Baltic Electricity MiniFora - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Baltic Electricity MiniFora

Description:

During the regulatory period will take a place only tariff correction by the formula: ... Grid Code allow: Our TSO use 100% project based connection fees. Thank You ! ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 15
Provided by: energyre
Category:

less

Transcript and Presenter's Notes

Title: Baltic Electricity MiniFora


1
Baltic Electricity Mini-Fora Transmission
tariffs, connection rules
Meeting in Riga, Latvia 3th July 2006
Klarika Siegel Chief expert Estonian Energy
Market Inspectorate
2
  • Network tariffs regulated by Electricity Market
    Act (EMA)
  • According to the EMA EMI must approve the
    network tariffs

3
  • By EMA the EMI shall prepare and publish uniform
    methods for the calculation of justified network
    charges specified in clauses 71 (1) 3)-5) of EMA
    based on the weighted average capital cost

4
Clauses 71 (1) 3)-5) of EMA
  • network charges shall be transparent and in
    compliance with the principle of equal treatment.
  • ensuring security of supply and efficiency shall
    be taken into account.
  • the size of network charges shall enable network
    operators to perform the obligations arising from
    legislation and the conditions of the activity
    licence and to ensure justified profitability of
    the invested capital.

5
  • In TSO tariff regulation EMI uses RPI-X
    methodology
  • Regulatory period is 3 years
  • Now going the 2-nd year of regulation

6
For regulatory period (3 y) we approve
  • Depreciation (capital expenditure)
  • Reasonable profit
  • Variable costs (network losses )
  • Fixed costs
  • Uncontrollable

7
Example
8
  • During the regulatory period will take a place
    only tariff correction by the formula
  • Price year1 Correction coefficient x price year0

9
Correction coefficient
  •  Revenue year1
  • variable costs uncontrollable costs fixed
    costs0 x (RPI- X) capital expenditure1
    reasonable profit1
  •  
  •  
  •  
  •  
  •  
  •  
  •  

10
Approved tariffs for TSO
11
  • Connection principles are regulated by EMA
    through Grid Code

12
Grid Code allow
  • project based
  • average cost based
  • calculation of connection fees

13
  • Our TSO use 100 project based connection fees

14
  • Thank You !
Write a Comment
User Comments (0)
About PowerShow.com