Title: SVAC 8 tower testing ACD
1SVAC 8 tower testingACD
2The rationale for SVAC Data Taking
- Assumptions behind todays proposal
- Tests of 8 tower testing ACD will be the last
opportunity to take SVAC data before LAT is
assembled - Remaining 8 towers will be delivered in one
bunch - Most likely limited testing time mostly LPT and
CPT - Reasons behind SVAC data taking requests
- Study ACD before we use it to assess performance
- ACD is a substitute for the muon telescope
- discussions with Mike Huffer
- Tests that address quality of data and can not
easily be done in a testbed should have priority - Offline issues can be assigned lower priority
- Even if Eduardo is freaking out
- Some tests are needed to address issues that have
been presented in the Instrument Analysis
Workshops - Some test are viewed as preparation for 45(?)
days of system testing - After LAT Is fully assembled
3ACD performance and TKR readout redundancy (2 in
1 to save time)
muon
- Objective
- Verify that TKR readout redundancy does not
affect hit/cluster multiplicity - Method
- Trigger on ACD
- Not sure how much to prescale yet
- Define a MIP in the CAL
- Select muons
- Compare TKR variables under different readout
configurations - Flight configuration for all registers
- Just ACD_ROI1 allowed to trigger
- ROI1 topological
- ACD tiles shadow the towers underneath.
- Configure the test for 8 towers
- Side tiles are also allowed to trigger
- May need to prescale
- Need to sharpen the definition of ROI after
discussions today - We need to look at MC right now
Mike asked us to consider placing a muon
telescope paddle underneath to use as a cross
check
For the time being avoid CAL_LE as a trigger but
do not dismiss it, it is just to expedite the
test CAL re-triggering needs to be understood if
we want to use CAL_LE as a trigger E. Grove is
writing a test plan (STR) for that
4Multiple Trigger Engine Test
Snapshot of SVAC Config Report for current test
runs
- Objective
- Verify functionality required for on-orbit
operations - Trigger Engine
- Configure one trigger engine to Flight settings
- Configure another trigger engine to CAL 4 range
readout - autorange
- ACD
- Should ACD participate in the trigger?
- If so, need to prescale
- Data Taking Time
- 4 hours
- If ACD does not trigger need to verify estimates
based on existing data - If we decide ACD should trigger we need to verify
time estimates with MC
Mike has already checked to some level that the
digital functionality actually works (GEM
tester) We recommend to still do that test but
with lower priority compared to the ACD tests
5ACD Inefficiency test
- Objective
- Verify what are the holes when the ACD is in
VETO mode - Register configuration
- Flight
- To study ACD performance ACD is set to VETO
- Data Taking Time
- 2 hours
- It is a functionality test
- Do we need a longer run?
Muon to probe ACD inefficiency
6CAL runs (after discussions with E. Grove)
- Short runs
- Full Mode High Energy Muon gain (10 min), similar
to B13 (minus TEM diag.) - 4 range, auto range
- Unsuppressed
- FLE 100 MeV
- FHE 1 GeV
- LE gain 5
- HE gain 0
- TEM Diagnostics disabled
- Full Mode Flight Gain (10 min)
- 1 range, auto range
- Unsuppressed
- FLE 100 MeV
- FHE 1 GeV
- LE gain 5
- HE gain 15 (this is new)
- TEM Diagnostics disabled
- Long runs
- Flight (1 h) Will become the new B2
- 1 range, auto-range
- Zero suppression (LAC2 MeV)
- FLE 100 MeV
- FHE 1 GeV
- LE gain 5
- HE gain 15 (this is new)
- TEM Diagnostics disabled
- Muon Calibration auto-range (15 h) Same as
current B10 runs - 4 range, auto-range
- Zero suppression (LAC2 MeV)
- FLE 100 MeV
- FHE 1 GeV
- LE gain 5
- HE gain 0
- TEM Diagnostics enabled
HE gain 13 (saturates at 50 GeV) HE gain 15
(saturates at 20 higher value) Level III(?)
Spec now requires saturation gt60 GeV
7Definition of ROIs
- ROI has to be adapted to 8 towers.
- Some of the regions will have to be made much
larger than for 16 towers - To account for the fact that all the towers on
the right side of the grid are not present. - Will also need special ROI
- Shadow the towers in the grid for TKR Right/Left
readout test. - Coincidence between tiles on the sides (also for
TKR Right/Left readout test).
8Summary
- 8 towers
- We will calibrate all the CALs with parallelized
scripts - That is the plan
- We will take the usual B2, B10 and B13 SVAC data
runs. - 8 towers ACD
- We have proposed a certain number of runs
- They replace the usual B2, B10 and B13 SVAC runs.
- Are there additional test runs you would like to
see? Runs done differently? - This is the time to tell us!