Status of Virgo - PowerPoint PPT Presentation

About This Presentation
Title:

Status of Virgo

Description:

Virgo Status ESF Workshop. 2. Main injection problem (2004) ... Virgo-LIGO joint analysis. Working group for burst and inspiral events ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 17
Provided by: nik56
Category:
Tags: auriga | status | virgo

less

Transcript and Presenter's Notes

Title: Status of Virgo


1
  • Status of Virgo
  • B. Mours

2
Main injection problem (2004)
  • Input Mode cleaner mirror back scattering
  • IMC instability when Power Recycling mirror
    aligned
  • Solutions
  • Sort term Factor 10 attenuation between IMC and
    PR mirror
  • Only 0.7W injected in the ITF
  • Long term add a Faraday isolator ? redesign the
    injection bench

3
Virgo Recent Progress
  • October 2004
  • First lock in recycled configuration.
  • C5 run December 2004
  • Recycled and Recombined modes.
  • 2005 Commissioning activities
  • Alignment
  • Drift controls using wavefront sensing now on all
    d.o.f.,
  • Most loops are also closed.
  • Automation,
  • Control upgrades, robustness,
  • Noise hunting,
  • Commissioning slow down by instabilities
    (jumps) during the first semester,
  • C6 and C7 commissioning runs.
  • Summer shutdown preparation
  • New injection (bench, PR mirror, ISYS
    alignment).
  • Data analysis preparation
  • Study C-run data,
  • Collaborative data analysis (LIGO-Virgo,
    Bar-Virgo).

4
Sensitivity evolution
5
C6 run
  • July 29 August 13
  • Duty cycles
  • Locking 89
  • Science mode 86

6
C6 Binaries Injections
  • Inject NS-NS
  • Online Analysis
  • 1.2-1.6 Solar Mass
  • Injections seen on the online SNRmax plots

7
C6 Burst Injections
  • Inject Sine-Gausian
  • Central frequency 460Hz
  • Nominal SNR 15
  • Example of the third injection
  • Power filter algorithm
  • Efficiency 90
  • False alarm rate .3 event/sec
  • Timing resolution 1.3ms



Centering of the North Bench quadrant!
8
C6 noise budget
9
Post C6 upgrades (I)
10
Post C6 upgrades (II)
  • Increase of modulation index gt reduction of
    PR_zCorr impact
  • Diffused light dumped on WE gt no more bump
    100-400 Hz
  • Modulation frequency tuning
  • BS coil driver upgrade
  • And LA tuning

August 27th (600kpc) with NEO2 September 12th
(850 kpc) without NEO2
11
C7 run
  • September 14 - 19
  • Duty cycles
  • Locking 70
  • Science mode 65

12
C7 Hardware injections
  • NS-NS events
  • Two online analysis
  • 1 hour of data ploted

September 19
1.2-1.6 S.M. Grid
September 15
Injected events
1-3 S.M. Grid
13
Virgo compared to LIGO
14
Virgo-LIGO joint analysis
  • Working group for burst and inspiral events
  • Up to now work on simulated data
  • Project 1a Compare analysis pipelines on the
    same data sets.
  • Project 2b Study the advantages of 3 sites for
    astrophysical sources
  • Sky location, Detection efficiency
  • 3 talks and papers (GWDAW9 and Amaldi 6)

Burst from galactic center
15
Virgo- Bars joint analysis
  • AURIGA, ROG
  • Burst events and Stochastic signals
  • Project starting with software injection
  • 4 hours of data
  • Plan to analysis C6 C7

16
Next steps
  • Sept-Dec 05 Injection shutdown
  • 2-3 months of work
  • New injection bench ? Power should go up by a
    factor 10
  • New recycled mirror ? Better controls
  • Miscellaneous changes
  • Followed by the new injection system
    commissioning
  • 2006 Commissioning data taking
  • Alignment, controls,
  • A science run by the end of 2006 (coincidence
    with LIGO-S5) ?
  • 2007
  • Data taking/Commissioning/Upgrades
  • 2008-9 Virgo
  • 50W laser, New electronic, New mirrors ? (not yet
    decided)
  • 2011(?) Advanced Virgo
  • 200W laser? New beam geometry? New mirrors?...
Write a Comment
User Comments (0)
About PowerShow.com