80 MeV 2. 10 MeV thresholds 40-50
occ. Do we need very high energy resolution ?
1. HEP experience NO 2. ALICE example YES
And it is much more interesting to build such a
good calorimeter Usual shashlik technology
exists already
4SR e-p separation
1. Compare track momentum with CALO energy
Use 2x2 matrix to minimize pile-up from
neighbors Most simple approach improvements
possible
2. Shower shape (2x2 / 3x3 ratio)
Gives additional factor 2 Rather simple approach
improvements possible
3. Preshower
Gives additional factor 2-3 (with 95 electron
efficiency) For rough sampling ECAL could
perform better
5SR Preshower
SR cut 2 MIPs
obviously could be increased with some loss of
electron eff.
SR width - 1.5 X0
Very fine ECAL sampling limits the possible width
of Preshower absorber
6SR e-p separation results
Depends on local occupancy Averaging over all
ECAL regions less than 5 GeV/c 50
5-10 GeV/c 200 greater than
10 GeV/c gt300
7Simulations
1. Standalone program working with 109 volumes
used for SR simulations will be used in the
nearest future (3-4-5 months) very fast 2minutes
/ central event with low GEANT thresholds
2. Migration to cbmroot
geometry and hit production Yuri Kharlov SR
algorithms nearest month
8Small exercises
Repeat SR simulations with rough sampling
almost the same results for e-pi separation
Repeat SR simulations with less CALO cells
worse results for e-pi separation (still in
progress)
9smaller Calorimeter
1. Reduce CALO acceptance
- Outer acceptance
- Inner acceptance
2. Make it rougher (number of plates)
3. Look for cheap photo-detectors (lower gain)
4. Reduce number of channels
- lateral granularity
- longitudinal granularity (Preshower)
10Outer acceptance
- electrons from J/? decays
- Pt gt 1 GeV/c
- Strong dependence -
- Small number of cells -
- Mostly high Pt particles -
- Worse e-pi separation
- Saving material, not money
11Inner acceptance