CS 194 Research Checkpoint - PowerPoint PPT Presentation

About This Presentation
Title:

CS 194 Research Checkpoint

Description:

Network communication latency modeler functional but disconnected in simulator. Next Steps. Tie the network latency modeler into the simulator. ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 7
Provided by: salz9
Learn more at: http://web.cs.ucla.edu
Category:

less

Transcript and Presenter's Notes

Title: CS 194 Research Checkpoint


1
CS 194 Research Checkpoint
  • Paul Salzman
  • Advisor Professor Glenn Reinman
  • Winter 2007

2
Outline
  • Proposed Checkpoint Goals
  • Current Accomplishments
  • Difficulties
  • Next Steps

3
Proposed Checkpoint Goals
  • Develop a simulator using SESC with MINT
  • 4-8 weeks
  • Create various workloads for the simulated
    architecture
  • 1-2 weeks

4
Accomplishments
  • Heterogeneous Cores up and running.
  • Network latency modeling on its way.
  • Still in the process of developing a simulator
    using SESC with MINT

5
Difficulties
  • Lack of up to date simulator documentation.
  • Network communication latency modeler functional
    but disconnected in simulator.

6
Next Steps
  • Tie the network latency modeler into the
    simulator.
  • Create various workloads for the simulated
    architecture
  • 1-2 weeks
  • Analyze performance to determine how different
    resource allocations can be applied.
  • 8 weeks
Write a Comment
User Comments (0)
About PowerShow.com