Giorgio Apollinari - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Giorgio Apollinari

Description:

Expected Deliverables from Construction phase. Major Commissioning Deliverables ... Completion of back-CSCs and Cables Installation on YE-2 disk by Apr. '03 ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 12
Provided by: richardl96
Category:

less

Transcript and Presenter's Notes

Title: Giorgio Apollinari


1
MO PhaseFiles Plans
  • Giorgio Apollinari
  • UCLA EMU Meeting
  • 9th January, 2003

2
MO PhaseManagement Structure
  • Commissioning
  • Commissioning of most of the EMU system will be
    funded in the US by the MO Phase (Maintenance
    Operation) and take place between CY03 and CY09.
  • US CMS, IHEP China and PNPI Russia will share
    responsibilities for the commissioning of the
    ME2, ME3 and ME1/2-ME1/3 system commissioning.
    Dubna Russia will be responsible for the
    commissioning of the ME1/1 system.
  • The MO Management team in the US-PNPI-IHEP
    Collaboration is structured along the lines shown
    on the side.

3
MO PhaseDescription Scope of Work
  • Commissioning Structure
  • CSC Commissioning/Maintenance
  • FEE Commissioning/Maintenance Integration
  • DAQ Interface, Slice Test and On-line Database
  • DCS Controls
  • Alignment, Calibration Off-line Database
  • EMU Commissioning Scope of Work
  • Expected Deliverables from Construction phase
  • Major Commissioning Deliverables
  • Major Milestones
  • File available in
  • http//tdserver1.fnal.gov/uscmsemu/MO/MO_Guidel
    ines_Final.doc

4
CSC Commissioning
  • (Some of the) CSC Commissioning Goals
  • Maintain and Repair CSCs on Disk
  • Define Procedures for Gas and Cooling Water
    operations on installed CSCs
  • Define Procedures for HV/LV operations and apply
    HV/LV to CSCs
  • Portable HV/LV initially.
  • Test of CSCs mounted on Disks.
  • Portable DAQ initially (check for signs of life),
    Slice Test DAQ,
  • Software for HV/LV Firmware.
  • Setup CSCs repair procedures.
  • Maintain Chamber/Cables Databases
  • Establish and Maintain stock and spare mechanical
    parts at CERN.
  • (Some of the) CSC Commissioning Milestones
  • Minimal Testing of CSCs on disk (Start) 3/1/03
  • Final HV to CSCs on disk 6/1/05
  • On-line CSCs Monitoring (Programs
    Available) 6/1/04
  • Joined UCLA (4 FTE) Purdue (3 FTE) Team with
    later addition from UF for CSC Monitoring

5
FEE Commissioning
  • (Some of the) FEE Commissioning Goals
  • Develop power on/off Procedures
  • Address System integration issues on disk (common
    noise, gourd loops, etc.)
  • Most critical part of FEE commissioning
  • Determine optimal AFEB thresholds, CFEB
    triggering primitive thresholds and trigger mode
  • Develop methods to time in electronics and
    determine optimal timing constants
  • Benefiting from cosmic m passing through CSCs
  • Develop various procedures and monitoring systems
    to monitor and diagnose AFEB, CFEB, ALCT, etc.
    defining parameters and standards of operations.

6
MO Files
  • MS Project File
  • http//tdserver1.fnal.gov/uscmsemu/MO/emu_mo_new_
    2002_draft4.mpp
  • Microsoft Project 2000, will save also Project
    98 version
  • File under PO consideration
  • General philosophy described in MO_Planning.doc
    (same URL)
  • NOTA BENE
  • Due to the Continuing Resolution and the
    not-yet-approved Federal Budget,
  • no MO fund is available at this time

7
MO Funding (1)
  • Manpower and MS Cost Estimate and Funding
  • High-level, Institutional Memory manpower funding
    (Engineers) allocated explicitly to EMU
    Institutions
  • Funding for Foreign Collaborators allocated in
    agreement with signed MOUs
  • Signed MOU with PNPI US MO to cover for cost of
    one technician and car at CERN. PNPI will provide
    3 additional technicians as contribution to the
    MO phase (300 k)
  • Expected base of negotiations US MO supporting
    car at CERN for IHEP Visitors. IHEP to provide 2
    technicians as contribution to the MO phase
    (100 k)
  • Low-level, technical support manpower funding
    (technicians, riggers, drafters) concentrated in
    the hands of the L2 MO Manager and maintained in
    two accounts at CERN and FNAL.
  • MS funding treated similarly (funds in two
    accounts at CERN and FNAL under L2 MO Manager
    responsibility).
  • Lower level justification for MS and technical
    manpower funding is provided in the MO Project
    files.
  • Funding for several Software Engineers needed
    during the MO phase will be maintained at CERN
    as well to provide uniformity of quality and
    hiring practices, maybe through the CERN
    Computing Division.
  • No major repair facility at CERN, at least until
    PNPI factory is operational. Similarly, no
    allocation of long-time Cosmic Stand in US.

8
MO Funding (2)
  • Total MO EMU Funding 11.1 M
  • Institutional Manpower 3.8 M
  • FNAL MS 3.0 M
  • CERN MS 4.3 M

9
MO Funding (3)
10
MO Funding (4)
11
CSC Commissioning
  • Possible CY03 Working scenario
  • Completion of back-CSCs and Cables Installation
    on YE-2 disk by Apr. 03
  • Water and Gas to CSCs by May-June 03
  • Access to EMU Commissioning group (distinct from
    the EMU Installation group) to CSCs on disk by
    July-August 03
  • Initial testing will look only for signs-of-life
    from FEE and CSCs (1-2days/CSC initially, with
    probably a rather long learning curve for the
    first 2-3 CSCs)
  • Manpower Approach
  • Maintain Commissioning and Installation crew
    initially separate
  • Provide separate set of tools (diagnostic, DAQ
    systems, etc.) to the two teams
  • Merge the two teams as Installation work and
    Parts Handling at ISR winds down
  • Commissioning team
  • UCLA FAST Site Personnel M.Ignatenko
  • Purdue Personnel A.Bujak
  • PNPI and IHEP Collaborators TBD
  • Repairs
  • (Difficult) CSCs repair contracted to PNPI
    assembly factory
  • (Difficult) FEE repairs performed at US Home
    Institution
Write a Comment
User Comments (0)
About PowerShow.com