RFE Oil - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

RFE Oil

Description:

Piltun-Astokhskoye, primarily an oil field with associated gas and Lunskoye, a ... Phase 1 focused on oil development and went into seasonal production during the ... – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 18
Provided by: andreyl
Category:

less

Transcript and Presenter's Notes

Title: RFE Oil


1
RFE Oil Gas Projects
Andrey Vasenev BISNIS
Representative, US
Department of Commerce
2
(No Transcript)
3
Sakhalin -1
  • www.sakhalin1.ru
  • Three offshore fields Chayvo, Odoptu, and
    Arkutun Dagi.
  • Potential recoverable resources are 2.3 billion
    barrels oil and 17.1 trillion cubic feet of gas.
  • One of the largest single foreign direct
    investments in Russia. Capital investment over
    the life of the project could reach as much as
    US12 billion.
  • The initial phase develops the Chayvo field with
    production start-up targeted for the
    3Q2005

4
Sakhalin-1 (continued)
  • The Chayvo field - both offshore and onshore
    facilities.
  • Yastreb land rig - constructed in 2002
    Extended Reach Drilling (ERD) technology five
    ERD wells have been drilled to-date.
  • Orlan offshore platform, operated year-round.
  • Processing at the Chayvo Onshore Processing
    Facility (OPF).
  • Installation of Orlan at Chayvo is scheduled for
    summer 2005.
  • Onshore Processing Facility will produce at the
    rate of approximately 250,000 barrels of oil and
    800 million cubic feet of gas per day.
  • The pipeline construction from the Chayvo OPF to
    the DeKastri export terminal on the Russian
    mainland to be completed at the end of 2005.

5
Sakhalin-1 Phase 1 Facilities
www.sakhalin1.ru
6
Sakhalin-2
  • www.sakhalinenergy.com
  • Piltun-Astokhskoye, primarily an oil field with
    associated gas and Lunskoye, a gas field with
    associated condensate and an oil rim (both fields
    contain over 1 billion barrels of oil and 18
    trillion cubic feet of gas.
  • Phase 1 focused on oil development and went into
    seasonal production during the summer period in
    1999 at the Vityaz Production Complex. Currently
    limited to the ice-free period about 180 days.
  • Phase 2 is an integrated oil and gas development
    that will allow year-round oil and gas
    production. It will involve a further investment
    of approximately US10 billion.
  • Currently under construction pipelines LNG
    plant

7
Sakhalin 4, 5
  • In 1998 the Alliance between JSC NC Rosneft
    (25.5) and PJSC NC Rosneft - Sakhalinmorneftegas
    (25.5) and BP (49) under Sakhalin V was formed.
  • In 2001 Sakhalin IV went under the Agreement on
    the Alliance between JSC NC Rosneft/PJSC NC
    Rosneft - Sakhalinmorneftegas and BP.
  • Blocks - Sakhalin IV
  • Zapadno-Shmidtovsky
  • Sakhalin V
  • Vostochno-Shmidtovsky, Kaygansko-Vasyukansky
  • Estimated reserves

8
Sakhalin Market Access
  • Visit the region
  • Difficulties finding personnel/distributors
  • Office space
  • Trade missions
  • Popular trade events
  • www.sakhexpo.ru
  • www.ibcenergy.com/sakhalin  
  • www.paccomexpo.com

9
Khabarovsk Krai
  • Construction of an oil-loading terminal in
    De-Kastri (12.5 million tons per year)
  • Sakhalin-Khabarovsk gas pipeline
  • Delivery of natural gas to the Krai under the
    Sakhalin-1 project.
  • Contact
  • KHABAROVSK KRAI GOVERNMENT
  • DIVISION OF GASIFICATION AND IMPLEMENTATION OF
    OIL GAS PROJECTS
  • 56 Karl Marx Street KHV 680000
  • Tel (7 4212) 328 706
  • Fax (7 4212) 306 935 or 325 040
  • Email pilguy_at_adm.khv.ru
  • Valeriy D. Pilguy, Head of the Division

10
Yakutiya
  • export-oriented East Siberia oil delivery project
  • exploitation of Chayandinskoye oil and gas
    condensate field
  • start up of oil processing facilities in the
    Western Yakutiya

11
Development of Chayandinskoye Oil Gas
Condensing Deposit
  • Project Description
  • The project envisions development of
    Chayandinskoye oil gas condensing deposit, gas
    transportation to the export gas main and its
    export. Chayandinskoye deposit alone accounts for
    more than half of all oil gas reserves
    prospected in Sakha Republic (Yakutia).
  • Product residue gas, crude oil, condensate,
    ethane, propane, butane, helium
  • Consumer Market Russian Eastern Siberia and Far
    East, and PRC, primarily China, South Korea and
    Japan
  • Project Cost 4,060 million
  • Requested Investment Volume 4,060 million
  • Form of Investments capital investments
  • Debit Items
  • drilling - 558.7 million
  • field facilities construction - 2,811 million
  • Chayanda-Talakan pipeline - 576.5 million
  • gas processing plant - 110.3 million
  • Implementation Term 50 years
  • Viability Period 11.5 years
  • IRR 19.4
  • Contact
  • Ministry of Industry of Sakha (Yakutiya) Republic
  • Aleksey Struchkov, Minister
  • 12 Kirov Street
  • Yakutsk 677000, Russia
  • Tel (7 4112) 420 269
  • Fax (7 4112) 420 283
  • E-mail minprom_at_optilink.ru, minpromsakha_at_mail.ru

