SVAC 8 tower testing ACD - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

SVAC 8 tower testing ACD

Description:

Tests that address quality of data and can not easily be done ... Register configuration. Flight. To study ACD performance ACD is set to VETO. Data Taking Time ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 9
Provided by: wwwglastS2
Category:
Tags: acd | svac | register | testing | tower

less

Transcript and Presenter's Notes

Title: SVAC 8 tower testing ACD


1
SVAC 8 tower testingACD
  • Anders and Eduardo

2
The rationale for SVAC Data Taking
  • Assumptions behind todays proposal
  • Tests of 8 tower testing ACD will be the last
    opportunity to take SVAC data before LAT is
    assembled
  • Remaining 8 towers will be delivered in one
    bunch
  • Most likely limited testing time mostly LPT and
    CPT
  • Reasons behind SVAC data taking requests
  • Study ACD before we use it to assess performance
  • ACD is a substitute for the muon telescope
  • discussions with Mike Huffer
  • Tests that address quality of data and can not
    easily be done in a testbed should have priority
  • Offline issues can be assigned lower priority
  • Even if Eduardo is freaking out
  • Some tests are needed to address issues that have
    been presented in the Instrument Analysis
    Workshops
  • Some test are viewed as preparation for 45(?)
    days of system testing
  • After LAT Is fully assembled

3
ACD performance and TKR readout redundancy (2 in
1 to save time)
muon
  • Objective
  • Verify that TKR readout redundancy does not
    affect hit/cluster multiplicity
  • Method
  • Trigger on ACD
  • Not sure how much to prescale yet
  • Define a MIP in the CAL
  • Select muons
  • Compare TKR variables under different readout
    configurations
  • Flight configuration for all registers
  • Just ACD_ROI1 allowed to trigger
  • ROI1 topological
  • ACD tiles shadow the towers underneath.
  • Configure the test for 8 towers
  • Side tiles are also allowed to trigger
  • May need to prescale
  • Need to sharpen the definition of ROI after
    discussions today
  • We need to look at MC right now

Mike asked us to consider placing a muon
telescope paddle underneath to use as a cross
check
For the time being avoid CAL_LE as a trigger but
do not dismiss it, it is just to expedite the
test CAL re-triggering needs to be understood if
we want to use CAL_LE as a trigger E. Grove is
writing a test plan (STR) for that
4
Multiple Trigger Engine Test
Snapshot of SVAC Config Report for current test
runs
  • Objective
  • Verify functionality required for on-orbit
    operations
  • Trigger Engine
  • Configure one trigger engine to Flight settings
  • Configure another trigger engine to CAL 4 range
    readout
  • autorange
  • ACD
  • Should ACD participate in the trigger?
  • If so, need to prescale
  • Data Taking Time
  • 4 hours
  • If ACD does not trigger need to verify estimates
    based on existing data
  • If we decide ACD should trigger we need to verify
    time estimates with MC

Mike has already checked to some level that the
digital functionality actually works (GEM
tester) We recommend to still do that test but
with lower priority compared to the ACD tests
5
ACD Inefficiency test
  • Objective
  • Verify what are the holes when the ACD is in
    VETO mode
  • Register configuration
  • Flight
  • To study ACD performance ACD is set to VETO
  • Data Taking Time
  • 2 hours
  • It is a functionality test
  • Do we need a longer run?

Muon to probe ACD inefficiency
6
CAL runs (after discussions with E. Grove)
  • Short runs
  • Full Mode High Energy Muon gain (10 min), similar
    to B13 (minus TEM diag.)
  • 4 range, auto range
  • Unsuppressed
  • FLE 100 MeV
  • FHE 1 GeV
  • LE gain 5
  • HE gain 0
  • TEM Diagnostics disabled
  • Full Mode Flight Gain (10 min)
  • 1 range, auto range
  • Unsuppressed
  • FLE 100 MeV
  • FHE 1 GeV
  • LE gain 5
  • HE gain 15 (this is new)
  • TEM Diagnostics disabled
  • Long runs
  • Flight (1 h) Will become the new B2
  • 1 range, auto-range
  • Zero suppression (LAC2 MeV)
  • FLE 100 MeV
  • FHE 1 GeV
  • LE gain 5
  • HE gain 15 (this is new)
  • TEM Diagnostics disabled
  • Muon Calibration auto-range (15 h) Same as
    current B10 runs
  • 4 range, auto-range
  • Zero suppression (LAC2 MeV)
  • FLE 100 MeV
  • FHE 1 GeV
  • LE gain 5
  • HE gain 0
  • TEM Diagnostics enabled

HE gain 13 (saturates at 50 GeV) HE gain 15
(saturates at 20 higher value) Level III(?)
Spec now requires saturation gt60 GeV
7
Definition of ROIs
  • ROI has to be adapted to 8 towers.
  • Some of the regions will have to be made much
    larger than for 16 towers
  • To account for the fact that all the towers on
    the right side of the grid are not present.
  • Will also need special ROI
  • Shadow the towers in the grid for TKR Right/Left
    readout test.
  • Coincidence between tiles on the sides (also for
    TKR Right/Left readout test).

8
Summary
  • 8 towers
  • We will calibrate all the CALs with parallelized
    scripts
  • That is the plan
  • We will take the usual B2, B10 and B13 SVAC data
    runs.
  • 8 towers ACD
  • We have proposed a certain number of runs
  • They replace the usual B2, B10 and B13 SVAC runs.
  • Are there additional test runs you would like to
    see? Runs done differently?
  • This is the time to tell us!
Write a Comment
User Comments (0)
About PowerShow.com