Description:

Update of GLD Experimental Hall. H.Yamaoka. 19 August 2005, SNOWMASS ... GLD Detector Position at beam line and at the end of assembling. 12m ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 7
Provided by: Yama45
Category:

less

Transcript and Presenter's Notes

Title: Update of GLD Experimental Hall


1
Update of GLD Experimental Hall
  • H.Yamaoka
  • 19 August 2005, SNOWMASS

2
Original experimental hall before Snowmass for
GLD
To be shortened.
3
New proposal for smaller experimental hall
Solenoid at installation
shortened
Iron yokes are open at installation.
Solenoid
4
GLD Detector Position at beam line and at the end
of assembling
5
Opening operation of the end iron yoke
The yoke is opened by rotation.
Normal position
12m
GLD is moved along the beam line for access
inside it.
Two yokes are opened.
6
Installation of the BELLE solenoid at KEKB
The Solenoid is installed on the rails which are
set on the Iron yoke.
rail
Support