12
Production of Synthetic Fuels from Natural Gas in
Yakutsk
  • Project Description
  • The project envisions construction of a synthetic
    fuels plant to produce petrol and diesel fuel in
    Yakutsk. Sakha (Yakutiya) Republic yearly
    imports about one million of light oil products
    from other regions of Russia. However, Yakutiya
    disposes of enough hydrocarbon reserves to
    produce its own oil products. The plant will
    operate on reserves from Vilyuisky gas condensing
    deposits.
  • Project assessment
  • Project Cost 244.8 million
  • Requested Investment Volume 108.8 million
  • Form of Investmentsjoint venturelong-term loan
  • Debit Items
  • capital investments
  • working capital
  • annual running costs
  • Implementation Term 20 years
  • Viability Period 6.4 years
  • IRR 31.7
  • Form of Investment Return individual agreement
  • Contact
  • Ministry of Industry of Sakha Republic
  • Aleksey Struchkov, Minister
  • 12 Kirov Street
  • Yakutsk 677000, Russia
  • Tel (7 4112) 420 269
  • Fax (7 4112) 420 283
  • E-mail minprom_at_optilink.ru, minpromsakha_at_mail.ru

13
Magadan Oblast Projects
  • Exploration and development of oil gas deposits
    offshore the Sea of Okhotsk Magadan-1 and
    Magadan-2 Leasing Areas
  • Brief description exploration and development of
    hydrocarbons on a lease sale basis and in
    compliance with Russian Tax Law. The entire
    project area is 30,200 sq. km the assessed
    hydrocarbons reserves are 2.65 billion tons
    hosted in 29 trap structures. The proposed
    project life span is 50 years. The leasing areas
    are included in the Lease Program of the Ministry
    of Natural Resources each site is divided into
    two blocks subject to licensing.
  • The area shelf areas of the Sea of Okhotsk
    contiguous to Magadan Oblast
  • The total cost 80.0 billion (expert judgment)
  • Requested investments 20.0 billion (expert
    judgment)
  • Exploration and development of oil gas fields
    offshore the Sea of Okhotsk Magadan-3 and
    Magadan-4 Tracts
  • Brief description exploration and development of
    hydrocarbons on a lease sale basis and in
    compliance with the Russian Tax Law. The entire
    project area is 26,400 sq. km the assessed
    hydrocarbons reserves are 2.3 billion tons hosted
    in 16 trap structures. The suggested project life
    span is 50 years. The leasing areas are included
    in the Lease Program of the Ministry of Natural
    Resources each site is divided into two blocks
    subject to licensing.
  • The area shelf areas of the Sea of Okhotsk
    contiguous to Magadan Oblast
  • Total cost 70 billion (expert judgment)
  • Requested investments 17.0 billion (expert
    judgment)

14
Magadan Oblast Contacts
  • The Department for Minerals Management of Magadan
    Oblast Administration
  • 14 Proletarskaya Street
  • Magadan, Russia 685000
  • Aleksandr Nevolin, Director of the Department
  • Tel (7 413-22) 9-71-91
  • Fax (7 413-22) 2-49-11
  • E-mail nedra_at_regadm.magadan.ru
  •  
  • Magadan Territorial Agency for Minerals
    Management
  • 11 Proletarskaya Street
  • Magadan, Russia 685000
  • Vyacheslav Kobets, Head of the Agency
  • Tel (7 413-22) 9-96-10
  • Fax (7 413-22) 2-20-90
  • E-mail kpr_at_mfgi.magadan.ru
  • geolcom_at_online.magadan.su

15
Amurskaya Oblast Extending Oil Main to China
  • Transneft JSC and the Chinese National Power
    Corporation (CNPC) developed a project on
    construction of Skovorodino Chinas border oil
    pipeline.
  • The pipeline will be an offshoot of the Eastern
    Siberia Pacific Ocean oil main.
  • The pipe length from Skovorodino to Zhalingda
    Settlement (China) will total 65-82 kilometers.
  • The initial oil supplies to China will vary
    within 15 million tons a year
  • Supplies will double once the oil pipeline is
    finalized.
  • Construction period - about 20 months,
  • In 2005, China consumed 341 million tons of oil
    that was 9 percent of the world oil consumption.
    Russia and Kazakhstans share in oil supplies to
    China did not exceed 12 percent

16
RFE Gasification Program
  • Development of the unified system for production,
    transportation and distribution of gas in the RFE
    and Eastern Siberia with a potential outlet to
    Pacific Rim Countries.
  • Overall reserves of gas in Eastern Siberia and
    the RFE are estimated at 64 trillion cub. m. (27
    of Russias total).
  • completion of the Okha Komsomolsk-on-Amure
    Khabarovsk gas pipeline and its extension up to
    Vladivostok (Primorskiy Krai).
  • RFE gasification program envisions
  • - development of six large deposits,
  • - construction of over 5,600 thousand
    kilometers of pipelines,
  • - 17 compressor stations with the total capacity
    of 980 MVt,
  • - gas processing plant and two helium storage
    facilities as well as three underground gas
    storage facilities.

17
RFE Gasification Program - continued
  • Eight oil and gas projects are implemented today
    under federal and regional target programs in the
    Russian Far East.
  • Fifteen structures are currently being
    constructed under these projects.
  • - The construction of the third line of the
    Sredneveluiskoye gas condensate deposit -
    MastakhBergeYakutsk trunk pipeline (Yakutiya)
  • - Development of Zapadno-Ozernoye Gas Deposit
    (Chukotskiy Autonomous Region)
  • - Komsomolsk-Khabarovsk Gas Pipeline