Cost versus Structure Length - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Cost versus Structure Length

Description:

And used structure / rf system costs from John C. ... Noted by Nobu Toge at May 2002 NLC MAC meeting. 50 MW. 50 MW. 75 MW. 75 MW. Structure length (cm) ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 2
Provided by: Tor159
Category:

less

Transcript and Presenter's Notes

Title: Cost versus Structure Length


1
Cost versus Structure Length
Optimal structure length may not be the one that
makes gt70 MW/m Noted by Nobu Toge at May 2002 NLC
MAC meeting
Fix input power per structure at 50 MW or 75
MW And used structure / rf system costs from John
C.
75 MW
50 MW
75 MW
50 MW
50 MW
75 MW
Structure length (cm)
Write a Comment
User Comments (0)
About PowerShow.com