Quiz 6 - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

Quiz 6

Description:

To disseminate link state information (such as bandwidth, link colors ... Periodic re-optimization timer expiry. Network events (BW changes, link up/down event) ... – PowerPoint PPT presentation

Number of Views:10
Avg rating:3.0/5.0
Slides: 3
Provided by: surajL
Category:
Tags: expiry | quiz

less

Transcript and Presenter's Notes

Title: Quiz 6


1
Quiz 6
  • A1)
  • True
  • A2)
  • Strict ERO exactly specifies all nodes along the
    path. Whereas, loose ERO only specifies few nodes
    along the path.
  • A3) Briefly describe
  • In the case of loose ERO.
  • A4)
  • RRO
  • A5)
  • To disseminate link state information (such as
    bandwidth, link colors etc.) and build TE
    topology DB. Without TE DB, it is not possible to
    compute constraint-based path.

2
Quiz 6
  • A6)
  • False (LSP Id is different)
  • A7)
  • RSVP-TE, PathCalc, Link Management, TE Topology
    DB.
  • A8)
  • PathCalc
  • A9)
  • R3 generates a PathErr message upstream (towards
    R2).
  • A10)
  • Operator
  • Periodic re-optimization timer expiry
  • Network events (BW changes, link up/down event)
Write a Comment
User Comments (0)
About PowerShow.com