Job sequencing on 3 machines. - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Job sequencing on 3 machines.

Description:

Two conditions for a easy solution: ... One of the conditions is met. Example: 3 machines. Duration (hrs.) Job Mach 1 2 Mach 2 3 ... – PowerPoint PPT presentation

Number of Views:476
Avg rating:3.0/5.0
Slides: 17
Provided by: annk3
Category:

less

Transcript and Presenter's Notes

Title: Job sequencing on 3 machines.


1
Job sequencing on 3 machines.
  • Two conditions for a easy solution
  • 1. The smallest duration on machine 1 is at
    least as great as the largest duration on machine
    2.
  • 2. The smallest duration on machine 3 is at
    least as great as the largest duration on machine
    2.

2
Conditions for an easy solution
  • T1,smallest gt T2,largest
  • AND/OR
  • T3,smallest gt T2,largest

3
The easy solution how-to...
  • Add T1 T2 T2 T3
  • Use these sums to do Johnsons rule.

4
Example 3 machines
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

5
Example 3 machines
One of the conditions is met.
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • A 13 5 9
  • B 5 3 7
  • C 6 4 5
  • D 7 2 6

6
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • A 135 59
  • B 53 37
  • C 64 45
  • D 72 26

7
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • A 18 14
  • B 8 10
  • C 10 9
  • D 9 8

8
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • A 18 14
  • B 8 10
  • C 10 9
  • D 9 8

B goes first.
9
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • B 8 10
  • A 18 14
  • C 10 9
  • D 9 8

D goes last.
10
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • B 8 10
  • A 18 14
  • C 10 9
  • D 9 8

C goes next-to-last.
11
Example 3 machines
  • Duration (hrs.)
  • Job Mach 12 Mach 23
  • B 8 10
  • A 18 14
  • C 10 9
  • D 9 8

B goes 3rd-to-last.
12
Ex 3 machines Gantt Chart
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

Time (hrs.) gt
B
B
B
13
Ex 3 machines Gantt Chart
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

Time (hrs.) gt
B
A
B
A
B
A
14
Ex 3 machines Gantt Chart
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

Time (hrs.) gt
B
A
C
B
A
C
B
A
C
15
Ex 3 machines Gantt Chart
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

Time (hrs.) gt
B
A
C
D
B
A
C
D
B
A
C
D
16
Ex 3 machines Gantt Chart
  • Duration (hrs.)
  • Job Mach 1 Mach 2 Mach 3
  • B 5 3 7
  • A 13 5 9
  • C 6 4 5
  • D 7 2 6

43
31
33
37
24
28
5
8
15
18
23
32
B
A
C
D
B
A
C
D
B
A
C
D