RESEARCH - PowerPoint PPT Presentation

About This Presentation
Title:

RESEARCH

Description:

RESEARCH & EDUCATION NETWORKS -A CASE STUDY IN GHANA. SCHOOL ON RADIO USE FOR ... Accusations of University of Ghana hijacking the project to the detriment of the ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 20
Provided by: ictp
Category:

less

Transcript and Presenter's Notes

Title: RESEARCH


1
RESEARCH EDUCATION NETWORKS -A CASE STUDY IN
GHANA

  • SCHOOL ON RADIO USE FOR
  • INFORMATION AND COMMUNICATION TECHNOLOGY
  • 3rd - 21st February 2003 , Trieste (Italy)
  • Kwaku F. Awuye-Kpobi
  • E-mail
    Kpobi_at_libr.ug.edu.gh
  • Balme Library,
  • University of Ghana

2
MAP OF GHANA
3
OBJECTIVES
  • To bring all the research and educational
    institutions under one technological umbrella.
  • To link all libraries in Educational Research
    for them to take advantage of e-journals.

4
  • To harness the potential of resource-sharing
    among the universities and research centers


5
Locations covered Within Accra
  • Ghana Atomic Energy Commission
  • Center for Scientific Industrial research
  • University of Ghana Medical School

6
Outside Accra
  • Winneba (70Km from Accra)
  • Kumasi (270KM from Accra)
  • Cape-Coast (180Km from Accra)
  • Tamale (800Km from Accra)

7
IMPLEMENTATION
  • Acquisition of a VSAT (stationed Univ.. of Ghana)
  • Extension of this link to the University Library
  • Extension by Radio to some departments

8
  • Made use of an existing Cylink Radio
    transmitting at 128kbps to link the Central
    Administration Blocks
  • A mast was built at the Central Administration
    being the highest point on campus.
  • 2 Principal Base stations were setup at the
    Central Administration


9
  • One belonged to a private company which
    transmits data to from the REN to their base
    station in Accra for onward transmission to
    Kumasi and Cape-Coast
  • So all the private company is supposed to be
    doing is tunneling data from University of Ghana
    to Kwame Nkrumah University of Science
    Technology and University of Cape-Coast at 64kbps

10
  • The other base station which is managed by the
    university ICT staff is being use to serve the
    other institutions within Accra.
  • Winneba is which about 70Km from Accra uses a
    special radio which makes use of the University
    of Ghana PABX system to dial-in
  • A VSAT was procured for UDS at Tamale

11
  • Making use of an existing Cylink Radio
    transmitting at 128kbps to link the Central
    Administration Blocks
  • A mast was built at the Central Administration
    being the highest point on campus to host both
    the VHF and an Omni-directional antenna

12
(No Transcript)
13
PROBLEMS
  • Power
  • Expertise
  • Mistrust between the private company and the
    University
  • Funds
  • Flat rate for participating institutions

14
  • Threats of pulling out pulling out
  • Accusations of University of Ghana hijacking the
    project to the detriment of the other
    institutions
  • Confusion about payments and services.

15
SOLUTIONS
  • The 128kbps Cylink was changed to an 11Mb/s Radio
    but due to LOS, it has not performed as expected
  • Linux boxes were installed in KNUST UCC. These
    boxes which masqueraded IPS also have firewalls
    configured on them to make sure we have packets
    only from our designated networks

16
  • A Stand-by power generating set was acquired for
    the VSAT but the intermediary nodes were left
    out and so the problem was not fully solved.
  • GNCIC made connectivity to the other institutions
    possible

17
THE WAY FORWARD
  • The radio link connecting the Central
    Administration is being replaced with fibre optic
    cable to improve connectivity to the other
    institutions.
  • Trying to maximize the full capabilities of Open
    Source computing. E.g. Exploring Bandwidth
    management capabilities of Linux to manage the
    bandwidth allocation to individual institutions.

18
  • It is also possible for individual institutions
    to acquire separate but smaller VSAT than what
    the project currently have and sharing the
    current bandwidth among them directly from source.

19
THANKS FOR YOUR ATTENTION
Write a Comment
User Comments (0)
About PowerShow.com