Title: BUILDING STRONGSM


1
Society of American Military Engineers and U.S.
Army Corps of Engineers, Little Rock
District 2009 SAME Symposium Little Rock
Districts FY09 Workload Mark
Milholland Chief, Programs and Project Management
Div April 28 29, 2009
BUILDING STRONGSM
2
  • Agenda
  • (Overview of Little Rock District Projected Work)
  • FY09 Stimulus Types of Work
  • FY09 Supplemental Funded Projects
  • FY09 MILCON Projects
  • FY09 Support for Others Projects (VA)
  • FY09 Civil Works Projects (GI and CAP)
  • FY09 OM Projects (CW)
  • Questions and Answers

BUILDING STRONGSM
3
BUILDING STRONGSM
4
FY09 Economic Stimulus
  • Dept of Defense (Civil)
  • Dept of the Army
  • Corps of Engineers
  • 4.6B will be provided to USACE
  • Specific criteria in allocation of funds
  • Usage of funds
  • Investigations
  • Construction
  • MS River and Tributaries
  • OM
  • Regulatory
  • Remedial Action Program
  • Flood Control/Costal Emergencies

BUILDING STRONGSM
5
FY09 Economic Stimulus
  • SWL is assessing the entire program to identify
    projects that
  • could qualify for the stimulus
  • Projects to be obligated/executed quickly
  • Projects that can be executed with little
    schedule risk
  • Projects that will result in high/immediate
    employment
  • Projects that will complete either a project
    phase or
  • the project

BUILDING STRONGSM
6
FY09 Supplemental Funded Projects
  • Project (and Location)
    Advertise Cost
  • Date Range
  • Park Repairs _at_ Various Locations 3rd/4th Qtr
    cost varies
  • Trash Rack _at_ Nimrod Lake 4th Qtr 100k -
    250k
  • Trash Rack Debris Removal _at_ Ozark 3rd Qtr
    up to 100k
  • Emergency Pump Station _at_ Dardanelle 3rd Qtr
    250k - 500k
  • Repairs of Office Building, Table Rock 3rd
    Qtr up to 100k
  • AR-White/Jim Smith Repairs 3rd Qtr
    1M - 5M

BUILDING STRONGSM
7
FY09 MILCON Projects
Project
Location Advertise Date Cost
Range AD/AL Fitness Center Goodfellow AFB
3rd Qtr 5M-10M
Student Activity Ctr/Lib Laughlin AFB
3rd Qtr 5M-10M MATOC
Ft. Polk 3rd Qtr
up to 125M Education Center LRAFB
3rd Qtr over 10M (Bomb
Storage Infra Pine Bluff Arsenal 1st
Qtr of FY10 over 10M) (Flight
Simulator Add LRAFB 1st Qtr of
FY10 5M-10M)
BUILDING STRONGSM
8
FY09 Civil Works and Support for Others
  • Civil Works
  • Project Location
    Advertise Cost Date
    Range
  • Grassy Lake Ecosystem (A-E) 4th Qtr up
    to 50k
  • Highway 58, Guion, AR 4th Qtr 500k - 1M

Support for Others Project
Location
Advertise Cost Date
Range VA MATCO (Design-Build) AR,
TX, OK MS 4th Qtr up to 350M
BUILDING STRONGSM
9
FY09 OM Projects
Project Location
Advertise Cost
Date Range Hardin Void Investigation (Core
Drilling) 3rd Qtr up to 500k MCC
Panels Locks 4, 5 and 6 3rd Qtr
up to 500k Paint/Rehab Tainter Gates _at_
Murray Lock 7 2nd Qtr 1M -
5M Replacement of Bulkhead Structure, Greers
Ferry 2nd Qtr 1M - 5M Rehab/Paint
Bridge Superstructure, Bull Shoals 3rd Qtr
1M - 5M Stop Logs and Lifting Beams,
MKARNS 3rd Qtr 100k-250k Construct
Intake System, Clearwater Lake 3rd Qtr
100k-250k MCC Panels Lock 12 (Ozark-Jeta
Taylor) 3rd Qtr
100k-250k Various Mowing and Landscape
Service 3rd/4th Qtr 250k -1M Various Park
Cleanup and Attendant Services 3rd/4th Qtr
250k -1M Various Janitorial Services 3rd/4th
Qtr 250k -1M Emergency Generator, Ozark 4th
Qtr 5M - 10M
BUILDING STRONGSM