Pr - PowerPoint PPT Presentation

About This Presentation
Title:

Pr

Description:

No laboratory. Setup (very) limited. Environmental constraints ... Only ground-based site providing a duty cycle about 80-90%, much better than 70% (WET) ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 7
Provided by: mos74
Category:
Tags: laboratory

less

Transcript and Presenter's Notes

Title: Pr


1

SIAMOIS Sismomètre Interférentiel A Mesurer les
Oscillations des Intérieurs Stellaires Seismic
Interferometer A? to Measure Oscillations in the
Interior of Stars CONCLUSION / DISCUSSION
2
Scientific programme
  • Many targets (solar like oscillations, other
    pulsators). Cf Dons talk
  • Other, further targets precise selection
    criteria are required to optimize the preparatory
    work
  • d lt -45 for airmass lt 2
  • opposite to the Sun in June ? range 15-21 h
    to be avoided except if declination is very
    negative
  • Too many targets?
  • Further simulations are required
  • synthetic spectra ? performances (other types
    than FV or GV)
  • Doppler signature in specific cases for example
    g modes of g Dor targets
  • Scientific specifications (which duty cycle for
    which target)

3
Dome C
  • Constraints due to the site
  • Transportation
  • Temperature
  • No laboratory
  • Setup (very) limited
  • Environmental constraints
  • Discussion with IPEV / Experience of LUAN

4
Inputs/simulations
  • Better estimate of the duty cycle (2nd
    wintering, E. Aristidi) during the winter
    nights, during N months after and before.
  • Measurement/estimation of sky brightness photon
    noise limited performance for V 5 ? vsky gt
    17/ 2
  • Performance for magnitudes fainter than 5 (df ltlt
    2p !) faint targetrapid oscillation ? limited
    performances
  • Performance for low fringe contrasts

5
Communication (1)
  • Unique advantage of Dome Conly ground-based
    site providing 3-month long (100 days !)
    observations
  • For specific targets, 3 months or 3 x 1 month?
  • Only ground-based site providing a duty cycle
    about 80-90, much better than 70 (WET)
  • Fourier tachometer successful principle of GONG
    (in use for gt 12 years)
  • Core program/additionnal program
  • Possible evolution simultaneous multi-targets

6
Communication (2)
  • SIAMOIS ?? COROT
  • SIAMOIS ?? SONG
  • SIAMOIS ?? future project
  • Link with IPEV, IPY
  • ARENA federation of scientific projects to be
    operated at Dome C
  • (meeting June 14-16, IAP)
  • Next conferences (COROT, UAI, Vienna workshop)
  • Conclusion of the kickoff meeting ? ANR
  • We need a logo!
Write a Comment
User Comments (0)
About PowerShow.com