Title: SAMARIS STRUCTURES WP 15
1SAMARIS STRUCTURES WP 15
2Technical Work Packages
- Strategies for repair of highway structures (TRL
Richard Woodward) - Corrosion Inhibitors (UCD Mark Richardson)
- HPFRCC (High Performance Fibre Reinforced
Cementitious Composites) materials (EPFL
Emmanuel Denarié) - Survey (ZAG Aleš Žnidaric)
3WP 12 - Strategies for repair of HSObjective
- To draw together requirements for sustainable
maintenance strategy to satisfy - functional,
- safety,
- economic and
- environmental
- requirements for highway structures
4WP 12 - Strategies for repair of HS
Deterioration as a Function of Time
Condition Performance
Minimum acceptable value
0
20
40
60
80
100
Time (years)
5WP 12 - Strategies for repair of HS Deliverables
- D2 Inception Report (Mon.6)
- D31 Guidelines on selection and use of
innovative materials for the repair of highway
structures (Mon.36)
6WP 13 Corrosion inhibitorsDeliverables
- D17 Test report on effectiveness of corrosion
inhibitor in laboratory trials (Mon.24) - D21 Test report on effectiveness of corrosion
inhibitor in field trials (Mon.30) - D25 Specification for the use of CI for
maintenance of highway structures (Mon.33)
7WP 14 HPFRCC materialsDeliverables
- D13 Report on preliminary studies for the use of
HPFRCC for maintenance of road infrastructure
components (Mon.18) - D18 Test report on laboratory testing of HPFRCC
(Mon.24) - D22 Test report on pilot field trials of HPFRCC
(Mon.30) - D26 Modelling of HPFRCC in hybrid structures
(Mon.33)
8WP 15 SurveyObjective
- To provide an updated inventory and assessment of
highway structures in selected EEA and CE
countries.
9WP 15 SurveyTasks
- 15.1 Data collection
- 15.2 Condition assessment
- 15.3 Loading
- 15.4 Structural safety
- 15.5 Survey
10WP 15 Survey 15.1 Data collection
- the most active task up to now
- subtasks
- 15.1.1 Detailed work programme
- 15.1.2 Review of existing questionnaires
- 15.1.3 Preparation of questionnaires
- 15.1.4 Meeting with subcontractors
- 15.1.5 Submission of questionnaires
- 15.1.6 Collection of structural data
- M11 Collection of structural data completed
- 15.1.7 Compilation of results
??
??
??
??
?
11WP 15 Survey 15.1 Data collection
- subtasks
- associated with subcontractors
- meeting in July in Vienna
- many useful comments
- all contracts signed and 1st year money paid
- problem
- How to make a questionnaire that will be easy as
possible to fill in and evaluate?
12WP 15 Survey 15.2 Condition Assessment
- Subtasks
- 15.2.1 Literature survey
- 15.2.2 Evaluation of questionnaires
- Assessment of codes
- Assessment of tools procedures
- Assessment of condition rating procedures
- 15.2.3 Handbook of damages
- Reorganisation of existing COST 345 handbook
- Updating the software
- Testing the software
- Feeding the data
??
13WP 15 Survey 15.3 Loading
- Subtasks
- 15.3.1 Dead loads
- Evaluation of existing procedures
- Assessment of data
- Demonstration of dead load evaluation
- subtask 15.3.2 True traffic loading
- Evaluation of available WIM data
- Evaluation of measured WIM data
- subtask 15.3.3 Live load modelling
- Evaluation of existing load models
- Development of load models
?
?
14WP 15 Survey 15.3 Loading
- Subtasks
- subtask 15.3.4 Dynamic loading
- Evaluation of dynamic loading on bridge 1
- Evaluation of dynamic loading on bridge 2
- subtask 15.3.5 Experiments
- Poland
- From October 9 to 18, 2003
- ZAG PhD student from TCD
- Slovenia
- In 2004
15WP 15 Survey 15.3 Loading
- meeting in Ljubljana on August 22nd
- discussed detailed work plan, including
experiments - 2004 long-term experiment to record dynamic
behaviour of a bridge under different conditions - traffic
- before and after major repair
- a few possible bridges identified
16WP 15 Survey 15.3 Loading
17WP 15 Survey 15.4/5 Safety Assessment/Survey
- Task 15.4 - Safety Assessment
- 15.4.1 State-of-the-art report on procedures
used - 15.4.2 Selection of countries for detailed
study - 15.4.3 Comparative study of selected EU, EEA
and CEC - 15.4.4 Proposed safety assessment methodology
- Task 15.5 - Survey
- 15.5.1 State-of-the-art report of assessment of
structures in selected EEA and CE countries - 15.5.2 Guidelines for optimised assessment of
highway structures
18WP 15 Survey Plan for Oct-Dec 2003 period
- Task 15.1 Data collection
- Dissemination of questionnaires
- Collection of questionnaires
- Beginning of compilation of results
- Task 15.2 Condition assessment
- Finishing assessment of codes and procedures
- Beginning or reorganisation of Handbook of damages
19WP 15 Survey Plan for Oct-Dec 2003 period
- Task 15.3 Loading
- Evaluation of existing procedures (cont.)
- Completion of Polish experiment
- Evaluation of available and measured WIM data
- Evaluation of dynamic loading of Polish bridge
- PhD students Nóra Áine (TCD) and Abraham Getachew
(UCD) - Task 15.4 Safety
- Selection of countries for detailed analysis
- Task 15.5 Survey
20SAMARIS web page
- New documents database in addition to public
documents - Different level of users related to UN and PW
- power users
- normal users
- sub-contractors?
- Visitors
- 2 step process of uploading